If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24564 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49,"lon":-82.41,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Pike Township | |
| Operator Name: BI JOE DEVELOPMENT INC | |
| Well Pad ID: | |
| Farm/Lease Name: TAYLOR TRUST | |
| License Status: Producing | |
| License Date: 2012-05-22 | |
| Spud Date: 2012-06-08 | |
| Spud Drilling Contractor: MARIC DRILLING CO. | |
| Final Drill Date: 2012-06-24 | |
| Well Total Depth: 4584.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.490000 | |
| Longitude: -82.410000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-05-22 | Proposed Formations:BEREA THRU TREMPEALEAU, Issued Date:5/22/2012, Expired Date:5/22/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-06-24 | |
| Completion Report Received | 2013-02-07 | |
| End of Confidential Data | 2013-06-24 | |
| Construction Permit Expires | 2014-05-22 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2013-02-08 | 4456 | 4506 | 30 |
| 4456 | 4506 | 30 | |
| 4456 | 4506 | 30 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2012-07-12 | ACID | 15 | 3150 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 0 | 0 | 0 | ||
| 2012 | BI JOE DEVELOPMENT INC | 876.00 | 2259.00 | 184 |
| 2013 | BI JOE DEVELOPMENT INC | 2421.00 | 3464.00 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | 2387.00 | 2777.00 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | 1915.00 | 2459.00 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | 1718.00 | 1916.00 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | 1717.00 | 1734.00 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | 1071.00 | 1559.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | BI JOE DEVELOPMENT INC | Brine | 128 | 184 |
| 2013 | BI JOE DEVELOPMENT INC | Brine | 275 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | Brine | 58 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | Brine | 177 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | Brine | 168 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | Brine | 43 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -87114232 | 2012-6-21 0:00: | DD | No Violations | |
| 0087114232 | 2012-06-21 | Drill / Deepen / Reopen | No Violations | I inspected this well location today. G & H Drilling was drilling on fluid during inspection. Depth was approximately 3275 feet. |
| 1108301794 | 2012-06-13 | Drill / Deepen / Reopen | No Violations | Joe Cross with Bi Joe Development called to inform me that the hole started to go crooked after the surface casing. G & H Drilling tripped out drill pipe and cemented the hole. G & H tripped back in and the well began to straighten itself out. |
| 1125274166 | 2013-04-10 | Preliminary Restoration | No Violations | This well is in production. |
| 1932451077 | 2012-06-18 | Drill / Deepen / Reopen | No Violations | During my inspection G & H Drilling was at approximately 2120 feet. |
For data sources see[9]