If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24575 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.39,"lon":-82.38,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Monroe Township | |
| Operator Name: BI JOE DEVELOPMENT INC | |
| Well Pad ID: | |
| Farm/Lease Name: BIJOE DEVELOPMENT INC | |
| License Status: Producing | |
| License Date: 2012-08-20 | |
| Spud Date: 2012-08-28 | |
| Spud Drilling Contractor: MARIC DRILLING CO. | |
| Final Drill Date: 2012-09-07 | |
| Well Total Depth: 4720.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.390000 | |
| Longitude: -82.380000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-08-20 | Proposed Formations:TREMPEALEAU, Issued Date:8/20/2012, Expired Date:8/20/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-09-07 | |
| Completion Report Received | 2013-02-05 | |
| End of Confidential Data | 2013-09-07 | |
| Construction Permit Expires | 2014-08-20 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2013-02-07 | 4568 | 4648 | 44 |
| 4568 | 4648 | 44 | |
| 4568 | 4648 | 44 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2012-09-12 | ACID | 15 | 3150 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 0 | 0 | 0 | ||
| 2012 | BI JOE DEVELOPMENT INC | 3600.00 | 1353.00 | 122 |
| 2013 | BI JOE DEVELOPMENT INC | 25213.00 | 2779.00 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | 18368.00 | 1897.00 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | 14397.00 | 1565.00 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | 11763.00 | 1550.00 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | 9270.00 | 1203.00 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | 7084.00 | 1195.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | BI JOE DEVELOPMENT INC | Brine | 205 | 122 |
| 2013 | BI JOE DEVELOPMENT INC | Brine | 620 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | Brine | 445 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | Brine | 415 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | Brine | 190 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | Brine | 295 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | Brine | 255 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1083306389 | 2012-8-28 0:00: | DD | No Violations | |
| 0305963623 | 2013-03-22 | Preliminary Restoration | No Violations | I inspected this well today. The well is in production and no violations. |
| 0654010187 | 2012-09-04 | Drill / Deepen / Reopen | No Violations | Maric drilling during inspection. Depth approximately 3465 feet. No violations. |
| 1083306389 | 2012-08-28 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing today for Bi Joe Development. Good returns were observed and cement stayed at the surface. Cement verified with 1% Phenolphthalein solution. |
| 305963623 | 2013-3-22 0:00: | PL | No Violations | |
| 654010187 | 2012-9-4 0:00:0 | DD | No Violations |
For data sources see[9]