If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24615 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49,"lon":-82.42,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Pike Township | |
| Operator Name: BI JOE DEVELOPMENT INC | |
| Well Pad ID: | |
| Farm/Lease Name: MIZER | |
| License Status: Producing | |
| License Date: 2014-06-16 | |
| Spud Date: 2014-08-18 | |
| Spud Drilling Contractor: MARIC DRILLING CO. | |
| Final Drill Date: 2014-08-28 | |
| Well Total Depth: 4584.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.490000 | |
| Longitude: -82.420000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-06-16 | Proposed Formations:BEREA THRU TREMPEALEAU, Issued Date:6/16/2014, Expired Date:6/15/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2014-08-28 | |
| Completion Report Received | 2014-10-27 | |
| Construction Permit Expires | 2016-06-15 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2014-11-03 | 4472 | 4492 | 21 |
| 4472 | 4492 | 21 | |
| 4472 | 4492 | 21 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2014-09-03 | ACID | 15 | 3150 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 0 | 0 | 0 | ||
| 2014 | BI JOE DEVELOPMENT INC | 112.00 | 348.00 | 93 |
| 2015 | BI JOE DEVELOPMENT INC | 590.00 | 1389.00 | 93 |
| 2016 | BI JOE DEVELOPMENT INC | 654.00 | 1207.00 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | 579.00 | 1037.00 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | 525.00 | 674.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2014 | BI JOE DEVELOPMENT INC | Brine | 40 | 93 |
| 2015 | BI JOE DEVELOPMENT INC | Brine | 50 | 93 |
| 2016 | BI JOE DEVELOPMENT INC | Brine | 55 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | Brine | 95 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -152597438 | 2014-8-21 0:00: | DD | No Violations | |
| -1930185448 | 2014-8-26 0:00: | DD | No Violations | |
| -76832140 | 2014-9-12 0:00: | PW | No Violations | |
| 0076832140 | 2014-09-12 | Production Wells | No Violations | The tank set is in place the well is producing the location is in the process of being reclaimed, the pit have been solidified and filled. |
| 0079681358 | 2014-08-18 | Drill / Deepen / Reopen | No Violations | Drilling operations were underway today during this inspection. The hole was spudded in today and they were 153 feet deep. |
| 0152597438 | 2014-08-21 | Drill / Deepen / Reopen | No Violations | Drilling operations were ongoing today. They are currently 370 feet drilling the surface bore hole construction. |
| 0383282150 | 2014-08-19 | Drill / Deepen / Reopen | No Violations | Maric drilling conducted the BOP test today during my inspection. Passed |
| 1408982264 | 2014-08-18 | Drill / Deepen / Reopen | No Violations | Universal Well Service was on site today to cement 8 5/8 surface casing. |
| 1409164682 | 2014-08-27 | Drill / Deepen / Reopen | No Violations | Drilling operations are ongoing they are currently 4483 feet and drilling. No violations. |
| 1411220423 | 2014-09-08 | Preliminary Restoration | No Violations | The location is reclaimed, Tank battery is set, area is seeded. Lease road is restored. No violations. |
| 1627228218 | 2014-08-18 | Drill / Deepen / Reopen | No Violations | Universal Well Service was on location to cement in the 8 5/8 surface casing. |
| 1930185448 | 2014-08-26 | Drill / Deepen / Reopen | No Violations | Drilling operations were ongoing during this inspection, they are currently 4002 feet and drilling. |
| 383282150 | 2014-8-19 0:00: | DD | No Violations | |
| 79681358 | 2014-8-18 0:00: | DD | No Violations |
For data sources see[9]