X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-083-24622

Well Details

Well ID: 34-083-24622
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Jackson Township
Operator Name: SAMPLES JAMES F
Well Pad ID:
Farm/Lease Name: FARMER D
License Status: Producing
License Date: 2014-08-28
Spud Date: 2014-10-29
Spud Drilling Contractor: G-R CONTRACTING
Final Drill Date: 2015-01-10
Well Total Depth: 3167.00 ft
Configuration: Vertical
Latitude: 40.300000
Longitude: -82.210000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-08-28 Proposed Formations:CLINTON, Issued Date:8/28/2014, Expired Date:8/27/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-01-10
Completion Report Received 2015-08-10
Construction Permit Expires 2016-08-27
Record Last Modified 2017-10-23

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 1500 Bbl 30000

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 SAMPLES JAMES F 644.00 1250.00 210
2016 SAMPLES JAMES F 0.00 1803.00 365
2017 SAMPLES JAMES F 0.00 1273.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 SAMPLES JAMES F Brine 450 210
2016 SAMPLES JAMES F Brine 55 365
2017 SAMPLES JAMES F Brine 50 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1162850847 2014-12-2 0:00: DD No Violations
-1170888243 2014-11-12 0:00 DD No Violations
-1176079689 2014-12-12 0:00 DD No Violations
-1384092901 2014-12-23 0:00 DD No Violations
-1638992514 2014-11-3 0:00: DD No Violations
-222504382 2014-12-30 0:00 DD No Violations
-394355833 2014-11-21 0:00 DD No Violations
-403508754 2014-12-26 0:00 DD No Violations
-985790442 2015-5-14 0:00: PW No Violations
0131775700 2014-12-09 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 2320 feet deep with the construction of the main bore.
0156460373 2014-10-28 Drill / Deepen / Reopen No Violations They were in the process of rigging up and preparing to spud the new hole. Pits are dug and lined.
0177476160 2014-12-31 Drill / Deepen / Reopen No Violations Drilling operations are ongoing 4 1/2 production casing is being ran today, Cemenco services is on location to cement in the casing.
0222504382 2014-12-30 Drill / Deepen / Reopen No Violations Drilling operations are on going, they have finished fishing out the centralizer that was lost down hole, and drilled up the remaining pieces and now are preparing to run 4 1/2 casing again.
0394355833 2014-11-21 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 1232 feet deep with the construction of the well bore.
0403508754 2014-12-26 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 3001 feet deep with the construction of the main bore.
0451475503 2014-11-09 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are currently 383 feet deep with the surface bore.
0513941316 2015-01-05 Drill / Deepen / Reopen No Violations They are in the process of drilling out the bottom hole sand preparing to Frac the well.
0985790442 2015-05-14 Production Wells No Violations Universal was on location to frack this well today.
1162850847 2014-12-02 Drill / Deepen / Reopen No Violations Inspect drill location. Currently drilling at 1950 feet.
1170888243 2014-11-12 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are currently 509 feet deep with the construction of the surface bore.
1176079689 2014-12-12 Drill / Deepen / Reopen No Violations Drilling operations are ongoing, they are 2512 feet deep with the construction of the main bore of this well.
131775700 2014-12-9 0:00: DD No Violations
1384092901 2014-12-23 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 2952 feet deep with the construction of the main bore.
1415108917 2014-10-31 Drill / Deepen / Reopen No Violations Drilling operations are on going 42 feet of drive pipe is landed and the construction of the surface bore is at 140 feet deep and drilling.
1416516314 2014-11-13 Drill / Deepen / Reopen No Violations Setting surface casing with Cemenco Service on site to cement the 8 5/8 surface casing.
1416774805 2014-11-18 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 932 feet deep with the construction of the well bore.
1420471028 2014-12-29 Drill / Deepen / Reopen No Violations Drilling operations are ongoing, they are presently fishing out 9 joints of 4 1/2 production casing and 1 centralizer that did not come back with the 4 1/2 that was dropped and retrieved.
1433527468 2015-06-05 Preliminary Restoration No Violations The well has been put into production, the pits have pumped out, filled in and smoothed off. The location has been reclaimed, and the requirements for the Preliminary Restoration have been met.
156460373 2014-10-28 0:00 DD No Violations
1638992514 2014-11-03 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with the construction of the surface bore. They are currently 340 feet and drilling.
177476160 2014-12-31 0:00 DD No Violations
1951563058 2014-11-25 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 1380 feet deep with the construction of the well bore.
451475503 2014-11-9 0:00: DD No Violations
513941316 2015-1-5 0:00:0 DD No Violations

For data sources see[8]

References