X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-083-24647

Well Details

Well ID: 34-083-24647
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Jackson Township
Operator Name: DUGAN OIL AND GAS LLC
Well Pad ID:
Farm/Lease Name: DUGAN GUY E & LINDA D
License Status: Producing
License Date: 2016-04-06
Spud Date: 2016-05-25
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 2016-08-24
Well Total Depth: 3018.00 ft
Configuration: Vertical
Latitude: 40.280000
Longitude: -82.250000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-04-06 Proposed Formations:CLINTON, Issued Date:4/6/2016, Expired Date:4/6/2018 12:00:00 PM, Drilling unit acres:104.5, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-08-24
Completion Report Received 2016-10-11
Record Last Modified 2017-10-23
Construction Permit Expires 2018-04-06

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 DUGAN OIL AND GAS LLC 0.00 1086.00 365
2017 DUGAN OIL AND GAS LLC 0.00 868.00 260
2018 DUGAN OIL AND GAS LLC 0.00 374.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 DUGAN OIL AND GAS LLC Brine 0 365
2017 DUGAN OIL AND GAS LLC Brine 0 260
2018 DUGAN OIL AND GAS LLC Brine 0 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1052597430 2016-6-15 0:00: DD No Violations
-1211018431 2016-6-2 0:00:0 DD No Violations
-1306997632 2016-7-7 0:00:0 DD No Violations
-1888602331 2016-6-8 0:00:0 CS No Violations 3.00
-2016294691 2016-8-18 0:00: DD No Violations
0321558690 2016-06-20 Drill / Deepen / Reopen No Violations Drilling operations are on going with this well. Today they ran 945 feet of 7 inch intermediate string.
0419715387 2016-06-10 Drill / Deepen / Reopen No Violations Drilling operations are on going with this well. The 8 5/8 surface casing has been ran and cemented by Cemenco Services. There was a good amount of cement circulated to the surface with no fall back down hole.
0426815059 2016-08-19 Drill / Deepen / Reopen No Violations Cemenco Services Inc. was on site today to cement in the production casing.
1019634437 2016-06-23 Drill / Deepen / Reopen No Violations Drilling operations are on going with the construction of this well bore. They are currently drilling at 1202 feet.
1052597430 2016-06-15 Drill / Deepen / Reopen No Violations Drilling operations are on going with this well. They are currently 820 feet deep with the construction of the intermediate string bore.
1211018431 2016-06-02 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with this well. They are currently 360 feet deep with the construction of the surface bore of this well.
1306997632 2016-07-07 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with the construction of the main well bore. They are presently 1840 feet and drilling.
1375508379 2016-05-20 Drill / Deepen / Reopen No Violations They are in the process of finishing up getting the rig set up to drill, and lining the pits to spud this well.
1474291875 2016-07-01 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with the construction of the main well bore. The are currently 1535 feet deep and drilling.
1481130478 2016-08-16 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with this well. They are presently drilling at 2950 feet just on top of the Clinton sands.
1884176450 2016-05-13 Drill / Deepen / Reopen No Violations They are in the process of moving onto the location and rigging up to prepare to spud this new well.
1888602331 2016-06-08 Casing String Witnessed No Violations On the day of my inspection Guy Dugan had used 8.625 casing ran to a depth of 488 in a 10.75 hole. The casing was equipped with two centralizers and Dugan produced documentation that the casing had been tested and drifted. Cemenco ran gel and cotton seed hulls ahead of the cement. The well circulated just before Cemenco dropped the plug to start displacement. Circulation was maintained throughout displacement with good cement returns. Upon landing the plug Cemenco pressured up to 500 psi and shut in for 5 minutes. The pressure held and the test passed.
2016294691 2016-08-18 Drill / Deepen / Reopen No Violations They are currently removing the collars from the 5 inch production casing and butt welding them together to allow for proper spacing through the cement zone for the production casing.
2036066368 2016-05-25 Drill / Deepen / Reopen No Violations Drilling operations started today with the spudding of this well. The drive pipe was set today at 54 feet and landed in the bedrock.
321558690 2016-6-20 0:00: DD No Violations
419715387 2016-6-10 0:00: DD No Violations
426815059 2016-8-19 0:00: DD No Violations

For data sources see[7]

References