| Well ID: 34-083-24662 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.26,"lon":-82.29,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Clay Township | |
| Operator Name: VALLEY PETROLEUM MANAGEMENT | |
| Well Pad ID: | |
| Farm/Lease Name: DUGAN JOHNSON | |
| License Status: Producing | |
| License Date: 2018-07-20 | |
| Spud Date: 2018-08-27 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 2018-09-21 | |
| Well Total Depth: 2950.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.260000 | |
| Longitude: -82.290000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2018-07-20 | Proposed Formations:CLINTON, Issued Date:7/20/2018, Expired Date:7/19/2020 12:00:00 PM, Drilling unit acres:135, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2018-09-21 | TD FROM INSPECTION REPORT |
| Record Last Modified | 2019-04-09 | TD FROM INSPECTION REPORT |
| Construction Permit Expires | 2020-07-19 | TD FROM INSPECTION REPORT |
For data sources see[2]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1298139764 | 2018-8-28 0:00: | DD | No Violations | |
| -135943521 | 2018-9-6 0:00:0 | DD | No Violations | |
| -1427222216 | 2018-8-22 0:00: | DD | No Violations | |
| -1777462398 | 2018-9-4 0:00:0 | DD | No Violations | |
| -595576357 | 2018-8-30 0:00: | DD | No Violations | |
| -632808280 | 2018-9-18 0:00: | DD | No Violations | |
| -859198575 | 2018-10-1 0:00: | PW | No Violations | |
| 0135943521 | 2018-09-06 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with the construction of the surface bore of this well. They are currently 455 feet deep and drilling. There were no issues observed during this inspection to note. |
| 0174848393 | 2018-09-19 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with this well. Today they were 2772feet deep and drilling, There were no issues to note at the time of this inspection. |
| 0211128238 | 2018-08-29 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with the construction of the surface bore of this well. They are currently 80 feet deep and drilling. There were no issues observed during this inspection to note. |
| 0260795819 | 2018-08-24 | Drill / Deepen / Reopen | No Violations | H & D Drilling is rig up and preparing to spud in this new well. There were no issues observed to note during this inspection. |
| 0499403281 | 2018-09-21 | Drill / Deepen / Reopen | No Violations | Drilling operations continued today. The well was logged and 4 1/2 production casing was ran and cemented in at 2945 feet. |
| 0595576357 | 2018-08-30 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with the construction of the surface bore of this well. They are currently 160 feet deep and drilling. There were no issues observed during this inspection to note. |
| 0632808280 | 2018-09-18 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with this well. Today they were 2532 feet deep and drilling, There were no issues to note at the time of this inspection. |
| 0859198575 | 2018-10-01 | Production Wells | No Violations | H & D Drilling is moving off the drilling rig and drilling equipment from the well site today. |
| 0877849423 | 2018-09-20 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with this well. Today they reached the total depth of 2955 feet. They conditioned the well bore and pulled and laid down the drilling pipe. The well will be logged on 9/21/2018, production casing ran and cemented in. |
| 1078159983 | 2018-09-11 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with the construction of this new well. Today they were drilling and are currently 584 feet deep. There were no issues observed to note during this inspection. |
| 1298139764 | 2018-08-28 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with the construction of this well. They spudded the well on 8/27/2018 and are currently 12 feet deep setting drive pipe. There were no issues to note during this inspection. |
| 1318939401 | 2018-09-14 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with this well. Today they were 1982 feet deep and drilling, There were no issues to note at the time of this inspection. |
| 1405741328 | 2018-08-27 | Drill / Deepen / Reopen | No Violations | Drilling operations have began with the drilling of this new well. The well was spudded today and they are in the process of setting the drive pipe. |
| 1427222216 | 2018-08-22 | Drill / Deepen / Reopen | No Violations | The location for this well has been made and H & D Drilling is in the process of getting moved in to spud this well. |
| 1536240594 | 2018-09-05 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with the construction of the surface bore of this well. They were down today changing out the drilling line. The old one was removed and the new one is in the process of being installed. |
| 1536854661 | 2018-09-13 | Drill / Deepen / Reopen | No Violations | Drilling operations continue today with the construction of this new well. H & D Drilling are at 1200 feet and tripping out the bit today to get it unplugged. Then they will run back in and resume drilling. There were no issues to note today during this inspection to note. |
| 1591514841 | 2018-08-23 | Drill / Deepen / Reopen | No Violations | H & D Drilling is moving in their rig and getting rigged up to spud in this new well. |
| 1729881558 | 2018-09-07 | Drill / Deepen / Reopen | No Violations | Drilling operations continue today with the construction of this well. Today 518 feet of 7 inch surface casing was ran and cemented in. Formation Cementing Inc. was on site to cement in the surface casing. The well circulated and brought back 4 barrels of cement back to the surface and there was no flow back into the hole. The plug was landed and held 550 pounds of pressure for 15 minutes. |
| 174848393 | 2018-9-19 0:00: | DD | No Violations | |
| 1777462398 | 2018-09-04 | Drill / Deepen / Reopen | No Violations | Drilling operations continue with the construction of the surface bore of this well. They are currently 380 feet deep and drilling. There were no issues observed during this inspection to note. |
| 1898138704 | 2018-09-20 | Drill / Deepen / Reopen | No Violations | Drilling operations continued today. The well was drilled in at a total depth of 2955 feet. The drilling pipe was pulled and laid down to allow the well to be logged and the production casing ran. |
| 211128238 | 2018-8-29 0:00: | DD | No Violations | |
| 260795819 | 2018-8-24 0:00: | DD | No Violations | |
| 499403281 | 2018-9-21 0:00: | DD | No Violations | |
| 877849423 | 2018-9-20 0:00: | DD | No Violations |