If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-085-20296 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.75,"lon":-81.21,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Lake | |
Municipality: Painesville Township | |
Operator Name: MIHALIK PAUL | |
Well Pad ID: | |
Farm/Lease Name: TRESGER EDWARD H INC | |
License Status: Producing | |
License Date: 1980-07-17 | |
Spud Date: 1980-08-05 | |
Spud Drilling Contractor: | |
Final Drill Date: 1980-08-11 | |
Well Total Depth: 3070.00 ft | |
Configuration: Vertical | |
Latitude: 41.750000 | |
Longitude: -81.210000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1980-07-17 | 858 DRILLEX INC GeoDate 7/17/80 |
Original Spud | 1980-08-05 | |
Completed | 1980-08-11 | |
Reached Total Depth | 1980-08-11 | |
Change of Owner | 2003-10-06 | Operator changed from 858, DRILLEX INC to 7531, MIHALIK PAUL |
Record Last Modified | 2019-06-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 2900 | 2970 | 28 |
2900 | 2970 | 28 | |
2900 | 2970 | 28 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1200 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | DRILLEX INC | 5155.00 | 26.00 | 0 |
1985 | DRILLEX INC | 3389.00 | 0.00 | 365 |
1986 | DRILLEX INC | 3303.00 | 26.00 | 365 |
1987 | DRILLEX INC | 4167.00 | 0.00 | 365 |
1988 | DRILLEX INC | 2885.00 | 0.00 | 365 |
1989 | DRILLEX INC | 1444.00 | 0.00 | 365 |
1990 | DRILLEX INC | 559.00 | 28.00 | 365 |
1991 | DRILLEX INC | 1634.00 | 14.00 | 365 |
1992 | DRILLEX INC | 2658.00 | 0.00 | 365 |
1993 | DRILLEX INC | 862.00 | 0.00 | 365 |
1994 | DRILLEX INC | 518.00 | 0.00 | 365 |
1995 | DRILLEX INC | 638.00 | 0.00 | 365 |
1996 | DRILLEX INC | 480.00 | 0.00 | 365 |
1998 | DRILLEX INC | 720.00 | 0.00 | 365 |
1999 | DRILLEX INC | 496.00 | 0.00 | 365 |
2000 | DRILLEX INC | 128.00 | 0.00 | 365 |
2001 | DRILLEX INC | 56.00 | 0.00 | 365 |
2002 | DRILLEX INC | 0.00 | 0.00 | 365 |
2003 | DRILLEX INC | 0.00 | 0.00 | 365 |
2004 | MIHALIK PAUL | 0.00 | 0.00 | 0 |
2005 | MIHALIK PAUL | 50.00 | 0.00 | 7 |
2006 | MIHALIK PAUL | 0.00 | 0.00 | 0 |
2008 | MIHALIK PAUL | 0.00 | 0.00 | 0 |
2009 | MIHALIK PAUL | 0.00 | 0.00 | 0 |
2010 | MIHALIK PAUL | 0.00 | 0.00 | 0 |
2011 | MIHALIK PAUL | 0.00 | 0.00 | 0 |
2012 | MIHALIK PAUL | 0.00 | 0.00 | 0 |
2013 | MIHALIK PAUL | 158.00 | 0.00 | 30 |
2014 | MIHALIK PAUL | 92.00 | 0.00 | 60 |
2015 | MIHALIK PAUL | 84.00 | 0.00 | 60 |
2016 | MIHALIK PAUL | 46.00 | 0.00 | 62 |
2017 | MIHALIK PAUL | 46.00 | 0.00 | 28 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | DRILLEX INC | Brine | 185 | 0 |
1985 | DRILLEX INC | Brine | 100 | 365 |
1986 | DRILLEX INC | Brine | 147 | 365 |
1987 | DRILLEX INC | Brine | 180 | 365 |
1988 | DRILLEX INC | Brine | 110 | 365 |
1989 | DRILLEX INC | Brine | 210 | 365 |
1990 | DRILLEX INC | Brine | 23 | 365 |
1991 | DRILLEX INC | Brine | 64 | 365 |
1992 | DRILLEX INC | Brine | 147 | 365 |
1993 | DRILLEX INC | Brine | 54 | 365 |
1994 | DRILLEX INC | Brine | 93 | 365 |
1995 | DRILLEX INC | Brine | 67 | 365 |
1996 | DRILLEX INC | Brine | 75 | 365 |
1998 | DRILLEX INC | Brine | 55 | 365 |
1999 | DRILLEX INC | Brine | 35 | 365 |
2000 | DRILLEX INC | Brine | 0 | 365 |
2001 | DRILLEX INC | Brine | 42 | 365 |
2002 | DRILLEX INC | Brine | 63 | 365 |
2003 | DRILLEX INC | Brine | 80 | 365 |
2004 | MIHALIK PAUL | Brine | 0 | 0 |
2005 | MIHALIK PAUL | Brine | 0 | 7 |
2006 | MIHALIK PAUL | Brine | 0 | 0 |
2008 | MIHALIK PAUL | Brine | 0 | 0 |
2009 | MIHALIK PAUL | Brine | 0 | 0 |
2010 | MIHALIK PAUL | Brine | 0 | 0 |
2011 | MIHALIK PAUL | Brine | 0 | 0 |
2012 | MIHALIK PAUL | Brine | 0 | 0 |
2013 | MIHALIK PAUL | Brine | 8 | 30 |
2014 | MIHALIK PAUL | Brine | 0 | 60 |
2015 | MIHALIK PAUL | Brine | 0 | 60 |
2016 | MIHALIK PAUL | Brine | 0 | 62 |
2017 | MIHALIK PAUL | Brine | 0 | 28 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0909908542 | 2010-11-19 | Production Wells | No Violations | There were no violations at the time of inspection. |
1418828649 | 2014-12-17 | UrbanProduction Wells | No Violations | I inspected the location of this producing unit as part of routine inspection activity. The wellhead and battery are located . At the wellhead there is valve-tree and concoil system. The battery is comprised of 1 100-barrel production tank and separator. At the time of this inspection, the tank has been taken out of service. The well elements have been recently painted and are in good repair with no signs of leakage or problems. ID signage and secondary containment are present. Load-outs are bull-plugged. |
1497483733 | 2013-05-13 | UrbanProduction Wells | No Violations | I could not locate the wellhead. The tank battery consists of 1 100-barrel tank and mechanical separator, not enclosed. Secondary containment is present and adequate. Some brine leakage has occurred from the base of the tank. I contacted Paul Mihalik regarding the issue. He indicated that the tank will be replaced immediately. |
1594252086 | 2017-11-17 | UrbanProduction Wells | No Violations | I inspected this well location as a follow-up to Chiefs Order 2017-403., issued on 11/07/17 for non-reported produciton for 2016. At the time of this inspection, the well, comprised of a concoil-type plunger lift unit and tank battery with one steel, 100-barrel stock tank, was shut-in and not producing. I contacted Paul Mihalik about the production reports and he indicated that he is working on recovering the data that had been lost on a computer hard drive malfunction. He planned to file the report by the deadline. |
909908542 | 2010-11-19 0:00 | PW | No Violations |
For data sources see[9]