If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-085-20383 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.75,"lon":-81.22,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Lake | |
Municipality: Painesville Township | |
Operator Name: MIHALIK PAUL | |
Well Pad ID: | |
Farm/Lease Name: TRESGER | |
License Status: Producing | |
License Date: 1982-07-14 | |
Spud Date: 1982-08-15 | |
Spud Drilling Contractor: H.L.H. DRLG | |
Final Drill Date: 1982-08-19 | |
Well Total Depth: 2997.00 ft | |
Configuration: Vertical | |
Latitude: 41.750000 | |
Longitude: -81.220000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1982-07-14 | 858 DRILLEX INC GeoDate 7/14/82 |
Oil and Gas | 1982-07-14 | Issued Date 7/14/82 Expired Date 1/1/83 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 02997 Proposed Drill Depth 02997 |
Original Spud | 1982-08-15 | PERMIT EXPIRED. |
Completed | 1982-08-19 | PERMIT EXPIRED. |
Reached Total Depth | 1982-08-19 | PERMIT EXPIRED. |
Construction Permit Expires | 1983-01-01 | PERMIT EXPIRED. |
Completion Report Received | 1985-01-10 | PERMIT EXPIRED. |
Change of Owner | 2003-10-06 | Operator changed from 858, DRILLEX INC to 7531, MIHALIK PAUL |
Record Last Modified | 2017-02-15 | PERMIT EXPIRED. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 2857 | 2896 | 0 |
2857 | 2896 | 0 | |
2006-09-11 | 2868 | 2895 | 2 |
2868 | 2895 | 2 | |
2857 | 2896 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1200 Bbl | 40000 | FRAC: H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | DRILLEX INC | 11702.00 | 54.00 | 0 |
1985 | DRILLEX INC | 8411.00 | 0.00 | 365 |
1986 | DRILLEX INC | 3683.00 | 0.00 | 365 |
1987 | DRILLEX INC | 2828.00 | 0.00 | 365 |
1988 | DRILLEX INC | 2314.00 | 0.00 | 365 |
1989 | DRILLEX INC | 2569.00 | 0.00 | 365 |
1990 | DRILLEX INC | 2847.00 | 0.00 | 365 |
1991 | DRILLEX INC | 2273.00 | 9.00 | 365 |
1992 | DRILLEX INC | 2578.00 | 0.00 | 365 |
1993 | DRILLEX INC | 1366.00 | 0.00 | 365 |
1994 | DRILLEX INC | 646.00 | 0.00 | 365 |
1995 | DRILLEX INC | 767.00 | 0.00 | 365 |
1996 | DRILLEX INC | 1133.00 | 0.00 | 365 |
1998 | DRILLEX INC | 1369.00 | 0.00 | 365 |
1999 | DRILLEX INC | 839.00 | 0.00 | 365 |
2000 | DRILLEX INC | 1059.00 | 0.00 | 365 |
2001 | DRILLEX INC | 895.00 | 0.00 | 365 |
2002 | DRILLEX INC | 5348.00 | 0.00 | 365 |
2003 | DRILLEX INC | 4331.00 | 0.00 | 365 |
2004 | MIHALIK PAUL | 1317.00 | 0.00 | 365 |
2005 | MIHALIK PAUL | 1201.00 | 0.00 | 365 |
2006 | MIHALIK PAUL | 1857.00 | 0.00 | 365 |
2008 | MIHALIK PAUL | 1751.00 | 0.00 | 365 |
2009 | MIHALIK PAUL | 898.00 | 0.00 | 365 |
2010 | MIHALIK PAUL | 753.00 | 0.00 | 365 |
2011 | MIHALIK PAUL | 1157.00 | 0.00 | 365 |
2012 | MIHALIK PAUL | 980.00 | 0.00 | 366 |
2013 | MIHALIK PAUL | 954.00 | 0.00 | 365 |
2014 | MIHALIK PAUL | 1706.00 | 0.00 | 365 |
2015 | MIHALIK PAUL | 941.00 | 0.00 | 210 |
2016 | MIHALIK PAUL | 576.00 | 0.00 | 146 |
2017 | MIHALIK PAUL | 925.00 | 0.00 | 230 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | DRILLEX INC | Brine | 280 | 0 |
1985 | DRILLEX INC | Brine | 165 | 365 |
1986 | DRILLEX INC | Brine | 271 | 365 |
1987 | DRILLEX INC | Brine | 235 | 365 |
1988 | DRILLEX INC | Brine | 73 | 365 |
1989 | DRILLEX INC | Brine | 45 | 365 |
1990 | DRILLEX INC | Brine | 0 | 365 |
1991 | DRILLEX INC | Brine | 48 | 365 |
1992 | DRILLEX INC | Brine | 152 | 365 |
1993 | DRILLEX INC | Brine | 67 | 365 |
1994 | DRILLEX INC | Brine | 66 | 365 |
1995 | DRILLEX INC | Brine | 61 | 365 |
1996 | DRILLEX INC | Brine | 28 | 365 |
1998 | DRILLEX INC | Brine | 22 | 365 |
1999 | DRILLEX INC | Brine | 15 | 365 |
2000 | DRILLEX INC | Brine | 0 | 365 |
2001 | DRILLEX INC | Brine | 23 | 365 |
2002 | DRILLEX INC | Brine | 101 | 365 |
2003 | DRILLEX INC | Brine | 46 | 365 |
2004 | MIHALIK PAUL | Brine | 113 | 365 |
2005 | MIHALIK PAUL | Brine | 30 | 365 |
2006 | MIHALIK PAUL | Brine | 42 | 365 |
2008 | MIHALIK PAUL | Brine | 82 | 365 |
2009 | MIHALIK PAUL | Brine | 21 | 365 |
2010 | MIHALIK PAUL | Brine | 36 | 365 |
2011 | MIHALIK PAUL | Brine | 19 | 365 |
2012 | MIHALIK PAUL | Brine | 0 | 366 |
2013 | MIHALIK PAUL | Brine | 23 | 365 |
2014 | MIHALIK PAUL | Brine | 70 | 365 |
2015 | MIHALIK PAUL | Brine | 10 | 210 |
2016 | MIHALIK PAUL | Brine | 0 | 146 |
2017 | MIHALIK PAUL | Brine | 0 | 230 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1670469686 | 2013-5-13 0:00: | UP | No Violations | |
000PL14413 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0726680165 | 2018-11-28 | UrbanProduction Wells | No Violations | I conducted an inspection on this well. At the time of this inspection, the well was equipped with a Concoil plunger lift assembly. The well was in production during this inspection. The tank battery consisted of one 100 BBL tank and a heater treater separator. Valves on the separator were open and the chart showed production. Wells 2-0382 and 2-0384 were also produced into this tank battery. The 100 BBL tank was diked but the separator was located outside of the diked area. Legible identification was located at the well and tank battery. The lease access was stable. No violations observed. |
1418834090 | 2014-12-17 | UrbanProduction Wells | No Violations | I inspected the location of this producing unit as part of routine inspection activity. The wellhead and battery are located in an un-developed portion of the former Fairway Pines Golf Club. At the wellhead there is valve-tree and concoil system. The battery is comprised of 1 100-barrel production tank and 1 100-barrel brine tank, and separator. The well elements are in good repair with no signs of leakage or problems. ID signage and secondary containment are present at the battery. Load-outs are bull-plugged. According to the signage, the battery is shared with the #8 (#2-0382) and the # 10 (#2-384) units. There is no ID at these wellheads. I asked Paul Mihalik to begin working on getting signage at the wellheads. |
1670469686 | 2013-05-13 | UrbanProduction Wells | No Violations | The producing unit consists of the following elements: a concoil unit at the wellhead and a tank battery with 1 100-barrel steel tank, and associated mechanical separator. The tank battery is shared with the Tresger 8 and 10 units (API # 3408520382 and 3408520384)). Secondary containment is present and adequate. The loadout valve needs locked. Identification is needed at the wellhead. I contacted Paul Mihalik regarding the deficiencies. He indicated that theft of signs has been a problem in this area, but he would work to resolve the issues in the next two weeks. |
726680165 | 2018-11-28 0:00 | UP | No Violations | |
PL14413 | PL | No Violations |
For data sources see[9]