Well Details

Well ID: 34-087-20404
Loading map...
Country: United States
State: Ohio
County: Lawrence
Municipality: Mason Township
Operator Name: PILLAR ENERGY LLC
Well Pad ID:
Farm/Lease Name: PAYNE PEARL V
License Status: Active Injection
License Date: 1990-10-01
Spud Date: 1987-02-02
Spud Drilling Contractor: GARD DRILLING
Final Drill Date: 1987-02-03
Well Total Depth: 642.00 ft
Configuration: Vertical
Latitude: 38.630000
Longitude: -82.440000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1987-02-02 CONVERT 10-6-90, CONVERT 2-15-92
Reached Total Depth 1987-02-03 CONVERT 10-6-90, CONVERT 2-15-92
Completion Report Received 1987-03-02 CONVERT 10-6-90, CONVERT 2-15-92
CO 1990-10-01 1089 MITCHELL ENERGY CORP GeoDate 10/1/90
Enhanced Recovery 1990-10-01 Issued Date 10/1/90 Expired Date 10/1/91 Acres 0001000 Tool Type RTF Proposed Formation COW RUN Proposed Depth 00000 Proposed Drill Depth 00000
Completed 1991-05-16 CONVERT 10-6-90, CONVERT 2-15-92
Construction Permit Expires 1991-10-01 CONVERT 10-6-90, CONVERT 2-15-92
Annulus Pressure Monitoring Approved 1993-07-16 CONVERT 10-6-90, CONVERT 2-15-92
Change of Owner 1999-10-22 Operator changed from 1089, MITCHELL ENERGY CORP to 3793, ENERGY SEARCH INC
Change of Owner 2008-02-26 Operator changed from 3793, ENERGY SEARCH INC to 1388, NORTH COAST ENERGY INC
Change of Owner 2009-12-14 Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC
Last Compliance Report 2014-11-14 CONVERT 10-6-90, CONVERT 2-15-92
Change of Owner 2016-02-24 Operator changed from 7578, ENERVEST OPERATING LLC to 9619, PILLAR ENERGY LLC
Record Last Modified 2017-02-15 CONVERT 10-6-90, CONVERT 2-15-92

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-05-25 579 582 4
579 582 4
579 582 4

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 FRAC WITH 164 BBLS H2O AND 9000# OF 20/40 SAND
Not Treated 0 164 Bbl 9000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 MITCHELL ENERGY CORP 0.00 3761.00 311
1988 MITCHELL ENERGY CORP 0.00 4065.00 365
1989 MITCHELL ENERGY CORP 0.00 2280.00 350
1990 MITCHELL ENERGY CORP 12.00 858.00 365
1991 MITCHELL ENERGY CORP 2.00 58.00 44
1993 MITCHELL ENERGY CORP 0.00 0.00 0
1994 MITCHELL ENERGY CORP 0.00 0.00 365
1995 MITCHELL ENERGY CORP 0.00 0.00 0
1997 MITCHELL ENERGY CORP 0.00 0.00 0
1998 MITCHELL ENERGY CORP 0.00 0.00 0
1999 ENERGY SEARCH INC 0.00 0.00 60
2000 ENERGY SEARCH INC 0.00 0.00 365
2008 EXCO - NORTH COAST ENERGY INC 0.00 0.00 366
2009 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0
2010 ENERVEST OPERATING LLC 0.00 0.00 0
2011 ENERVEST OPERATING LLC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 MITCHELL ENERGY CORP Brine 40 311
1988 MITCHELL ENERGY CORP Brine 62 365
1989 MITCHELL ENERGY CORP Brine 173 350
1990 MITCHELL ENERGY CORP Brine 179 365
1991 MITCHELL ENERGY CORP Brine 51 44
1993 MITCHELL ENERGY CORP Brine 0 0
1994 MITCHELL ENERGY CORP Brine 0 365
1995 MITCHELL ENERGY CORP Brine 0 0
1997 MITCHELL ENERGY CORP Brine 0 0
1998 MITCHELL ENERGY CORP Brine
1999 MITCHELL ENERGY CORP Brine
2000 ENERGY SEARCH INC Brine 365
2008 EXCO - NORTH COAST ENERGY INC Brine 0 366
2009 EXCO - NORTH COAST ENERGY INC Brine 0 0
2010 ENERVEST OPERATING LLC Brine 0 0
2011 ENERVEST OPERATING LLC Brine 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1146781437 2017-3-17 0:00: ER No Violations 0.70
-119859324 2020-5-4 0:00:0 ER No Violations 1.00
-121675792 2006-11-21 0:00 ER No Violations
-1241618309 2013-7-15 0:00: ER No Violations 0.50
-1248471855 2018-5-24 0:00: ER No Violations 1.50
-1272997865 2018-10-22 0:00 ER No Violations 0.50
-1283516073 2020-7-20 0:00: ER No Violations 0.50
-1309063166 2006-8-15 0:00: ER No Violations
-1341788934 2004-5-20 0:00: SW No Violations
-142436653 2009-8-17 0:00: ER No Violations
-143215750 2014-12-15 0:00 ER No Violations 0.50
-1440516718 2014-2-13 0:00: ER No Violations 2.00
-1503165837 2015-4-6 0:00:0 ER No Violations 0.50
-1718708937 2010-6-7 0:00:0 ER No Violations 1.00
-1738996778 2016-8-16 0:00: ER No Violations 1.00
-1934747974 2016-6-6 0:00:0 ER No Violations 1.00
-258643675 2010-9-8 0:00:0 ER No Violations 0.50
-290034226 2016-3-28 0:00: ER No Violations 1.00
-316497182 2012-12-28 0:00 ER No Violations 0.70
-320369643 2003-2-7 0:00:0 ER No Violations
-353647396 2019-1-11 0:00: ER No Violations 0.50
-390567685 2005-4-28 0:00: ER No Violations
-405570450 2013-1-7 0:00:0 SC No Violations 2.50
-478400522 2006-3-29 0:00: ER No Violations
-503305246 2011-12-9 0:00: ER No Violations 0.30
-525261473 2003-11-6 0:00: ER No Violations
-552820544 2004-5-25 0:00: SW No Violations
-674580927 2019-4-23 0:00: ER No Violations 1.30
-748662854 2010-3-8 0:00:0 ER No Violations
-770759449 2008-6-12 0:00: ER No Violations
-792001781 2015-6-15 0:00: ER No Violations 0.50
-832846783 2008-3-25 0:00: ER No Violations
-840227128 2019-9-5 0:00:0 ER No Violations 1.50
-848654995 2016-10-6 0:00: ER No Violations 2.50
-872142485 2020-1-21 0:00: ER No Violations 1.00
-932031664 2015-10-13 0:00 ER No Violations 0.70
-932108988 2012-12-28 0:00 ER No Violations 0.70
000UIC1129 1991-06-18 Enhanced Recovery Project No Violations 1501:9-5-06 CONTAM.& POLLUTION
000UIC1133 1991-06-18 Enhanced Recovery Project No Violations 1509.03 RULES & REG.
0017600636 2007-09-25 Enhanced Recovery Project No Violations No violations at this time.
0121675792 2006-11-21 Enhanced Recovery Project Violations Noted No Annulus Pressure
0142436653 2009-08-17 Enhanced Recovery Project No Violations Good identification. No violations observed during inspection.
0143215750 2014-12-15 Enhanced Recovery Project No Violations inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Good identification at the well.
0191133654 2007-04-05 Enhanced Recovery Project No Violations No problems, Jim Ross has grated the lease roads.
0254565447 2013-03-08 Enhanced Recovery Project No Violations Inspected the injection pressure and the annulus pressure. Inspected the unloading pad, containment dike and the pump house. There is an excavated area behind the pump house that has exposed the injection lines. Work is ongoing to repair or replace the lines. Good identification at the wellhead. Accompanied by Morgan Button MRI 2.
0258643675 2010-09-08 Enhanced Recovery Project No Violations Good Id. No violations.
0290034226 2016-03-28 Enhanced Recovery Project Violations Noted Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification has not been changed from Enervest to Pillar Energy. The injection line has been temporarily repaired with a compression clamp. There is a scald area 14 feet by 3 feet. I talked to Jim Ross about the need to replace the joint of injection line that leaked, and to remediate the contaminated area.
0316497182 2012-12-28 Enhanced Recovery Project No Violations Inspected injection tubing and annulus pressures for this well with Jon Scott. Well identification sign in good shape.
0320369643 2003-02-07 Enhanced Recovery Project Violations Noted Injection pressure measured was 51 psi over maximum. Notified operator.
0353647396 2019-01-11 Enhanced Recovery Project No Violations Inspected the injection pressure and annulus pressure. Identification is posted.
0371584829 2016-03-29 Enhanced Recovery Project No Violations Compliance Notice # 290034226 follow up inspection. The section of leaking steal line has been replaced with 2 plastic line. Line was tested at 200 psi for 15 minutes with no loss in pressure. The contaminated soil has not been remediated. I talked to Jim Ross about his plans for remediation.
0390567685 2005-04-28 Enhanced Recovery Project No Violations Passed.
0405570450 2013-01-07 Surface Facility Construction No Violations Concrete dike pad has been poured. Concrete block and mortar is on site. Extended concrete apron to unloading pad.
0431629916 2015-06-23 Salt Water Injection Well No Violations No noted violations.
0435999986 2011-04-01 Enhanced Recovery Project No Violations Injection line is shut off due to leak in line.
0442412125 2011-08-02 Enhanced Recovery Project No Violations Good identification. No violations observed during inspection.
0448978140 2005-11-10 Enhanced Recovery Project No Violations
0467193700 2009-11-17 Enhanced Recovery Project No Violations Good Identification. No violations observed during inspection.
0472845371 2014-08-18 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, walked the injection line, checked the injection pressure and annulus pressure. Good identification at wellhead. The top joint of injection tubing is flaking rust and steel. I talked to Jim ross about the need to replace the top joint of injection tubing before it looses mechanical integrity.
0478400522 2006-03-29 Enhanced Recovery Project No Violations Within limits
0503305246 2011-12-09 Enhanced Recovery Project No Violations Accompanied Jon Scott for ERP training. Site clean, not exceeding max injection.
0525261473 2003-11-06 Enhanced Recovery Project Violations Noted Injection pressure was measured at 186 psi, which is 10 psi over the maximum allowable injection pressure. 11/6/03 NOV FOLLOW-UP: Well is in compliance.
0552820544 2004-05-25 Salt Water Injection Well No Violations Rechecked tubing pressure - in compliance now.
0598484711 2013-12-11 Surface Facility Construction No Violations Inspected the changes that have been made to the pump house injection line manifolds and the change over to a different injection pump. Inspected the unloading pad, containment dike and tanks.
0656499585 2010-12-20 Enhanced Recovery Project No Violations Good identification.
0669142259 2007-05-31 Enhanced Recovery Project No Violations No violations at this time.
0674580927 2019-04-23 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids.
0692230629 2013-05-03 Enhanced Recovery Project No Violations Inspected the injection pressure, annulus pressure. Good identification. Access road has been graded.
0748662854 2010-03-08 Enhanced Recovery Project No Violations Good identification. No problems observed during inspection.
0770759449 2008-06-12 Enhanced Recovery Project No Violations No violations at this time.
0792001781 2015-06-15 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well.
0799201408 2008-07-17 Enhanced Recovery Project No Violations Good Identification. No violations at this time.
0832846783 2008-03-25 Enhanced Recovery Project No Violations No violations were observed. The new pressure regulator is working well.
0848654995 2016-10-06 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pumps, injection pressure and annulus pressure. Witnessed Pillar brine truck unloading produced water on the unloading pad.
0877937651 2004-08-03 Salt Water Injection Well No Violations No violations
0918110447 2004-01-28 Salt Water Injection Well No Violations
0932031664 2015-10-13 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure, and annulus pressure. Identification posted at the well.
0932108988 2012-12-28 Enhanced Recovery Project No Violations Inspected enhanced recovery well injection tubing pressure and annulus pressure. Good identification at well head. Accompanied by Morgan Button MRI 2.
1006099073 2013-10-21 Enhanced Recovery Project No Violations Inspected the injection wells in this ERP field with Jon Scott. The sign and wellhead for this well are in good shape. No leaks were detected at this time.
1016550364 2008-01-23 Enhanced Recovery Project No Violations Pressure regulators made by Jordan Valves have been installed and are working great. The valves have a max. back pressure of 400psi, and a max. working pressure of 600psi. They are being set slightly below max. injection pressures.
1051379883 2004-10-28 Salt Water Injection Well No Violations Within limits
1074628281 2009-05-12 Enhanced Recovery Project No Violations Good id. No violations were observed at time of inspection.
1121160979 2018-03-19 Salt Water Injection Well No Violations I was on location today to check the pressures of this salt water injection well. The annulus pressure was 3 psi, the injection tubing pressure was 10 psi. No violations were noted during my inspection.
1146781437 2017-03-17 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well. The containment dike is free of fluids.
1241618309 2013-07-15 Enhanced Recovery Project No Violations Bimonthly UIC monitoring of Greasy Ridge ERP injection wells with Jon Scott. Wellhead and well identification sign are in good shape.
1248471855 2018-05-24 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pumps, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. Brine was observed dripping from the inline filter housing outlet side. 1 inch nipple. I marked the drip with marking tape and then showed the well tender Jeff the drip. Jeff shut in the injection line and made repairs to the filter housing to stop the drip. The soil and gravel below the drip was stained in an area approximately 6 inches in diameter.
1272997865 2018-10-22 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids.
1309063166 2006-08-15 Enhanced Recovery Project No Violations Within limits
1341788934 2004-05-20 Salt Water Injection Well No Violations No problems observed.
1415989828 2014-11-14 Enhanced Recovery Project No Violations Replace top joint of 2 3/8 injection tubing. Tubing was cut off 4 above the slips. A spear was inserted in the tubing. The packer was released and the tubing was pulled to the first collar. The top joint was 8 feet. A new 6 foot joint was installed and the packer was reset at 541 Filled annulus with fresh water and inhibitor. Tested annulus at 380 psi for 15 minutes with no loss. A new master valve was installed on the injection tubing.
1436325509 2012-10-03 Enhanced Recovery Project No Violations Inspected injection pressure and annulus pressure. Good identification on wellhead.
1440516718 2014-02-13 Enhanced Recovery Project No Violations Inspected containment dike, tanks, Pump house, injection pressure and annulus pressure. Good identification at well.
1460641605 2016-04-11 Enhanced Recovery Project No Violations Compliance Notice # 290034226 follow up inspection. Contaminated soil has been scraped up into a pile and has not been removed from the location.
1461153032 2016-04-19 Enhanced Recovery Project No Violations Compliance notice #290034226 follow up inspection. Soil was field tested with Quantabs. Chloride level was 392 ppm Cl. Well tender Bo Pinkerman was instructed to remove the contaminated soil and dispose at an EPA approved landfill.
1463171345 2016-05-13 Enhanced Recovery Project No Violations Compliance Notice # 290034226 follow up inspection. The contaminated soil was not removed. I went to the ERP office and talked to Bo Pinkerman and Mike Carr. They mobilized equipment and have started to remove the contaminated soil from the well site. The contaminated soil is being stockpiled in the Payne common tank battery. The soil will be hauled to a landfill along with material from the Payne tank dike.
1480264938 2013-03-08 Enhanced Recovery Project No Violations Performed inspection with Jon Scott and Scott Means, US Forest Service. Well identification sign in good shape. Wellhead and associated surface injection tubing was wrapped in silver colored insulation. Tank battery GPS is where the 4- 210 barrel storage tanks of brine water are located just before the brine water is injected into the producing formation, the Cow Run.
1496671766 2017-06-05 Salt Water Injection Well No Violations Salt water injection well inspection. The injection pressure was 100 PSI, the annulus pressure was 85 PSI. No violations noted.
1503165837 2015-04-06 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Walked injection line to well. Identification posted at the well. Jonathan Ross was in the process of adjusting the pressure regulator on this well.
1517621420 2016-06-20 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure.
1532613149 2018-07-23 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike is free of fluids. Identification posted.
1579893331 2020-1-22 0:00: ER No Violations 1.00
1594248339 2003-05-15 Enhanced Recovery Project No Violations Injection pressure is below the maximum. Well is in compliance.
1649152849 2016-01-29 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well.
1671427912 2016-11-08 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, unloading pad, injection pumps, injection pressure and annulus pressure. Identification posted at the well. The containment dike is free of fluids.
1685642144 2012-04-05 Enhanced Recovery Project No Violations No violations at the time of inspection.
1718708937 2010-06-07 Enhanced Recovery Project No Violations Well id for Exco-North Coast, Needs to have Enervest information and contact phone numbers. I have talked to Jim Ross (Enervest contractor) about this needing to be changed as soon as possible.
1724911707 2012-10-03 Enhanced Recovery Project No Violations Inspected wells with Jon Scott. Measured Injection and Annulus pressure for wells in this field. Well ID was good.
1738996778 2016-08-16 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well.
1755279829 2020-3-26 0:00: ER No Violations 1.50
1758392649 2004-03-04 Salt Water Injection Well No Violations Tested within range
17600636 2007-9-25 0:00: ER No Violations
1773765151 2008-09-18 Enhanced Recovery Project No Violations Good id. No violations at this time.
1779843519 2005-09-14 Enhanced Recovery Project No Violations OK.
1803795005 2019-7-9 0:00:0 ER No Violations 1.00
1902635022 2014-06-12 Salt Water Injection Well No Violations No noted violations.
191133654 2007-4-5 0:00:0 ER No Violations
1934747974 2016-06-06 Enhanced Recovery Project No Violations Compliance notice #290034226 follow up inspection. The contaminated soil has been removed from the location. The field has been plowed and seeded for agricultural use. Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The injection pump is currently being rebuilt onsite. The containment dike is free of fluids.
1982536398 2007-01-25 Enhanced Recovery Project No Violations mini test was good
2003296206 2020-1-30 0:00: ER No Violations 2.00
2014498018 2006-01-23 Enhanced Recovery Project No Violations Pressures below maximum allowable; pressure on the annulus.
2023224097 2009-02-25 Enhanced Recovery Project No Violations Good id. No violations observed during inspection.
2051524777 2013-09-05 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the wellhead.
2133394480 2005-02-08 Salt Water Injection Well No Violations Ok.
254565447 2013-3-8 0:00:0 ER No Violations 2.00
371584829 2016-3-29 0:00: ER No Violations 1.50
431629916 2015-6-23 0:00: SW No Violations 0.50
435999986 2011-4-1 0:00:0 ER No Violations
442412125 2011-8-2 0:00:0 ER No Violations
448978140 2005-11-10 0:00 ER No Violations
467193700 2009-11-17 0:00 ER No Violations
472845371 2014-8-18 0:00: ER No Violations 1.50
598484711 2013-12-11 0:00 SC No Violations 2.00
656499585 2010-12-20 0:00 ER No Violations
669142259 2007-5-31 0:00: ER No Violations
688019454 2019-10-15 0:00 ER No Violations 0.40
692230629 2013-5-3 0:00:0 ER No Violations 0.50
799201408 2008-7-17 0:00: ER No Violations
877937651 2004-8-3 0:00:0 SW No Violations
918110447 2004-1-28 0:00: SW No Violations
UIC1129 1991-6-18 0:00: ER No Violations
UIC1133 1991-6-18 0:00: ER No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0121675792 US-OH-105670 2006-11-27 Failure to conduct or pass mech. integrity test
0121675792 US-OH-105671 2006-11-27 Failure to monitor annulus pressure
0290034226 US-OH-123009 2016-06-15 Pollution/Contamination
0320369643 US-OH-123331 2003-02-19 Exceeding maximum allowable injection pressure
0525261473 US-OH-125740 2003-10-15 Exceeding maximum allowable injection pressure