If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-087-20410 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":38.62,"lon":-82.45,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Lawrence | |
| Municipality: Mason Township | |
| Operator Name: PILLAR ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: MILLER DENNIS R | |
| License Status: Active Injection | |
| License Date: 1992-10-19 | |
| Spud Date: 1987-05-24 | |
| Spud Drilling Contractor: GARD DRILLING | |
| Final Drill Date: 1987-05-25 | |
| Well Total Depth: 818.00 ft | |
| Configuration: Vertical | |
| Latitude: 38.620000 | |
| Longitude: -82.450000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Original Spud | 1987-05-24 | CONVERT 10-24-92 PERMIT EXPIRED. |
| Completed | 1987-05-25 | CONVERT 10-24-92 PERMIT EXPIRED. |
| Reached Total Depth | 1987-05-25 | CONVERT 10-24-92 PERMIT EXPIRED. |
| First Injection | 1987-06-18 | CONVERT 10-24-92 PERMIT EXPIRED. |
| Completion Report Received | 1987-06-25 | CONVERT 10-24-92 PERMIT EXPIRED. |
| CO | 1992-10-19 | 1089 MITCHELL ENERGY CORP GeoDate 10/19/92 |
| Enhanced Recovery | 1992-10-19 | Issued Date 10/19/92 Expired Date 10/19/93 Acres 0001000 Tool Type NT Proposed Formation COW RUN Proposed Depth Proposed Drill Depth |
| Construction Permit Expires | 1993-10-19 | CONVERT 10-24-92 PERMIT EXPIRED. |
| Change of Owner | 1999-10-22 | Operator changed from 1089, MITCHELL ENERGY CORP to 3793, ENERGY SEARCH INC |
| Last Compliance Report | 2000-02-17 | CONVERT 10-24-92 PERMIT EXPIRED. |
| Change of Owner | 2008-02-26 | Operator changed from 3793, ENERGY SEARCH INC to 1388, NORTH COAST ENERGY INC |
| Change of Owner | 2009-12-14 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
| Change of Owner | 2016-02-24 | Operator changed from 7578, ENERVEST OPERATING LLC to 9619, PILLAR ENERGY LLC |
| Record Last Modified | 2017-02-15 | CONVERT 10-24-92 PERMIT EXPIRED. |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2000-02-17 | 725 | 738 | 1 |
| 725 | 738 | 1 | |
| 725 | 738 | 1 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 166 Bbl | 9000 | |||
| 0 | 0 | 0 | FRAC WITH 166 BBLS H2O AND 9000# 20/40 SAND |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1987 | MITCHELL ENERGY CORP | 0.00 | 903.00 | 198 |
| 1988 | MITCHELL ENERGY CORP | 0.00 | 1412.00 | 365 |
| 1989 | MITCHELL ENERGY CORP | 0.00 | 524.00 | 358 |
| 1990 | MITCHELL ENERGY CORP | 12.00 | 423.00 | 365 |
| 1991 | MITCHELL ENERGY CORP | 11.00 | 311.00 | 320 |
| 1992 | MITCHELL ENERGY CORP | 12.00 | 342.00 | 353 |
| 1993 | MITCHELL ENERGY CORP | 7.00 | 289.00 | 208 |
| 1994 | MITCHELL ENERGY CORP | 0.00 | 0.00 | 365 |
| 1995 | MITCHELL ENERGY CORP | 0.00 | 0.00 | 0 |
| 1997 | MITCHELL ENERGY CORP | 0.00 | 0.00 | 0 |
| 1998 | MITCHELL ENERGY CORP | 0.00 | 0.00 | 0 |
| 1999 | ENERGY SEARCH INC | 0.00 | 0.00 | 60 |
| 2000 | ENERGY SEARCH INC | 0.00 | 0.00 | 365 |
| 2008 | EXCO - NORTH COAST ENERGY INC | 0.00 | 0.00 | 366 |
| 2009 | EXCO - NORTH COAST ENERGY INC | 0.00 | 0.00 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1987 | MITCHELL ENERGY CORP | Brine | 10 | 198 |
| 1988 | MITCHELL ENERGY CORP | Brine | 33 | 365 |
| 1989 | MITCHELL ENERGY CORP | Brine | 325 | 358 |
| 1990 | MITCHELL ENERGY CORP | Brine | 470 | 365 |
| 1991 | MITCHELL ENERGY CORP | Brine | 431 | 320 |
| 1992 | MITCHELL ENERGY CORP | Brine | 221 | 353 |
| 1993 | MITCHELL ENERGY CORP | Brine | 81 | 208 |
| 1994 | MITCHELL ENERGY CORP | Brine | 0 | 365 |
| 1995 | MITCHELL ENERGY CORP | Brine | 0 | 0 |
| 1997 | MITCHELL ENERGY CORP | Brine | 0 | 0 |
| 1998 | MITCHELL ENERGY CORP | Brine | ||
| 1999 | MITCHELL ENERGY CORP | Brine | ||
| 2000 | ENERGY SEARCH INC | Brine | 365 | |
| 2008 | EXCO - NORTH COAST ENERGY INC | Brine | 0 | 366 |
| 2009 | EXCO - NORTH COAST ENERGY INC | Brine | 0 | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1000712764 | 2013-3-15 0:00: | ER | No Violations | 0.70 |
| -1016167543 | 2018-4-25 0:00: | ER | No Violations | 3.10 |
| -1078482246 | 2014-7-18 0:00: | ER | No Violations | 0.70 |
| -1118562440 | 2019-7-9 0:00:0 | ER | No Violations | 0.50 |
| -1202685081 | 2017-4-19 0:00: | ER | No Violations | 2.00 |
| -1245295929 | 2006-11-21 0:00 | ER | No Violations | |
| -1313032541 | 2013-1-9 0:00:0 | ER | No Violations | 0.70 |
| -1331494380 | 2015-4-6 0:00:0 | ER | No Violations | 0.50 |
| -1362302051 | 2018-3-19 0:00: | SW | No Violations | 0.40 |
| -1440959127 | 2018-9-4 0:00:0 | ER | No Violations | 0.40 |
| -1502088921 | 2006-8-1 0:00:0 | ER | No Violations | |
| -1523619382 | 2010-12-30 0:00 | ER | No Violations | |
| -1535542121 | 2008-7-23 0:00: | ER | No Violations | |
| -15593207 | 2017-1-18 0:00: | ER | No Violations | 1.00 |
| -1581846439 | 2007-4-4 0:00:0 | ER | No Violations | |
| -1648013685 | 2009-5-12 0:00: | ER | No Violations | |
| -1734666781 | 2008-9-18 0:00: | ER | No Violations | |
| -1777135986 | 2017-2-28 0:00: | ER | No Violations | 2.50 |
| -179618914 | 2014-6-20 0:00: | ER | No Violations | 0.70 |
| -1849623675 | 2019-3-15 0:00: | ER | No Violations | 1.00 |
| -1901399413 | 2019-2-15 0:00: | ER | No Violations | 1.40 |
| -1960557063 | 2018-7-23 0:00: | ER | No Violations | 1.00 |
| -2012421958 | 2019-10-21 0:00 | ER | No Violations | 1.00 |
| -2065134415 | 2013-10-21 0:00 | ER | No Violations | 0.50 |
| -2107206462 | 2004-10-29 0:00 | SW | No Violations | |
| -249465345 | 2011-3-17 0:00: | ER | No Violations | |
| -304476437 | 2015-6-23 0:00: | SW | No Violations | 0.50 |
| -341116399 | 2004-1-28 0:00: | SW | No Violations | |
| -351552605 | 2020-4-1 0:00:0 | ER | No Violations | 1.00 |
| -357364558 | 2019-5-28 0:00: | ER | No Violations | 0.20 |
| -364516667 | 2013-1-9 0:00:0 | ER | No Violations | 0.70 |
| -376998585 | 2019-12-20 0:00 | ER | No Violations | 0.50 |
| -393427911 | 2020-3-26 0:00: | ER | No Violations | 1.00 |
| -423168962 | 2008-1-16 0:00: | ER | No Violations | |
| -424210459 | 2004-3-4 0:00:0 | SW | No Violations | |
| -492337192 | 2003-5-15 0:00: | ER | No Violations | |
| -523250339 | 2019-1-4 0:00:0 | ER | No Violations | 1.00 |
| -605006913 | 2017-6-21 0:00: | SW | No Violations | 0.30 |
| -657703382 | 2008-6-13 0:00: | ER | No Violations | |
| -69027637 | 2009-11-17 0:00 | ER | No Violations | |
| -704578365 | 2007-9-25 0:00: | ER | No Violations | |
| -738505347 | 2004-8-3 0:00:0 | SW | No Violations | |
| -74208502 | 2018-12-10 0:00 | ER | No Violations | 1.00 |
| -780022664 | 2019-9-17 0:00: | ER | No Violations | 1.50 |
| -829520192 | 2016-8-19 0:00: | ER | No Violations | 0.50 |
| -863905718 | 2017-3-17 0:00: | ER | No Violations | 2.50 |
| -895693662 | 2007-1-24 0:00: | ER | No Violations | |
| -900605407 | 2016-6-6 0:00:0 | ER | No Violations | 0.70 |
| -966161482 | 2005-4-28 0:00: | ER | No Violations | |
| -991185206 | 2007-5-31 0:00: | ER | No Violations | |
| 000PL14095 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 001269i824 | 2002-02-27 | Enhanced Recovery Project | No Violations | Follow-up on NOV, In-Compliance. |
| 0015593207 | 2017-01-18 | Enhanced Recovery Project | No Violations | Compliance Notice # 1653905930 follow up inspection. The injection line valve is closed. The injection line is disconnected from the injection tubing. The annulus valve was open during inspection. |
| 0069027637 | 2009-11-17 | Enhanced Recovery Project | No Violations | Good Identification. No violations observed during inspection. |
| 0074208502 | 2018-12-10 | Enhanced Recovery Project | No Violations | Compliance Notice # 1907397723 follow up inspection. The injection line valve at the pump house is closed. The injection line valve at the well site is open. The injection tubing master valve is open. Identification is posted at the well site. The containment dike is free of fluids. The injection line test has not been scheduled. The contaminated soil has not been removed from the site. |
| 0115318651 | 2010-06-07 | Enhanced Recovery Project | No Violations | Well id for Exco-North Coast, Needs to have Enervest information and contact phone numbers. I have talked to Jim Ross (Enervest contractor) about this needing to be changed as soon as possible. |
| 0179618914 | 2014-06-20 | Enhanced Recovery Project | No Violations | Inspected injection pressure, annulus pressure and walked the pipe line right of way. Good identification at the well. |
| 0226082984 | 2001-10-30 | Enhanced Recovery Project | Violations Noted | FOLLOW UP TO NOV # 1269i461 An inspection of the well revealed that the 2 union and the 2 nipple at the well is leaking and allowing brine to flow on to the ground. At this time it is a very small amount , but needs to be taken care of. |
| 0249465345 | 2011-03-17 | Enhanced Recovery Project | No Violations | No violations at this time. |
| 0304476437 | 2015-06-23 | Salt Water Injection Well | No Violations | No noted violations. |
| 0341116399 | 2004-01-28 | Salt Water Injection Well | No Violations | |
| 0364516667 | 2013-01-09 | Enhanced Recovery Project | No Violations | Inspected enhanced recovery well injection tubing pressure and annulus pressure. Good identification at well head. Accompanied by Morgan Button MRI 2. |
| 0423168962 | 2008-01-16 | Enhanced Recovery Project | No Violations | Pressure regulators made by Jordan Valves have been installed and are working great. The valves have a max. back pressure of 400psi, and a max. working pressure of 600psi. They are being set slightly below max. injection pressures. |
| 0424210459 | 2004-03-04 | Salt Water Injection Well | No Violations | Tested within range. |
| 0438726468 | 2018-11-19 | Enhanced Recovery Project | No Violations | Compliance Notice # 1907397723 follow up inspection. The injection line valve in the pump house is closed. The injection line valve at the well head and injection tubing master valve are open. Collected a soil sample from the injection line leak site. ODNR DOGRM Geologist on site. |
| 0492337192 | 2003-05-15 | Enhanced Recovery Project | No Violations | A T and stop valve were installed on the injection tubing. Well is in compliance. |
| 0521013506 | 2003-10-09 | Enhanced Recovery Project | No Violations | No violations at the time of inspection. |
| 0523250339 | 2019-01-04 | Enhanced Recovery Project | No Violations | Compliance Notice # 1907397723 follow up inspection. The injection line valve in the facility pump house is closed. The injection line valve and master valve on the injection tubing are open. Identification is posted. The containment dike is free of fluids. I asked Mike Carr when are they are going to test the injection line. Mike told me he has not been directed to test the injection line. I asked about when the contaminated material is going to be removed and was not given an answer. |
| 0544424947 | 2004-05-20 | Salt Water Injection Well | No Violations | No problems observed |
| 0605006913 | 2017-06-21 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The annulus pressure was 72 PSI, the tubing pressure was 102 psi. Legible identification was posted. No violations were noted. |
| 0605521572 | 2009-08-17 | Enhanced Recovery Project | No Violations | Good identification. No violations observed during inspection. |
| 0631924524 | 2016-01-22 | Enhanced Recovery Project | No Violations | Inspected the injection pressure and annulus pressure. Identification posted at the well. Annulus valve was frozen shut. |
| 0652181016 | 2008-03-25 | Enhanced Recovery Project | No Violations | No violations were observed. The new pressure regulator is working well. |
| 0657703382 | 2008-06-13 | Enhanced Recovery Project | No Violations | No violations at this time. |
| 0704578365 | 2007-09-25 | Enhanced Recovery Project | No Violations | No violations at this time. |
| 0738505347 | 2004-08-03 | Salt Water Injection Well | No Violations | No violation |
| 0771274825 | 2015-02-02 | Enhanced Recovery Project | No Violations | Inspected the injection pressure and annulus pressure. Good identification at well site. Annulus valve was frozen. Unable to record annulus pressure. |
| 0789652238 | 2005-09-14 | Enhanced Recovery Project | No Violations | OK. |
| 0829520192 | 2016-08-19 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well. |
| 0863905718 | 2017-03-17 | Enhanced Recovery Project | No Violations | Compliance Notice # 1653905930 follow up inspection. The injection tubing has been broken off at the wellhead slips. The injection tubing is open. I talked to Mike Carr about the need to get this well back in compliance. Mike told me that a service rig has been scheduled to replace the top joint of injection tubing. I told Mike that the UIC Inspector must witness the operations and that a mechanical integrity test must be done prior to resuming injection operations. |
| 0884819001 | 2011-08-02 | Enhanced Recovery Project | No Violations | Good identification. Injection line was shut off due to a line leak at the pump house. |
| 0895693662 | 2007-01-24 | Enhanced Recovery Project | No Violations | No Problems at this time. |
| 0900605407 | 2016-06-06 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The injection pump is currently being rebuilt onsite. The containment dike is free of fluids. |
| 0922790779 | 2016-03-28 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification has not been changed from Enervest to Pillar Energy. |
| 0929818886 | 2012-04-05 | Enhanced Recovery Project | No Violations | Good Identification. |
| 0930591575 | 2013-01-07 | Surface Facility Construction | No Violations | Concrete dike pad has been poured. Concrete block and mortar is on site. Extended concrete apron to unloading pad. |
| 0931948985 | 2013-07-15 | Enhanced Recovery Project | No Violations | Inspected injection pressure, annulus pressure, Containment dike, tanks, pump, and unloading pad. Good identification. A new flow meter has been installed at the well head. Flow meter records in gallons. Master valve on the injection tubing is closed. |
| 0966161482 | 2005-04-28 | Enhanced Recovery Project | No Violations | Passed |
| 0991185206 | 2007-05-31 | Enhanced Recovery Project | No Violations | Injection pressure is high 222psi. Jim Ross is correcting the high pressure. No other violations at this time. |
| 1000712764 | 2013-03-15 | Enhanced Recovery Project | No Violations | Inspected injection pressure and annulus pressure. Good identification at wellhead. |
| 1008621614 | 2012-10-03 | Enhanced Recovery Project | No Violations | Inspected wells with Jon Scott. Measured Injection and Annulus pressure for wells in this field. Well ID was good. Noticed a bald area 15-feet from the well head where cattle had been walking trying to force salt water out of the soil. During our field meeting with Jim Ross he indicated that there was a leak and they fixed it. Jim will add amendments to the soil over this spot to induce plant growth while there is still a growing season this year. |
| 1016167543 | 2018-04-25 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. |
| 1078482246 | 2014-07-18 | Enhanced Recovery Project | No Violations | Inspected the annulus pressure, injection pressure, containment dike, tanks, and unloading pad. Good identification at the well. |
| 1099531458 | 2019-04-11 | Enhanced Recovery Project | No Violations | Compliance Notice # 1907397723 follow up inspection. The injection tubing valve is open. The injection line valve at the well site is open. The injection line valve at the pump house is closed. |
| 1146703729 | 2003-02-06 | Enhanced Recovery Project | Violations Noted | Bad valve. Notified operator. |
| 115318651 | 2010-6-7 0:00:0 | ER | No Violations | 1.00 |
| 1177067757 | 2016-12-08 | Enhanced Recovery Project | No Violations | Compliance Notice # 1653905930 follow up inspection. The 2 inch valve on the injection line is closed. The injection line is connected to the injection tubing. The hole in the tubing is at the top of the wellhead slips. The injection tubing pressure is zero. The annulus pressure is 18 psi. |
| 1202685081 | 2017-04-19 | Enhanced Recovery Project | No Violations | Compliance Notice # 1653905930 follow up inspection. The injection tubing is broken off at the wellhead slip ring. A screw in plug has been installed in the injection tubing. The injection line valve is closed. |
| 1242629973 | 2014-11-20 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Good identification at well site. |
| 1245295929 | 2006-11-21 | Enhanced Recovery Project | No Violations | No problems |
| 1245663328 | 2012-10-03 | Enhanced Recovery Project | No Violations | Inspected injection pressure and annulus pressure. Good identification on wellhead. An 10 by 10 area located 15 from the wellhead is devoid of vegetative cover. I talked to Jim Ross and he said that they had a line leak and that area was excavated recently for repairs. I told Jim to establish vegetative cover on the disturbed area. |
| 1248735267 | 2020-8-11 0:00: | ER | No Violations | 0.50 |
| 1269i824 | 2002-2-27 0:00: | ER | No Violations | |
| 1281379184 | 2018-11-09 | Enhanced Recovery Project | No Violations | Compliance Notice # 1907397723 follow up inspection. The injection line leak location has been recently excavated and the injection line valve in the pump house is open. The injection line valve and the injection tubing master valve are open. The injection line has not been tested by the UIC Inspector. The contaminated soil has not been removed from the site. |
| 1301113500 | 2020-7-14 0:00: | ER | No Violations | 0.50 |
| 1306595259 | 2006-01-23 | Enhanced Recovery Project | No Violations | Pressures below maximum allowable; pressure on the annulus. |
| 1313032541 | 2013-01-09 | Enhanced Recovery Project | No Violations | Accompanied Jon Scott to this injection well to perform bimonthly inspection and measure its annulus pressure and actual injection pressure. |
| 1331494380 | 2015-04-06 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Walked injection line to well. Identification posted at the well. |
| 1341709425 | 2005-02-08 | Salt Water Injection Well | No Violations | Ok |
| 1345832713 | 2015-10-05 | Enhanced Recovery Project | No Violations | Inspected the injection pressure and annulus pressure. Identification posted at well. |
| 1362302051 | 2018-03-19 | Salt Water Injection Well | No Violations | I was on location today to check the pressures of this salt water injection well. The annulus pressure was 45 psi, the injection tubing pressure was 110 psi. No violations were noted during my inspection. |
| 1394348072 | 2006-08-15 | Enhanced Recovery Project | No Violations | Within limits |
| 1440959127 | 2018-09-04 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pressure and annulus pressure. Identification is posted at the well. The containment dike is free of fluids. |
| 1482325189 | 2016-12-16 | Enhanced Recovery Project | No Violations | Compliance Notice # 1653905930 follow up inspection. The 2 inch valve on the injection line is closed. The annulus valve is frozen and cannot be opened. |
| 1491313822 | 2017-04-03 | Enhanced Recovery Project | No Violations | Compliance Notice # 1653905930 follow up. A service rig was scheduled for 9:00 am to replace the top joint of injection tubing. No one showed up to the location. At 9:30 am I drove to the ERP facility and talked to Mike Carr. Mike told me that the service rig wrecked on 4-2-17 while leaving another lease. The Inspector received no notification that the scheduled job was canceled. |
| 1493901503 | 2017-04-27 | Enhanced Recovery Project | No Violations | Compliance Notice # 1653905930 follow up inspection. Francis Brothers service rig on site. A tubing spear was inserted into the broken tubing (top joint) and the packer was released. Pulled the tubing up to the next collar and removed the top joint of tubing 32.1 feet. Replaced with a used 31 foot joint of 2.375 inch tubing. Packer was set at 683 feet with 5,000 lbs. tension above string weight. The annulus was filled with 7 barrels fresh water and 1 gallon inhibitor. The annulus was tested at 300 psi with no loss in pressure in 15 minutes. |
| 1502088921 | 2006-08-01 | Enhanced Recovery Project | No Violations | Passed. |
| 1504564129 | 2013-09-05 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the wellhead. Injection line valve is closed. |
| 1523619382 | 2010-12-30 | Enhanced Recovery Project | No Violations | Identification needs refreshed, has previous owner Exco- North Coast and wrong contact phone number. I talked to Jim Ross and he has the blank Ids and is in the process of filling in the information for the entire ERP field. |
| 1535542121 | 2008-07-23 | Enhanced Recovery Project | No Violations | Good Identification. No violations at this time. |
| 1552085527 | 2014-05-02 | Enhanced Recovery Project | No Violations | Inspected the injection pressure, annulus pressure, Unloading pad, containment dike, tanks, and pump house. Good identification at the well. |
| 1555244697 | 2020-5-4 0:00:0 | ER | No Violations | 1.50 |
| 1577642855 | 2018-05-24 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pumps, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. |
| 1581846439 | 2007-04-04 | Enhanced Recovery Project | No Violations | No problems, Jim Ross has grated the lease roads. |
| 1601356114 | 2005-11-10 | Enhanced Recovery Project | No Violations | Ok. |
| 1635734789 | 2019-6-12 0:00: | ER | No Violations | 0.50 |
| 1648013685 | 2009-05-12 | Enhanced Recovery Project | No Violations | Good id. No violations were observed at time of inspection. |
| 1653905930 | 2016-11-08 | Enhanced Recovery Project | Violations Noted | Inspected the injection pressure and annulus pressure. Identification posted at the well. The 2 inch valve on the injection line is closed. The injection tubing has a hole in the top joint above the wellhead slips. Remove all contaminated material from the site and dispose at an EPA Approved landfill. Notify the UIC Inspector prior to working on the injection tubing and packer. The UIC Inspector must witness the movement and or removal of the injection tubing and packer. |
| 1713537702 | 2010-03-09 | Enhanced Recovery Project | No Violations | Good identification. No violations during inspection. |
| 1719189235 | 2014-08-21 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, walked the injection line, checked the injection pressure and annulus pressure. Good identification at wellhead. |
| 1727422620 | 2013-12-11 | Surface Facility Construction | No Violations | Inspected the changes that have been made to the pump house injection line manifolds and the change over to a different injection pump. Inspected the unloading pad, containment dike and tanks. |
| 1734666781 | 2008-09-18 | Enhanced Recovery Project | No Violations | Good id. No violations at this time. |
| 1736124217 | 2009-02-18 | Enhanced Recovery Project | No Violations | Good id. No violations observed during inspection. |
| 1749104450 | 2019-04-23 | Enhanced Recovery Project | No Violations | Compliance Notice # 1907397723 follow up inspection. Inspected the injection pressure, annulus pressure, containment dike, tanks, and unloading pad. Identification posted. Accompanied by UIC Supervisor and UIC Geologist. The injection tubing valve is open, the injection line valve at well site is open, the injection line valve at the pump house is closed. Field tested the line leak site with High Range quantab, results were 6.8 on strip which is 2374 ppm Cl. |
| 1777135986 | 2017-02-28 | Enhanced Recovery Project | No Violations | Compliance Notice # 1653905930 follow up inspection. The injection line is disconnected from the injection tubing. |
| 1831975871 | 2013-05-02 | Enhanced Recovery Project | No Violations | Inspected the injection pressure, annulus pressure, pump house and containment dike. |
| 1849623675 | 2019-03-15 | Enhanced Recovery Project | No Violations | Compliance Notice # 1907397723 follow up inspection. The injection line valve at the well site is open. The injection tubing master valve is open. The injection line valve at the pump house is closed. Identification posted. The injection line test has not been scheduled. The filter housing has been removed from the injection line. The contaminated material has not been removed. |
| 1901399413 | 2019-02-15 | Enhanced Recovery Project | No Violations | Compliance Notice # 1907397723 follow up inspection. Inspected the injection pressure and annulus pressure. The injection line valve at the pump house is shut off. The injection line valve at the well site is open. The injection tubing master valve is open. Identification is posted. The injection line has not been tested. The contaminated soil has not been removed. The inline filter housing body is on the ground. Apiece of the filter housing flange has broken off. |
| 1907397723 | 2018-10-22 | Enhanced Recovery Project | Violations Noted | Inspected the injection pressure and annulus pressure. The injection tubing is on vacuum. While inspecting the surface facility the injection line valve to the well was shut off. Out side the injection facility a scald area 12 feet by 22 feet was observed. A high range Quantab was used in a pool of fluid with in the scald area next to a line marker. The high range Quantab was 8.2 on the strip which is 4621 ppm Cl. The injection line must be repaired or replaced. The injection line must be tested and witnessed by UIC Inspector prior to operation. Submit a plan to the Division of Oil and Gas UIC Section regarding the proposed remediation of the Brine contaminated soil. |
| 1948469991 | 2014-02-13 | Enhanced Recovery Project | No Violations | Bimonthly inspection of ERP field injection wells performed by me and Jon Scott. There are no noticeable leaks in plumbing at wellhead. Identification sign and wellhead in good shape. |
| 1960557063 | 2018-07-23 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike is free of fluids. Identification posted. |
| 1964858209 | 2010-09-13 | Enhanced Recovery Project | No Violations | Possible line leak on access road (large wet area 15 by 8). I talked to Jim Ross and he is going to excavate it up to see if there is a leak. |
| 2048660871 | 2006-03-29 | Enhanced Recovery Project | No Violations | Ok. |
| 2050813454 | 2011-12-09 | Enhanced Recovery Project | No Violations | Accompanied Jon Scott for ERP training. Site clean, not exceeding max injection. |
| 2065134415 | 2013-10-21 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the well head. |
| 2084301582 | 2004-11-08 | Salt Water Injection Well | No Violations | Random pressure check. |
| 2107206462 | 2004-10-29 | Salt Water Injection Well | No Violations | Within limits. |
| 226082984 | 2001-10-30 0:00 | ER | No Violations | |
| 438726468 | 2018-11-19 0:00 | ER | No Violations | 2.00 |
| 521013506 | 2003-10-9 0:00: | ER | No Violations | |
| 544424947 | 2004-5-20 0:00: | SW | No Violations | |
| 605521572 | 2009-8-17 0:00: | ER | No Violations | |
| 622538183 | 2019-11-29 0:00 | ER | No Violations | 0.50 |
| 631924524 | 2016-1-22 0:00: | ER | No Violations | 1.00 |
| 652181016 | 2008-3-25 0:00: | ER | No Violations | |
| 734548338 | 2020-1-22 0:00: | ER | No Violations | 2.00 |
| 771274825 | 2015-2-2 0:00:0 | ER | No Violations | 0.70 |
| 789652238 | 2005-9-14 0:00: | ER | No Violations | |
| 884819001 | 2011-8-2 0:00:0 | ER | No Violations | |
| 922790779 | 2016-3-28 0:00: | ER | No Violations | 1.00 |
| 929818886 | 2012-4-5 0:00:0 | ER | No Violations | |
| 930591575 | 2013-1-7 0:00:0 | SC | No Violations | 2.50 |
| 931948985 | 2013-7-15 0:00: | ER | No Violations | 0.50 |
| PL14095 | PL | No Violations |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 0226082984 | US-OH-122252 | 2001-10-30 | Violation of injection tubing/fitting requirements | |
| 0226082984 | US-OH-122253 | 2001-10-30 | Mechanical failure/contamination | |
| 1146703729 | US-OH-103806 | 2003-02-19 | Violation of injection tubing/fitting requirements | |
| 1653905930 | US-OH-116328 | 2017-05-22 | 9-5-06 | Pollution/Contamination |
| 1907397723 | US-OH-119190 | 2018-10-23 | 9-5-06 | Pollution/Contamination |
For data sources see[9]