If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-087-20670 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":38.42,"lon":-82.58,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Lawrence | |
Municipality: Fayette Township | |
Operator Name: NYTIS EXPLORATION CO LLC | |
Well Pad ID: | |
Farm/Lease Name: LAWRENCE ECONOMIC DEVELOPMENT | |
License Status: Producing | |
License Date: 2009-01-20 | |
Spud Date: 2009-09-08 | |
Spud Drilling Contractor: | |
Final Drill Date: 2009-09-17 | |
Well Total Depth: 3640.00 ft | |
Configuration: Horizontal | |
Latitude: 38.420000 | |
Longitude: -82.580000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-01-20 | Proposed Formations:DEVONIAN SHALE, Issued Date:1/20/2009, Expired Date:1/20/2010 6:00:00 AM, Drilling unit acres:31.14, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-09-17 | |
Construction Permit Expires | 2010-01-20 | |
Completion Report Received | 2010-06-29 | |
Correction to Well | 2015-04-24 | CHANGE IN TARGET INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 3500 Mscf | 0 | RATE: 105 MSCF/MIN |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | NYTIS EXPLORATION CO LLC | 2504.00 | 0.00 | 45 |
2010 | NYTIS EXPLORATION CO LLC | 20416.00 | 0.00 | 365 |
2011 | NYTIS EXPLORATION CO LLC | 14229.00 | 0.00 | 365 |
2012 | NYTIS EXPLORATION CO LLC | 12804.00 | 0.00 | 366 |
2013 | NYTIS EXPLORATION CO LLC | 10801.00 | 0.00 | 365 |
2014 | NYTIS EXPLORATION CO LLC | 5823.00 | 0.00 | 365 |
2016 | NYTIS EXPLORATION CO LLC | 11274.00 | 0.00 | 365 |
2017 | NYTIS EXPLORATION CO LLC | 10350.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | NYTIS EXPLORATION CO LLC | Brine | 0 | 45 |
2010 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2011 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2012 | NYTIS EXPLORATION CO LLC | Brine | 0 | 366 |
2013 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2014 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2016 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
2017 | NYTIS EXPLORATION CO LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1543425010 | 2010-6-14 0:00: | PW | No Violations | 0.70 |
-220839424 | 2009-9-17 0:00: | DD | No Violations | |
-363241772 | 2014-11-18 0:00 | PL | No Violations | 2.00 |
-451777839 | 2009-2-12 0:00: | DD | No Violations | |
-719296807 | 2009-12-17 0:00 | PW | No Violations | |
0220839424 | 2009-09-17 | Drill / Deepen / Reopen | No Violations | Pit is in good condition. Flow line is anchored down. All flanges on flow line have bolts in them. Drilling horizontally at 3672 feet MD. Accompanied by Robert Stonerock MRM South Region Supervisor. |
0240563527 | 2013-04-02 | UrbanProduction Wells | No Violations | Accompanied Morgan Button MRI 2 on inspection of the well. Good identification on the fence. Well is producing. |
0363241772 | 2014-11-18 | Preliminary Restoration | No Violations | Preliminary Restoration requirements met. Tank battery is equipped with two 50 Bbl plastic tanks and two separators. |
0451777839 | 2009-02-12 | Drill / Deepen / Reopen | No Violations | Have set 16 inch conductor at 121 feet inluding 5 feet above ground. A flat piece of steel has been welded to the top of the conductor. Conductor was welded together and then set one piece at a time. Well measures 52 feet 10.5 inches from the railroad track spur. No identification is on the wellhead. |
0719296807 | 2009-12-17 | Production Wells | No Violations | Access road has a gate at the entrance. The gate is locked. The gate has a no trespassing sign and a danger no smoking or open flame sign. The gate does not have a urban id. A mechanical separator and plastic tank is outside of the fence. There are two separators and two tanks, one for LEDCO #1 and one for LEDCO # 5. Plans have been made to fence in the production equipment and place an id on the gate. The well is not fenced in yet. No id at wellhead. Id will be on the fence. Pit location has been filled in. pit site has settled some. is allowing water to pool. Site needs to be graded then seed and mulch applied. |
0734852119 | 2009-09-18 | Drill / Deepen / Reopen | No Violations | Completed drilling. TOH with bit. Preparing to run 4.5 casing with packer system. Will do a four stage frac. |
1235348215 | 2009-10-01 | Production Wells | No Violations | Meet on location with Jeff Price (NYTIS) Jeff wants to install a mechanical separator at GPS N38.42770/W082.58794 This stake is 50 (feet) from each well. The stake is 27 (feet) from a railroad spur. The rail spur is damaged and is not being used at this time. I have requested a letter from LEDCO stating that the railroad spur will not be used. |
1248376391 | 2009-07-23 | Administrative Inspection | No Violations | Talked to Jeff Price (NYTIS) They are working on bids for drilling. Drilling planned for August. I told Jeff to make sure and notify me in advance when pit construction and drill rig is moving on site. |
1258566402 | 2009-11-04 | Preliminary Restoration | No Violations | A gate has been installed on the access road. Separators have been installed for the LEDCO # 2 & 5, Plastic tanks have been installed for brine. The Separators and tanks are to be fenced in with an extension of the LEDCO # 2 fence that is around the well. A separate fence will be installed at the LEDCO # 5 wellhead. The drill pit has been closed. Site has been graded. Soil has settled at pit location. A pile of top soil is on location and is to be used in filling in low area. Well is equipped with tubing. Well is connected to Separator and tank. Well is connected to production line. Well does not have identification yet. LEDCO #2 id is on fence. |
1259866244 | 2009-09-08 | Drill / Deepen / Reopen | No Violations | Update GPS on conductor and drill pit location Pit GPS +/- 15 N38.42770/W082.58820. Have not moved drill rig on location to continue drilling well. |
1474303797 | 2009-09-11 | Drill / Deepen / Reopen | No Violations | Surface cement job. TD 305 . 120 of 16 64lb Conductor. 272 of 26lb 7 casing in a 12 3/8 hole. Pin Point Drilling Rig out of Beckley, WV. 7 ABC extinguishers checked during inspection all had current inspection tags and were full. Flow line to pit was not anchored down. I told Jeff Price (NYTIS Drilling Supervisor) to chain the flow line down in at least two areas. I also told Jeff to completely bolt the flanges on all sections of flow lines. Some flanges only had a bolt in every other hole( they are 10 bolt flanges). Well achieved good circulation of water to surface. After circulation bentionite and flake were circulated 5 sacs of mud mixed. Bentionite circulated to surface. Cement was pumped and cement circulated to surface. |
1543425010 | 2010-06-14 | Production Wells | No Violations | No fencing around the separators and plastic tanks for the #1 and # 5. I called Jeff Price and he told me that they are holding off the fence until after they plug back the #1. I asked for a letter stating a time line for the plug back and the fencing. |
1841141314 | 2009-04-08 | Administrative Inspection | No Violations | Received a call from Jeff Price (NYTIS) He wants to set 7 inch casing through Berea and cement to surface. The 7 inch will be the surface casing. I talked to Steve Oppritza ODNR Permit Geologist. Steve said that setting 7 surface casing bellow the Berea is ok as long as NYTIS understands and accepts the risks of contamination and the liability of such a action. I called Jeff back and informed him of their liability for any contamination. Jeff will discuss this with NYTIS. |
1846878828 | 2010-07-20 | UrbanProduction Wells | No Violations | Fence has been extended around tanks and separators. No identification on gate. A fence has been placed around the well. It consists of 10 foot sections of premade fence (kennel type) that is configured in a square with three strands of barbed wire and a locked gate. The fence is not secured to the ground with posts. The fence is not permanent with out securing it to ground. No identification on well. I called Jeff Price and he will post identification on well and gate. He is going to secure the fence to the ground. |
2012242533 | 2013-04-02 | UrbanProduction Wells | No Violations | Jon Scott took me to this well site and other LEDCO lease wells to inspect good examples of urban township production wells, urban well identification signs, fence construction, etc. I took pictures of signs and fence to use as good examples future urban well inspections. This wellhead is in its own fenced-in area. Tank battery used to collect brine before entering the gas production line is in the enclosure around the LEDCO #1 (API # 3408720645) |
240563527 | 2013-4-2 0:00:0 | UP | No Violations | 0.50 |
734852119 | 2009-9-18 0:00: | DD | No Violations |
For data sources see[8]