X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-089-21817

Well Details

Well ID: 34-089-21817
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: Fallsbury Township
Operator Name: MORAN RONALD F
Well Pad ID:
Farm/Lease Name: PROFFIT A
License Status: Producing
License Date: 1981-04-20
Spud Date: 1981-07-11
Spud Drilling Contractor:
Final Drill Date: 1981-07-21
Well Total Depth: 3047.00 ft
Configuration: Vertical
Latitude: 40.210000
Longitude: -82.200000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1981-04-20 565 MORAN RONALD F GeoDate 4/20/81
Original Spud 1981-07-11 RE-TYPED 3-22-82, RO 4-23-81 START & STOP DATE FOUND IN NSR.
Completed 1981-07-21 RE-TYPED 3-22-82, RO 4-23-81 START & STOP DATE FOUND IN NSR.
Reached Total Depth 1981-07-21 RE-TYPED 3-22-82, RO 4-23-81 START & STOP DATE FOUND IN NSR.
Record Last Modified 2013-10-03 RE-TYPED 3-22-82, RO 4-23-81 START & STOP DATE FOUND IN NSR.

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2100 Bbl 23000 STIMS AND CASINGS FROM BACK OF CARD.

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 LEADER EQUITIES INC 0.00 481.00 0
1985 LEADER EQUITIES INC 0.00 548.00 305
1986 LEADER EQUITIES INC 0.00 389.00 365
1987 LEADER EQUITIES INC 0.00 463.00 305
1988 LEADER EQUITIES INC 0.00 541.00 365
1990 CGAS EXPLORATION 0.00 474.00 365
1991 MORAN RONALD F 0.00 482.00 365
1993 BELDEN & BLAKE CORPORATION 0.00 378.00 358
1994 BELDEN & BLAKE CORPORATION 0.00 304.00 331
1995 MORAN RONALD F 0.00 321.00 0
1996 BELDEN & BLAKE CORPORATION 0.00 284.00 335
1997 BELDEN & BLAKE CORPORATION 0.00 364.00 344
1998 BELDEN & BLAKE CORPORATION 0.00 327.00 319
1999 BELDEN & BLAKE CORPORATION 0.00 202.00 196
2000 BELDEN & BLAKE CORPORATION 0.00 0.00 39
2001 BELDEN & BLAKE CORPORATION 0.00 489.00 337
2002 BELDEN & BLAKE CORPORATION 0.00 154.00 175
2003 MORAN RONALD F 0.00 264.00 365
2004 MORAN RONALD F 0.00 281.00 365
2005 MORAN RONALD F 0.00 203.00 365
2012 MORAN RONALD F 0.00 181.00 366
2013 MORAN RONALD F 0.00 106.00 365
2014 MORAN RONALD F 0.00 250.00 365
2015 MORAN RONALD F 0.00 217.00 365
2016 MORAN RONALD F 0.00 189.00 366
2017 MORAN RONALD F 0.00 216.00 365
2018 MORAN RONALD F 0.00 210.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 LEADER EQUITIES INC Brine 0 0
1985 LEADER EQUITIES INC Brine 0 305
1986 LEADER EQUITIES INC Brine 0 365
1987 LEADER EQUITIES INC Brine 0 305
1988 LEADER EQUITIES INC Brine 0 365
1990 CGAS EXPLORATION Brine 0 365
1991 MORAN RONALD F Brine 40 365
1993 BELDEN & BLAKE CORPORATION Brine 134 358
1994 BELDEN & BLAKE CORPORATION Brine 34 331
1995 MORAN RONALD F Brine 0 0
1996 BELDEN & BLAKE CORPORATION Brine 0 335
1997 BELDEN & BLAKE CORPORATION Brine 0 344
1998 BELDEN & BLAKE CORPORATION Brine 15 319
1999 BELDEN & BLAKE CORPORATION Brine 39 196
2000 BELDEN & BLAKE CORPORATION Brine 3 39
2001 BELDEN & BLAKE CORPORATION Brine 11 337
2002 BELDEN & BLAKE CORPORATION Brine 0 175
2003 MORAN RONALD F Brine 75 365
2004 MORAN RONALD F Brine 80 365
2005 MORAN RONALD F Brine 45 365
2012 MORAN RONALD F Brine 40 366
2013 MORAN RONALD F Brine 30 365
2014 MORAN RONALD F Brine 75 365
2015 MORAN RONALD F Brine 65 365
2016 MORAN RONALD F Brine 350 366
2017 MORAN RONALD F Brine 0 365
2018 MORAN RONALD F Brine 0 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1625443195 2016-8-8 0:00:0 PW No Violations
-1714394508 2016-8-1 0:00:0 PW No Violations
-292453386 2016-8-17 0:00: PW No Violations
-791187708 2020-6-17 0:00: PW No Violations 0.50
0292453386 2016-08-17 Production Wells No Violations This inspection was conducted as a compliance notice follow-up. There were no personnel on location. The contaminated soil has been removed. Booms and diapers were still in place. A sheen was observed on the water near the booms. A large amount of rainfall has ocurred this morning and yesterday. The company has made good progress on the clean-up so far. Time of inspection: 1:00 PM. Weather: 72*F, Overcast
1482598292 2016-09-20 Production Wells No Violations Inspect location as a compliance notice follow-up. The clean up has been completed. Seed and straw has been applied. New vegetative growth was observed. No oil observed in the stream. All booms and diapers were removed. Photos were taken of the location. Violation resolved.
1625443195 2016-08-08 Production Wells No Violations This inspection was conducted as a compliance notice follow-up. There was no personnel on location. The contaminated soil was stockpiled on location and covered with plastic sheeting. Booms and diapers were still collecting oil in the stream. The clean-up was not finished. The 100 barrel tanks have been reset and a new earthen dike has been built around them. Time of inspection: 10:50 AM.
1714394508 2016-08-01 Production Wells Violations Noted At 4:27 PM I received a phone call from Rhonda Garber, daughter of well owner Ron Moran, regarding a flow line leak that had allowed oil to enter a small stream. I arrived to the location at 5:15 PM and assessed the stream. I contacted Emergency Operations Regional Manager Trisha Cartmell and advised her of my findings. An earthen dam had been constructed here (N 40.21249 W -82.20331) by the time I arrived. Jim King, a local registered brine hauler, was sucking up oil from the earthen dam. Mr. Kings son, Jimmy King, was pulling back vegetation/debris from the stream with a mini hoe. The stream had very little water flow to it. The leak developed from an 1.5 flow line here (N 40.21282 W -82.20468). The well was shut-in and a patch was placed on the line. The leak ocurred in a low lying wet area. Emergency Operations Coordinator Vikki Bunting arrived that evening. The majority of free product was sucked up that evening. Work stopped at midnight and would continue the next day.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1714394508 US-OH-116998 2016-10-17 9-1-07 Well operation causing pollution and contamination

For data sources see[8]

References