If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-21817 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.21,"lon":-82.2,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Fallsbury Township | |
Operator Name: MORAN RONALD F | |
Well Pad ID: | |
Farm/Lease Name: PROFFIT A | |
License Status: Producing | |
License Date: 1981-04-20 | |
Spud Date: 1981-07-11 | |
Spud Drilling Contractor: | |
Final Drill Date: 1981-07-21 | |
Well Total Depth: 3047.00 ft | |
Configuration: Vertical | |
Latitude: 40.210000 | |
Longitude: -82.200000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-04-20 | 565 MORAN RONALD F GeoDate 4/20/81 |
Original Spud | 1981-07-11 | RE-TYPED 3-22-82, RO 4-23-81 START & STOP DATE FOUND IN NSR. |
Completed | 1981-07-21 | RE-TYPED 3-22-82, RO 4-23-81 START & STOP DATE FOUND IN NSR. |
Reached Total Depth | 1981-07-21 | RE-TYPED 3-22-82, RO 4-23-81 START & STOP DATE FOUND IN NSR. |
Record Last Modified | 2013-10-03 | RE-TYPED 3-22-82, RO 4-23-81 START & STOP DATE FOUND IN NSR. |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2100 Bbl | 23000 | STIMS AND CASINGS FROM BACK OF CARD. |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | LEADER EQUITIES INC | 0.00 | 481.00 | 0 |
1985 | LEADER EQUITIES INC | 0.00 | 548.00 | 305 |
1986 | LEADER EQUITIES INC | 0.00 | 389.00 | 365 |
1987 | LEADER EQUITIES INC | 0.00 | 463.00 | 305 |
1988 | LEADER EQUITIES INC | 0.00 | 541.00 | 365 |
1990 | CGAS EXPLORATION | 0.00 | 474.00 | 365 |
1991 | MORAN RONALD F | 0.00 | 482.00 | 365 |
1993 | BELDEN & BLAKE CORPORATION | 0.00 | 378.00 | 358 |
1994 | BELDEN & BLAKE CORPORATION | 0.00 | 304.00 | 331 |
1995 | MORAN RONALD F | 0.00 | 321.00 | 0 |
1996 | BELDEN & BLAKE CORPORATION | 0.00 | 284.00 | 335 |
1997 | BELDEN & BLAKE CORPORATION | 0.00 | 364.00 | 344 |
1998 | BELDEN & BLAKE CORPORATION | 0.00 | 327.00 | 319 |
1999 | BELDEN & BLAKE CORPORATION | 0.00 | 202.00 | 196 |
2000 | BELDEN & BLAKE CORPORATION | 0.00 | 0.00 | 39 |
2001 | BELDEN & BLAKE CORPORATION | 0.00 | 489.00 | 337 |
2002 | BELDEN & BLAKE CORPORATION | 0.00 | 154.00 | 175 |
2003 | MORAN RONALD F | 0.00 | 264.00 | 365 |
2004 | MORAN RONALD F | 0.00 | 281.00 | 365 |
2005 | MORAN RONALD F | 0.00 | 203.00 | 365 |
2012 | MORAN RONALD F | 0.00 | 181.00 | 366 |
2013 | MORAN RONALD F | 0.00 | 106.00 | 365 |
2014 | MORAN RONALD F | 0.00 | 250.00 | 365 |
2015 | MORAN RONALD F | 0.00 | 217.00 | 365 |
2016 | MORAN RONALD F | 0.00 | 189.00 | 366 |
2017 | MORAN RONALD F | 0.00 | 216.00 | 365 |
2018 | MORAN RONALD F | 0.00 | 210.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | LEADER EQUITIES INC | Brine | 0 | 0 |
1985 | LEADER EQUITIES INC | Brine | 0 | 305 |
1986 | LEADER EQUITIES INC | Brine | 0 | 365 |
1987 | LEADER EQUITIES INC | Brine | 0 | 305 |
1988 | LEADER EQUITIES INC | Brine | 0 | 365 |
1990 | CGAS EXPLORATION | Brine | 0 | 365 |
1991 | MORAN RONALD F | Brine | 40 | 365 |
1993 | BELDEN & BLAKE CORPORATION | Brine | 134 | 358 |
1994 | BELDEN & BLAKE CORPORATION | Brine | 34 | 331 |
1995 | MORAN RONALD F | Brine | 0 | 0 |
1996 | BELDEN & BLAKE CORPORATION | Brine | 0 | 335 |
1997 | BELDEN & BLAKE CORPORATION | Brine | 0 | 344 |
1998 | BELDEN & BLAKE CORPORATION | Brine | 15 | 319 |
1999 | BELDEN & BLAKE CORPORATION | Brine | 39 | 196 |
2000 | BELDEN & BLAKE CORPORATION | Brine | 3 | 39 |
2001 | BELDEN & BLAKE CORPORATION | Brine | 11 | 337 |
2002 | BELDEN & BLAKE CORPORATION | Brine | 0 | 175 |
2003 | MORAN RONALD F | Brine | 75 | 365 |
2004 | MORAN RONALD F | Brine | 80 | 365 |
2005 | MORAN RONALD F | Brine | 45 | 365 |
2012 | MORAN RONALD F | Brine | 40 | 366 |
2013 | MORAN RONALD F | Brine | 30 | 365 |
2014 | MORAN RONALD F | Brine | 75 | 365 |
2015 | MORAN RONALD F | Brine | 65 | 365 |
2016 | MORAN RONALD F | Brine | 350 | 366 |
2017 | MORAN RONALD F | Brine | 0 | 365 |
2018 | MORAN RONALD F | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1625443195 | 2016-8-8 0:00:0 | PW | No Violations | |
-1714394508 | 2016-8-1 0:00:0 | PW | No Violations | |
-292453386 | 2016-8-17 0:00: | PW | No Violations | |
-791187708 | 2020-6-17 0:00: | PW | No Violations | 0.50 |
0292453386 | 2016-08-17 | Production Wells | No Violations | This inspection was conducted as a compliance notice follow-up. There were no personnel on location. The contaminated soil has been removed. Booms and diapers were still in place. A sheen was observed on the water near the booms. A large amount of rainfall has ocurred this morning and yesterday. The company has made good progress on the clean-up so far. Time of inspection: 1:00 PM. Weather: 72*F, Overcast |
1482598292 | 2016-09-20 | Production Wells | No Violations | Inspect location as a compliance notice follow-up. The clean up has been completed. Seed and straw has been applied. New vegetative growth was observed. No oil observed in the stream. All booms and diapers were removed. Photos were taken of the location. Violation resolved. |
1625443195 | 2016-08-08 | Production Wells | No Violations | This inspection was conducted as a compliance notice follow-up. There was no personnel on location. The contaminated soil was stockpiled on location and covered with plastic sheeting. Booms and diapers were still collecting oil in the stream. The clean-up was not finished. The 100 barrel tanks have been reset and a new earthen dike has been built around them. Time of inspection: 10:50 AM. |
1714394508 | 2016-08-01 | Production Wells | Violations Noted | At 4:27 PM I received a phone call from Rhonda Garber, daughter of well owner Ron Moran, regarding a flow line leak that had allowed oil to enter a small stream. I arrived to the location at 5:15 PM and assessed the stream. I contacted Emergency Operations Regional Manager Trisha Cartmell and advised her of my findings. An earthen dam had been constructed here (N 40.21249 W -82.20331) by the time I arrived. Jim King, a local registered brine hauler, was sucking up oil from the earthen dam. Mr. Kings son, Jimmy King, was pulling back vegetation/debris from the stream with a mini hoe. The stream had very little water flow to it. The leak developed from an 1.5 flow line here (N 40.21282 W -82.20468). The well was shut-in and a patch was placed on the line. The leak ocurred in a low lying wet area. Emergency Operations Coordinator Vikki Bunting arrived that evening. The majority of free product was sucked up that evening. Work stopped at midnight and would continue the next day. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1714394508 | US-OH-116998 | 2016-10-17 | 9-1-07 | Well operation causing pollution and contamination |
For data sources see[8]