If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-21965 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.15,"lon":-82.21,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Perry Township | |
Operator Name: PORTERFIELD NELSON BUD | |
Well Pad ID: | |
Farm/Lease Name: STEVENS BERNARD & JANE | |
License Status: Final Restoration | |
License Date: 2000-11-17 | |
Spud Date: 1985-01-26 | |
Spud Drilling Contractor: ROSS WELL SERVICE | |
Final Drill Date: 1985-01-30 | |
Well Total Depth: 609.00 ft | |
Configuration: Vertical | |
Latitude: 40.150000 | |
Longitude: -82.210000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1985-01-04 | 677 WALLICK PETROLEUM CO GeoDate 1/4/85 |
Enhanced Recovery | 1985-01-04 | Issued Date 1/4/85 Expired Date 7/3/85 Acres 0010000 Tool Type CT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1985-01-26 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
Completed | 1985-01-30 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
Reached Total Depth | 1985-01-30 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
First Injection | 1985-04-11 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
Completion Report Received | 1985-04-16 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
Annulus Pressure Monitoring Approved | 1990-02-20 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
CO | 1992-05-08 | 2085 PORTERFIELD NELSON BUD GeoDate 1/4/85 |
Last Compliance Report | 2000-03-10 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
APP | 2000-11-17 | Proposed Formations:BEREA, Issued Date:11/17/2000, Expired Date:11/17/2001 6:00:00 AM, Drilling unit acres:310, Proposed Well Type:EOR, Proposed Well Class:ERP |
Plugged/Abandoned | 2001-08-26 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
Construction Permit Expires | 2001-11-17 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
Record Last Modified | 2017-02-15 | DRILLED BY CARL SHOEMAKER. PLUGGED??? LAST INJECTION OCCURRED IN 1990. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-03-10 | 593 | 606 | 0 |
593 | 606 | 0 | |
593 | 606 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
GEL | 0 | 140 Lbs | 0 | |||
0 | 0 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | COLUMBIA GAS TRANSMISSION LLC | 0.00 | 191.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | COLUMBIA GAS TRANSMISSION LLC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-904446045 | 2020-2-25 0:00: | FR | No Violations | 0.30 |
0000UIC478 | 1988-01-21 | Enhanced Recovery Project | No Violations | 1509.21 |
000UIC1330 | 1992-12-03 | Enhanced Recovery Project | No Violations | 1501: 9-3-07 (E) (F) QUARTERLY REPORTS |
000UIC1434 | 1993-08-12 | Enhanced Recovery Project | Violations Noted | 1501: 9-5-10 (J) INCAP. OF PRODUCTION |
000UIC1435 | 1993-08-12 | Enhanced Recovery Project | No Violations | 1509.03 CONDITION OF PERMIT |
UIC1330 | 1992-12-3 0:00: | ER | No Violations | |
UIC1434 | 1993-8-12 0:00: | ER | No Violations | |
UIC1435 | 1993-8-12 0:00: | ER | No Violations | |
UIC478 | 1988-1-21 0:00: | ER | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
000UIC1434 | US-OH-131703 | Failure to plug |
For data sources see[9]