If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-25754 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.13,"lon":-82.41,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Newton Township | |
Operator Name: WHEELER MICHAEL D | |
Well Pad ID: | |
Farm/Lease Name: MCKINNEY ED | |
License Status: Producing | |
License Date: 2002-11-12 | |
Spud Date: 2002-12-18 | |
Spud Drilling Contractor: SHOEMAKER DRLG | |
Final Drill Date: 2003-03-13 | |
Well Total Depth: 605.00 ft | |
Configuration: Vertical | |
Latitude: 40.130000 | |
Longitude: -82.410000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-11-12 | 5476 WHEELER MICHAEL D Proposed Formation BEREA Issued Date 11/12/2002 Expired Date 11/12/2003 6:00:00 AM |
Inspector Comments Cement Job | 2002-12-18 | Inspector in Bellefontain Office for a meeting.Cement Ticket Notes Inspector Reporting WHITE KEITH |
Original Spud | 2002-12-18 | RBDMS Rec |
Completed | 2003-03-13 | RBDMS Rec |
Reached Total Depth | 2003-03-13 | RBDMS Rec |
Completion Report Received | 2003-04-01 | RBDMS Rec |
Construction Permit Expires | 2003-11-12 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
GEL | 0 | 160 Lbs | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | WHEELER MICHAEL D | 0.00 | 77.00 | 365 |
2004 | WHEELER MICHAEL D | 0.00 | 67.00 | 365 |
2005 | WHEELER MICHAEL D | 0.00 | 88.00 | 365 |
2006 | WHEELER MICHAEL D | 0.00 | 73.00 | 365 |
2007 | WHEELER MICHAEL D | 0.00 | 61.00 | 365 |
2008 | WHEELER MICHAEL D | 0.00 | 85.00 | 365 |
2009 | WHEELER MICHAEL D | 0.00 | 80.00 | 365 |
2010 | WHEELER MICHAEL D | 0.00 | 56.00 | 365 |
2011 | WHEELER MICHAEL D | 0.00 | 63.00 | 365 |
2012 | WHEELER MICHAEL D | 0.00 | 72.00 | 366 |
2013 | WHEELER MICHAEL D | 0.00 | 82.00 | 365 |
2014 | WHEELER MICHAEL D | 0.00 | 65.00 | 365 |
2015 | WHEELER MICHAEL D | 0.00 | 70.00 | 365 |
2016 | WHEELER MICHAEL D | 0.00 | 74.00 | 365 |
2017 | WHEELER MICHAEL D | 0.00 | 65.00 | 365 |
2018 | WHEELER MICHAEL D | 0.00 | 66.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | WHEELER MICHAEL D | Brine | 5 | 365 |
2004 | WHEELER MICHAEL D | Brine | 10 | 365 |
2005 | WHEELER MICHAEL D | Brine | 10 | 365 |
2006 | WHEELER MICHAEL D | Brine | 15 | 365 |
2007 | WHEELER MICHAEL D | Brine | 25 | 365 |
2008 | WHEELER MICHAEL D | Brine | 52 | 365 |
2009 | WHEELER MICHAEL D | Brine | 35 | 365 |
2010 | WHEELER MICHAEL D | Brine | 22 | 365 |
2011 | WHEELER MICHAEL D | Brine | 15 | 365 |
2012 | WHEELER MICHAEL D | Brine | 28 | 366 |
2013 | WHEELER MICHAEL D | Brine | 32 | 365 |
2014 | WHEELER MICHAEL D | Brine | 30 | 365 |
2015 | WHEELER MICHAEL D | Brine | 47 | 365 |
2016 | WHEELER MICHAEL D | Brine | 35 | 365 |
2017 | WHEELER MICHAEL D | Brine | 14 | 365 |
2018 | WHEELER MICHAEL D | Brine | 12 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-171213330 | 2018-2-27 0:00: | PW | No Violations | 0.50 |
-327763709 | 2020-6-11 0:00: | PW | No Violations | 0.50 |
-706218542 | 2003-7-3 0:00:0 | PW | No Violations | |
0171213330 | 2018-02-27 | Production Wells | No Violations | My inspection revealed that the well was equipped with a pumping unit and motor. This well produces into a shared tank battery. I observed identification at the well and tank battery. The tank battery consists of (3) 100 barrel tanks and a plastic brine tank. I took GPS readings at the well, tank battery, and lease road entry point. Time of inspection: 10:30 AM. Weather: 40 degrees F, Sunny |
0706218542 | 2003-07-03 | Production Wells | No Violations | Inspection revealed drilling pit closed. No violations noted this date. WEATHER CONDITIONS: Sunny and 80 degrees. |
1046273869 | 2002-02-26 | Drill / Deepen / Reopen | No Violations | Inspection revealed rig rigging up drilling tools. On 02-25-03 cemented 7 casing at 390 with 40 sks of cement. No violations noted this date. WEATHER CONDITIONS: Cloudy, snow cover and 20 degrees. |
1050070684 | 2003-04-11 | Production Wells | No Violations | Rig still on location. Well completed pump jack set. Mike Wheeler on location trying to get well to pump up. Remind Mike to post ID. Plans to drill another well farther back. |
1055957108 | 2003-06-18 | Production Wells | No Violations | New drilled Berea well. Rig still on hole. Pump jack set. No ID. Pit roughed in. |
1127926083 | 2005-09-28 | Preliminary Restoration | No Violations |
For data sources see[8]