X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-089-25759

Well Details

Well ID: 34-089-25759
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: WHEELER MICHAEL D
Well Pad ID:
Farm/Lease Name: MCKINNEY ED
License Status: Producing
License Date: 2019-06-14
Spud Date: 2004-01-10
Spud Drilling Contractor: SHOEMAKER DRLG
Final Drill Date: 2004-03-29
Well Total Depth: 632.00 ft
Configuration: Vertical
Latitude: 40.120000
Longitude: -82.410000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2003-04-14 5476 WHEELER MICHAEL D Proposed Formation BEREA Issued Date 4/14/2003 Expired Date 4/13/2004 6:00:00 AM
Original Spud 2004-01-10 RBDMS Rec
Completed 2004-03-29 RBDMS Rec
Reached Total Depth 2004-03-29 RBDMS Rec
Completion Report Received 2004-09-23 RBDMS Rec
Inspector Comments Cement Job 2004-10-10 INFORMATION FROM RIG LOG AND CEMENT TICKET.Cement Ticket Notes Inspector Reporting WHITE KEITH
APP 2012-01-18 Proposed Formations:BEREA, Issued Date:1/18/2012, Expired Date:1/17/2014 12:00:00 PM, Drilling unit acres:240, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 2014-01-17 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
GEL 0 150 Lbs 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2004 WHEELER MICHAEL D 0.00 10.00 30
2005 WHEELER MICHAEL D 0.00 88.00 365
2006 WHEELER MICHAEL D 0.00 73.00 365
2007 WHEELER MICHAEL D 0.00 61.00 365
2008 WHEELER MICHAEL D 0.00 85.00 365
2009 WHEELER MICHAEL D 0.00 80.00 365
2010 WHEELER MICHAEL D 0.00 56.00 365
2011 WHEELER MICHAEL D 0.00 63.00 365
2012 WHEELER MICHAEL D 0.00 72.00 366
2014 WHEELER MICHAEL D 0.00 65.00 365
2015 WHEELER MICHAEL D 0.00 70.00 365
2016 WHEELER MICHAEL D 0.00 68.00 365
2017 WHEELER MICHAEL D 0.00 65.00 365
2018 WHEELER MICHAEL D 0.00 66.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2004 WHEELER MICHAEL D Brine 0 30
2005 WHEELER MICHAEL D Brine 10 365
2006 WHEELER MICHAEL D Brine 15 365
2007 WHEELER MICHAEL D Brine 25 365
2008 WHEELER MICHAEL D Brine 52 365
2009 WHEELER MICHAEL D Brine 35 365
2010 WHEELER MICHAEL D Brine 22 365
2011 WHEELER MICHAEL D Brine 15 365
2012 WHEELER MICHAEL D Brine 28 366
2014 WHEELER MICHAEL D Brine 30 365
2015 WHEELER MICHAEL D Brine 47 365
2016 WHEELER MICHAEL D Brine 35 365
2017 WHEELER MICHAEL D Brine 14 365
2018 WHEELER MICHAEL D Brine 12 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1395181688 2020-6-11 0:00: PW No Violations 0.50
0803269735 2011-06-20 Preliminary Restoration No Violations Accompanied Brent Bear on inspection.
1055957447 2003-06-18 Drill / Deepen / Reopen No Violations New permit, location made. Rig still on P# 5754.
2067812601 2011-06-20 Preliminary Restoration No Violations A Pre-liminary Restoration inspection conducted with Mr. Andy Thomas revealed compliance with ORC 1509.072.
2079886796 2018-02-27 Production Wells No Violations My inspection revealed that the well was equipped with a pumping unit and motor. This well produces into a shared tank battery. I observed identification at the well and tank battery. The tank battery consists of (3) 100 barrel tanks and a plastic brine tank. I took GPS readings at the well, tank battery, and lease road entry point. Time of inspection: 11:00 AM. Weather: 40 degrees F, Sunny
803269735 2011-6-20 0:00: PL No Violations 0.50

For data sources see[8]

References