If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-25876 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.16,"lon":-82.5,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: McKean Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: SRBA CRAIG | |
License Status: Producing | |
License Date: 2007-09-19 | |
Spud Date: 2007-09-19 | |
Spud Drilling Contractor: KR DRILLING | |
Final Drill Date: 2007-09-21 | |
Well Total Depth: 2361.00 ft | |
Configuration: Vertical | |
Latitude: 40.160000 | |
Longitude: -82.500000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-09-14 | Proposed Formations:CLINTON, Issued Date:9/14/2007, Expired Date:9/13/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2007-09-19 | Proposed Formations:CLINTON, Issued Date:9/19/2007, Expired Date:9/18/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-09-21 | |
Reached Total Depth | 2007-09-21 | |
First Injection | 2007-10-19 | |
Completion Report Received | 2007-11-28 | |
Construction Permit Expires | 2008-09-18 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-02-26 | 2302 | 2314 | 21 |
2302 | 2314 | 21 | |
2302 | 2314 | 21 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 60000 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
2008 | HOPEWELL OIL & GAS DEVELOPMENT | 3913.00 | 0.00 | 365 |
2009 | HOPEWELL OIL & GAS DEVELOPMENT | 6301.00 | 0.00 | 365 |
2010 | HOPEWELL OIL & GAS DEVELOPMENT | 5414.00 | 0.00 | 0 |
2011 | HOPEWELL OIL & GAS DEVELOPMENT | 4490.00 | 0.00 | 0 |
2012 | HOPEWELL OIL & GAS DEVELOPMENT | 4628.00 | 0.00 | 366 |
2013 | HOPEWELL OIL & GAS DEVELOPMENT | 4465.00 | 0.00 | 365 |
2014 | HOPEWELL OIL & GAS DEVELOPMENT | 2445.00 | 0.00 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | 1499.00 | 0.00 | 365 |
2016 | HOPEWELL OIL & GAS DEVELOPMENT | 113.00 | 0.00 | 60 |
2017 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
2018 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | ||
2008 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 345 | 365 |
2009 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 30 | 365 |
2010 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 30 | 0 |
2011 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | |
2012 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 50 | 366 |
2013 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2014 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2016 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 60 |
2017 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
2018 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-248939433 | 2016-3-2 0:00:0 | PW | No Violations | |
0248939433 | 2016-03-02 | Production Wells | No Violations | Inspection conducted as a status check. The well was equipped with a pumping unit and motor. It was not pumping. Identification was observed at the well. The tank battery consists of (1) 100 barrel tank, separator, drip, and meter inside an earthen dike. Identification was posted on the tank. A second set of equipment was observed in the same dike for the Srba #2 and Srba #3. No violations. Time of inspection: 3:00 PM. Weather: 27*F, Partly cloudy |
0692914258 | 2011-08-08 | Preliminary Restoration | No Violations | An inspection revealed that the Preliminary Restoration meets ORC 1509.072. A GPS reading was obtained for the well and tank location. The well was equipped and showed signs of production. The tank battery location consisted of (1) 100bbl tank w/no knockout, (1) separator, (1) drip and (1) meter. A second set of equipment inside the earthen dike for the SRBA #2 and #3. |
1191943077 | 2007-10-03 | Drill / Deepen / Reopen | No Violations | I stopped by location today to pick up cement ticket from surface job. I was unable to access the lease road due to a locked gate and was therefore unable to visit the well location. |
692914258 | 2011-8-8 0:00:0 | PL | No Violations | 0.50 |
For data sources see[9]