If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-26061 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.15,"lon":-82.56,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: McKean Township | |
Operator Name: KNOX ENERGY INC. | |
Well Pad ID: | |
Farm/Lease Name: EVANS TRUST | |
License Status: Producing | |
License Date: 2011-01-05 | |
Spud Date: 2011-06-30 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2011-07-11 | |
Well Total Depth: 4408.00 ft | |
Configuration: Vertical | |
Latitude: 40.150000 | |
Longitude: -82.560000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-01-05 | Proposed Formations:OHIO SHALE THRU KNOX (MAY NOT PRODUCE BEREA), Issued Date:1/5/2011, Expired Date:1/4/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2011-07-11 | |
Completion Report Received | 2011-11-16 | |
Construction Permit Expires | 2013-01-04 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-12-28 | 4176 | 4234 | 59 |
4176 | 4234 | 59 | |
4176 | 4234 | 59 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-09-15 | ACID | 15 | 1500 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | KNOX ENERGY INC. | 0.00 | 0.00 | 0 |
2012 | KNOX ENERGY INC. | 2380.00 | 0.00 | 272 |
2013 | KNOX ENERGY INC. | 2116.00 | 0.00 | 365 |
2014 | KNOX ENERGY INC. | 1674.00 | 0.00 | 365 |
2015 | KNOX ENERGY INC. | 1494.00 | 0.00 | 365 |
2016 | KNOX ENERGY INC. | 1527.00 | 0.00 | 365 |
2017 | KNOX ENERGY INC. | 1418.00 | 0.00 | 365 |
2018 | KNOX ENERGY INC. | 1175.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | KNOX ENERGY INC. | Brine | 0 | 0 |
2012 | KNOX ENERGY INC. | Brine | 0 | 272 |
2013 | KNOX ENERGY INC. | Brine | 0 | 365 |
2014 | KNOX ENERGY INC. | Brine | 0 | 365 |
2015 | KNOX ENERGY INC. | Brine | 0 | 365 |
2016 | KNOX ENERGY INC. | Brine | 0 | 365 |
2017 | KNOX ENERGY INC. | Brine | 0 | 365 |
2018 | KNOX ENERGY INC. | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1930719292 | 2011-8-15 0:00: | PL | No Violations | |
-427480755 | 2020-4-14 0:00: | PW | No Violations | 0.50 |
-548882321 | 2011-7-1 0:00:0 | DD | No Violations | 2.00 |
-969136764 | 2011-7-5 0:00:0 | DD | No Violations | |
0127715203 | 2012-05-14 | Preliminary Restoration | No Violations | An inspection revealed that the Preliminary Restoration meets ORC 1509.072. A GPS reading was obtained for the well, tank and entrance point location. |
0548882321 | 2011-07-01 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing. Good returns were observed and cement stayed at the surface. The drlling contractor will now shut down and test BOP after Holiday weekend. |
0969136764 | 2011-07-05 | Drill / Deepen / Reopen | No Violations | I witnessed the BOP test. |
127715203 | 2012-5-14 0:00: | PL | No Violations | |
1312290211 | 2011-07-05 | Drill / Deepen / Reopen | No Violations | I witnessed the BOP test today. The initial test failed and BOP was re-tested and passed the required test. |
1312666782 | 2011-07-11 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of new 4.5 casing (longstring). |
1930719292 | 2011-08-15 | Preliminary Restoration | No Violations | An inspection revealed that the drilling pits have been abandoned. The remainder of the Pre-liminary Restoration will be checked at a later date. |
2049043375 | 2016-02-22 | Production Wells | No Violations | Inspect well, storage and add the entry coordinates. |
For data sources see[9]