If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-089-26119 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.12,"lon":-82.64,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Licking | |
| Municipality: St. Albans Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: BUSH TRUST | |
| License Status: Producing | |
| License Date: 2012-11-13 | |
| Spud Date: 2012-12-14 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 2012-12-19 | |
| Well Total Depth: 2188.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.120000 | |
| Longitude: -82.640000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-11-13 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:11/13/2012, Expired Date:11/13/2014 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-12-19 | |
| Completion Report Received | 2013-02-28 | |
| Construction Permit Expires | 2014-11-13 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2013-03-04 | 2052 | 2057 | 51 |
| 2052 | 2057 | 51 | |
| 2052 | 2057 | 51 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2013-01-05 | H2O | 15 | 42440 Gal | 15000 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | KNOX ENERGY INC. | 0.00 | 307.00 | 270 |
| 2014 | KNOX ENERGY INC. | 2077.00 | 192.00 | 365 |
| 2015 | KNOX ENERGY INC. | 4407.00 | 412.00 | 365 |
| 2016 | KNOX ENERGY INC. | 3309.00 | 212.00 | 365 |
| 2017 | KNOX ENERGY INC. | 2112.00 | 173.00 | 365 |
| 2018 | KNOX ENERGY INC. | 1528.00 | 105.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2013 | KNOX ENERGY INC. | Brine | 171 | 270 |
| 2014 | KNOX ENERGY INC. | Brine | 5 | 365 |
| 2015 | KNOX ENERGY INC. | Brine | 7 | 365 |
| 2016 | KNOX ENERGY INC. | Brine | 3 | 365 |
| 2017 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2018 | KNOX ENERGY INC. | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1412887307 | 2012-12-17 0:00 | DD | No Violations | |
| -416328835 | 2020-6-1 0:00:0 | PW | No Violations | 0.50 |
| 0639031696 | 2012-12-17 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 8 inch surface casing today for Knox Energy on Kilbarger rig 5. Bill Mitton with Knox Energy was on location. Petroset was contracted to cement casing. Circulation was established and good cement returns were observed. Cement stayed at the surface. No cement basket was used. |
| 0679098612 | 2013-09-09 | Preliminary Restoration | No Violations | This inspection was conducted as a preliminary restoration status check. The well is located in a crop field. It was equipped with a pumping unit and motor. The area around the well has been restored. The tank battery consists of (1) 100 barrel tank and gas separator inside an earthen dike. Identification posted at the tank battery. Preliminary restoration meets ORC 1509.072. |
| 1412887307 | 2012-12-17 | Drill / Deepen / Reopen | No Violations | I inspected this drilling location today. Kilbarger rig 5 drilling during inspection. Depth approximately 590 feet. |
| 1917621628 | 2012-12-17 | Drill / Deepen / Reopen | No Violations | Today I witnessed the cementing of the surface casing for Knox Energy on Kilbarger rig 5. Bill Mitton was on location for Knox Energy. Knox Energy contracted Petroset Cementing for the cement job. Circulation was established and cement returned to surface. No cement basket was used. |
| 639031696 | 2012-12-17 0:00 | DD | No Violations | |
| 679098612 | 2013-9-9 0:00:0 | PL | No Violations |
For data sources see[9]