If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-26138 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.98,"lon":-82.7,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: ENVERON CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: ROBINSON FAMILY FARM LTD | |
License Status: Final Restoration | |
License Date: 2013-10-25 | |
Spud Date: 2013-10-29 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2013-11-02 | |
Well Total Depth: 3794.00 ft | |
Configuration: Vertical | |
Latitude: 39.980000 | |
Longitude: -82.700000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-10-25 | Proposed Formations:TREMPEALEAU/COPPER RIDGE, Issued Date:10/25/2013, Expired Date:10/25/2015 12:00:00 PM, Drilling unit acres:158.3057, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-11-02 | P&A 11/03/13 |
Plugged/Abandoned | 2013-11-04 | P&A 11/03/13 |
Completion Report Received | 2013-11-18 | P&A 11/03/13 |
Construction Permit Expires | 2014-10-25 | P&A 11/03/13 |
Record Last Modified | 2017-02-10 | P&A 11/03/13 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1070356505 | 2013-10-31 0:00 | DD | No Violations | |
-120075299 | 2014-3-27 0:00: | FR | No Violations | |
-1692416695 | 2013-11-3 0:00: | DD | No Violations | |
-38101533 | 2014-4-22 0:00: | FR | No Violations | |
-807523010 | 2013-10-30 0:00 | CS | No Violations | |
0038101533 | 2014-04-22 | Final Restoration | No Violations | Inspect location. Well location has been final graded. Inspection meets ORC 1509.072 requirements. |
0120075299 | 2014-03-27 | Final Restoration | No Violations | Inspect well location as part of a final restoration status check. The well has been plugged and equipment removed. The location will need a final grade before restoration can be passed. |
0807523010 | 2013-10-30 | Casing String Witnessed | No Violations | I witnessed the cementing of the 8 surface casing today for Enveron Corp. on Kilbarger rig #5. Bill Mitton was on location for Enveron. Petroset Cementing was contracted to cement the casing. Petroset broke circulation and good cement returns were observed. A cement basket was not used. |
1070356505 | 2013-10-31 | Drill / Deepen / Reopen | No Violations | I was on location to witness the BOP test on Kilbarger rig #5. The BOP passed the required test. |
1449958698 | 2013-11-01 | Drill / Deepen / Reopen | No Violations | I inspected drilling operations today accompanied by geologist Kenny Brown and Steve Riley. Kilbarger rig #5 drilling on air during inspection. Depth approximately 1,700 feet. No violations. |
1558043637 | 2013-10-29 | Drill / Deepen / Reopen | No Violations | I inspected drilling operations today. Kilbarger rig #5 moved in and rigged up. The drilling pits were being dug and kill water hauled onto location during inspection. Kilbarger will spud the well this evening. |
1692416695 | 2013-11-03 | Drill / Deepen / Reopen | No Violations | An inspection of drilling operations revealed Kilbarger rig #5 drilling in on air during inspection. Depth approximately 3,700 feet during inspection. No violations during inspection. |
1964327894 | 2013-11-04 | Plug / Plug Back | No Violations | I witnessed plugging operations today on Kilbarger rig #5 for Enveron Corp. Bill Mitton was on location for Enveron. Formation Cementing was contracted to plug well with Class A cement. All plugs set through drill pipe on rig. Refer to plug report for details. |
1974203536 | 2013-10-30 | Drill / Deepen / Reopen | No Violations | I inspected drilling operations today on Kilbarger rig #5. Kilbarger drilling on fluid during inspection. Pits were lined and fenced. No violations. |
For data sources see[3]