X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-089-26165

Well Details

Well ID: 34-089-26165
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: St. Albans Township
Operator Name: KNOX ENERGY INC.
Well Pad ID:
Farm/Lease Name: POPEYE THOMPSON FAMILY
License Status: Producing
License Date: 2015-06-12
Spud Date: 2015-07-24
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2015-07-28
Well Total Depth: 2134.00 ft
Configuration: Vertical
Latitude: 40.070000
Longitude: -82.640000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-06-12 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:6/12/2015, Expired Date:6/11/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-07-28
Completion Report Received 2015-10-14
Construction Permit Expires 2017-06-11
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-10-15 2014 2020 13
2014 2020 13
2014 2020 13

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-08-25 H2O 0 53000 Gal 15000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 KNOX ENERGY INC. 0.00 454.00 29
2016 KNOX ENERGY INC. 0.00 1676.00 365
2017 KNOX ENERGY INC. 0.00 1014.00 365
2018 KNOX ENERGY INC. 0.00 957.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 KNOX ENERGY INC. Brine 197 29
2016 KNOX ENERGY INC. Brine 37 365
2017 KNOX ENERGY INC. Brine 78 365
2018 KNOX ENERGY INC. Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1065044799 2015-7-22 0:00: DD No Violations
-472830220 2015-7-27 0:00: DD No Violations
-971811699 2015-8-31 0:00: PW No Violations
0472830220 2015-07-27 Drill / Deepen / Reopen No Violations Inspect drilling operations. Kilbarger rig 5 drilling on air at 1,550 feet during inspection. No violations. Time of inspection: 2:00 PM. Weather: 83*F, Sunny
0869727810 2015-07-28 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 4.5 production casing on Kilbarger rig 5 for Knox Energy. Bill Mitton was on location. Petroset Cementing was contracted to cement casing. The cement ticket was received. Time of inspection: 1:00 PM. Weather: 84*F, Sunny
0971811699 2015-08-31 Production Wells No Violations Inspect location. No activity. The well has been fraced. The well was equipped with rods and tubing. Drilling pits were closed. Frac tanks on location. No violations. Time of inspection: 4:40 PM. Weather: 86*F, Sunny
1065044799 2015-07-22 Drill / Deepen / Reopen No Violations Inspect drilling location. Kilbarger rig 5 moving in during inspection. Bill Mitton with Knox Energy on location. Well will be spudded today. Time of inspection: 12:30 PM. Weather: 84*F, Sunny
1438629279 2015-07-26 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 surface casing on Kilbarger rig #5 for Knox Energy. Mike Dickerson was on location for Knox Energy. Petroset Cementing was contracted to cement casing. Petroset broke circulation and good cement returns were observed. Cement did not fall back. The cement ticket was received. Time of inspection: 5:00 AM.
1543562638 2015-07-23 Drill / Deepen / Reopen No Violations I inspected drilling operations today. The rig was broke down and therefore had not spudded the well. The rig should be drilling by tomorrow night. Time of inspection: 12:30 PM.
2069081758 2015-07-16 Drill / Deepen / Reopen No Violations Well location and lease road being built during inspection. Rig will be moving in 7-20-2015. Time of inspection: 9:00 AM.
2096929108 2015-10-15 Preliminary Restoration No Violations Inspect well and location as part of a preliminary restoration status check. The well was equipped with a pumping unit and motor. Equipment has been removed and vegetation established. The tank battery consists of (1) 210 barrel tank and (1) 100 barrel tank inside an earthen dike. Identification was posted at the tank battery. Inspection meets ORC 1509.072 requirements. Time of inspection: 3:33 PM. Weather: 64*F, Sunny
869727810 2015-7-28 0:00: DD No Violations

For data sources see[9]

References