If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-089-26166 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.08,"lon":-82.56,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Licking | |
| Municipality: Granville Township | |
| Operator Name: DAVID R HILL INC | |
| Well Pad ID: | |
| Farm/Lease Name: KLARK UNIT | |
| License Status: Well Drilled | |
| License Date: 2015-07-01 | |
| Spud Date: 2015-08-31 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2015-09-16 | |
| Well Total Depth: 4374.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.080000 | |
| Longitude: -82.560000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-07-01 | Proposed Formations:ROSE RUN/TREMPEALEAU, Issued Date:7/1/2015, Expired Date:6/30/2017 12:00:00 PM, Drilling unit acres:41.49, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2015-09-16 | |
| Construction Permit Expires | 2017-06-30 | |
| Record Last Modified | 2017-10-23 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2016-01-14 | 3990 | 4279 | 90 |
| 3990 | 4279 | 90 | |
| 3990 | 4279 | 90 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2015-10-08 | ACID | 15 | 1500 Gal | 0 | Universal Well Services Inc. | STAGE 1/1
17 SHOTS |
| 2015-10-19 | ACID | 15 | 2500 Gal | 0 | Universal Well Services Inc. | STAGE 2/2
73 SHOTS |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2018 | DAVID R HILL INC | Brine | 0 | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1420278380 | 2015-9-9 0:00:0 | DD | No Violations | |
| -2039425485 | 2016-6-8 0:00:0 | PL | No Violations | |
| -2097350961 | 2015-10-19 0:00 | CT | No Violations | |
| -2133879797 | 2015-9-3 0:00:0 | CS | No Violations | |
| -2138069848 | 2015-9-15 0:00: | CS | No Violations | |
| -503927425 | 2015-10-15 0:00 | CT | No Violations | |
| -750512639 | 2015-12-3 0:00: | DD | No Violations | |
| -906552313 | 2015-9-14 0:00: | DD | No Violations | |
| 0208008612 | 2015-09-03 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger rig #5 drilling on fluid @ 390 feet with a 15 bit during inspection. No violations. Time of inspection: 12:20 PM. Weather: 85*F, Sunny |
| 0248276310 | 2015-08-07 | Drill / Deepen / Reopen | No Violations | Lease road being built during inspection. Lease road access will start at the Klark #1 location. Time of inspection: 9:20 AM. Weather: 60*F, Sunny |
| 0503927425 | 2015-10-15 | Completion Testing | No Violations | Inspect well location. Berry Well Service contracted to swab well. John Suhar on location for David R. Hill Inc. A bridge plug will be set and a higher zone perforated on 10-19-2015. No violations during inspection. Time of inspection: 2:30 PM. Weather: 64*F, Sunny |
| 0750512639 | 2015-12-03 | Drill / Deepen / Reopen | No Violations | Inspect well as part of a status check. The well was equipped with a rabbit wellhead. The pits have been closed. An additional tank has been set in the dike. No violations. Time of inspection: 9:15 AM. |
| 0906552313 | 2015-09-14 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger rig #5 drilling on fluid @ 4,163 feet during inspection. No violations. Time of inspection: 9:15 AM. Weather: 55*F, Sunny |
| 1103905688 | 2015-08-12 | Drill / Deepen / Reopen | No Violations | Lease road and well location being constructed during inspection. Greg Wycoff with Energy Services Corp. on location. Time of inspection: 12:15 PM. Weather: 80*F, Sunny |
| 1398035976 | 2015-09-01 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger rig #5 spudded on 8/31/2015. The rig was not drilling during inspection. Depth during inspection was 118 feet. Rig drilling on fluid and has encountered loss circulation problems. No violations. Time of inspection: 10:30 AM. Weather: 79*F, Sunny |
| 1413741903 | 2015-08-27 | Drill / Deepen / Reopen | No Violations | The location and lease road have been built. No activity during inspection. Time of inspection: 12:25 PM. Weather: 68*F, Cloudy |
| 1420278380 | 2015-09-09 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger cemented the 8.63 intermediate casing this morning. The job was not witnessed by inspector. Cement returns were observed at surface. Rig waiting on cement during inspection and will go back to drilling on air later today. Cement ticket received. Time of inspection: 1:00 PM. Weather: 79*F, Cloudy |
| 1441724422 | 2015-09-02 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger rig #5 drilling on fluid with 15 bit. Depth during inspection 280 feet. Note: Drift approximately 93 feet deep. No violations. Time of inspection: 9:30 AM. Weather: 73*F, Sunny |
| 1442260446 | 2015-09-11 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger rig #5 drilling on air @ 2,130 feet during inspection. No violations. Time of inspection: 10:15 AM. Weather: 70*F, Sunny |
| 1443180195 | 2015-09-15 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger rig 5 has achieved total depth @ 4,378. Baker Hughes was logging well during inspection. John Suhar was on location. Time of inspection: 8:30 AM. Weather: 50*F, Sunny |
| 1807886908 | 2015-08-31 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger rig #5 moved in and rigged up. Mud pit was constructed and lined. Rig prepared to spud well later in the evening. Time of inspection: 4:05 PM. Weather: 85*F, Sunny |
| 1850664467 | 2015-09-23 | Drill / Deepen / Reopen | No Violations | Inspect location. The well has been drilled and rig has moved to new location. The second stage cement job occurred on 9/18/2015 and was not witnessed. The 4.5 has a 2 swage and valve. The well was shut-in. No activity during inspection. Time of inspection: 9:30 AM. Weather: 56*F, Sunny |
| 2039425485 | 2016-06-08 | Preliminary Restoration | No Violations | Inspect location as a preliminary restoration status check. The well was equipped with a rabbit wellhead. The location has been restored. Vegetation was established. The tank battery consists of (3) 100 barrel tanks. Identification was not observed at the well. This well produces into a shared tank battery with API#6113. A card was left at the tank battery advising the company to post proper identification. Inspection meets ORC 1509.072 requirements. Time of inspection: 1:00 PM. Weather: 67*F, Partly cloudy |
| 208008612 | 2015-9-3 0:00:0 | DD | No Violations | |
| 2097350961 | 2015-10-19 | Completion Testing | No Violations | On location to witness Appalachian Well Survey to set bridge plug and perf casing. John Suhar was on location for David R. Hill Inc. No violations during inspection. Time of inspection: 8:50 AM. Weather: 35*F, Sunny |
| 2133879797 | 2015-09-03 | Casing String Witnessed | No Violations | I witnessed the cementing of the 11.75 surface casing today for David R. Hill Inc. on Kilbarger rig #5. John Suhar was on location for David R. Hill Inc. Universal Well Services was contracted to cement casing. Universal broke circulation and good cement returns were observed. A cement basket was used on the casing string. Cement did not drop. Refer to casing ticket for details. Time of inspection: 3:00 PM. |
| 2138069848 | 2015-09-15 | Casing String Witnessed | No Violations | I witnessed the cementing of the 4.5 production casing on Kilbarger rig 5. John Suhar was on location for the job. Universal Well Services was contracted to cement casing. A two stage cement tool was set @ 2,259 in order to isolate the Clinton sand. As the job began it was revealed that the wrong cement was mixed and pumped on the first stage. It was decided to circulate that cement around and start over with the correct cement. Attempt to circulate was unsuccessful as circulation was lost. Universal Well Services went a head and mixed Special Rose Run Cement (SRRC) for the first stage job. No problems were noted. The second stage job would occurr at a later date. Cement ticket received. Time of inspection: 5:30 PM. |
| 248276310 | 2015-8-7 0:00:0 | DD | No Violations | |
| 360716054 | 2020-8-6 0:00:0 | PW | No Violations | 0.50 |
For data sources see[9]