X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-089-26168

Well Details

Well ID: 34-089-26168
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: Licking Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: H RIESBECK
License Status: Producing
License Date: 2015-08-14
Spud Date: 2015-09-16
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2015-12-07
Well Total Depth: 4568.00 ft
Configuration: Vertical
Latitude: 40.000000
Longitude: -82.410000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-08-14 Proposed Formations:KNOX, Issued Date:8/14/2015, Expired Date:8/13/2017 12:00:00 PM, Drilling unit acres:96.96, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2015-08-28 CORRECTION TO CASING PROGRAM.
Reached Total Depth 2015-12-07
Completion Report Received 2016-01-29
Record Last Modified 2017-02-10
Construction Permit Expires 2017-08-13

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ARTEX OIL COMPANY 0.00 21.00 365
2016 ARTEX OIL COMPANY 11257.00 1898.00 365
2017 ARTEX OIL COMPANY 7959.00 1233.00 365
2018 ARTEX OIL COMPANY 3645.00 849.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ARTEX OIL COMPANY Brine 2152 365
2016 ARTEX OIL COMPANY Brine 119 365
2017 ARTEX OIL COMPANY Brine 96 365
2018 ARTEX OIL COMPANY Brine 29 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1323386090 2015-9-16 0:00: DD No Violations
-1403813032 2015-9-23 0:00: DD No Violations
-1496277145 2015-9-28 0:00: DD No Violations
-1998808862 2016-1-7 0:00:0 PL No Violations
-2018934757 2015-10-1 0:00: CT No Violations
-547723135 2015-9-19 0:00: CS No Violations
0256885947 2015-09-09 Drill / Deepen / Reopen No Violations Inspect location. The well location has been built and air pit constructed. Kilbarger rig #5 is scheduled to move in. Note: Entry @ N 40.00827 W -82.42830 Time of inspection: 3:15 PM. Weather: 81*F, Overcast
0547723135 2015-09-19 Casing String Witnessed No Violations I witnessed the cementing of the 8.63 casing on Kilbarger rig 5 for Artex Oil Co. Inc. Heath Halstead was on location for Artex. Formation Cementing was contracted to cement casing. Formation broke circulation and good cement returns were observed. Cement did not drop. A basket was not used. Cement ticket received. Time of inspection: 4:40 PM. Weather: 70*F, Sunny
1323386090 2015-09-16 Drill / Deepen / Reopen No Violations Inspect drill location. Kilbarger rig 5 moving in and rigging up during inspection. Well to be spudded this evening. Time of inspection: 10:35 AM. Weather: 61*F, Sunny
1385814656 2015-09-18 Casing String Witnessed No Violations I witnessed the cementing of the 11.75 casing on Kilbarger rig 5 for Artex Oil Co Inc. Heath Halstead was on location for Artex. Formation Cementing was contracted to cement casing. Formation broke circulation and good cement returns were observed. Cement did not drop. A basket was not used. Cement ticket received. Time of inspection: 4:40 AM. Weather: 52*F, Clear
1403813032 2015-09-23 Drill / Deepen / Reopen No Violations Inspect drilling operations. Kilbarger rig 5 drilling on air @ 3,684 during inspection. Rig will switch to fluid @ 4,360. Survey ran @ 3,633 revealed 2 degree deviation in well bore. No violations during inspection. Time of inspection: 10:30 AM. Weather: 68*F, Sunny
1437712234 2020-8-3 0:00:0 PW No Violations 0.50
1443196438 2015-09-24 Drill / Deepen / Reopen No Violations Inspect drilling operations. Kilbarger rig 5 drilling on air @ 4,107 during inspection. No violations. Time of inspection: 9:30 AM. Weather: 65*F, Sunny
1496277145 2015-09-28 Drill / Deepen / Reopen No Violations Inspect drilling location. The well has been drilled. Rig moved to new location. The 4.5 casing was cemented on 9/26/2015. No activity during inspection. No violations. Time of inspection: 4:45 PM. Weather: 77*F, Cloudy
1537342171 2015-09-17 Drill / Deepen / Reopen No Violations Inspect drilling operations. Kilbarger rig 5 drilling on fluid @ 179 during inspection. No violations. Time of inspection: 4:30 PM.
1998808862 2016-01-07 Preliminary Restoration No Violations This inspection was conducted as a status check. The well was equipped with a pumping unit and motor. The area around the well has been final graded and pits were closed. The well is located in an agricultural field. Crops will be planted around the well and therefore vegetation will not need to be established. The tank battery consists of (4) 210 barrel tanks inside an earthen dike and (2) horizontal separators outside of the dike. This well produces into a shared tank battery with the Riesbeck Unit #1 (API#6169). Identification will need to be posted at both wellheads and the tank battery. Inspection meets ORC 1509.072 requirements. Restoration is complete. Time of inspection: 8:45 AM. Weather: 16*F, Sunny
2018934757 2015-10-01 Completion Testing No Violations Inspect location. Bishop Well Service contracted to complete well. Producers Service Corp. performed acid treatment on well this morning. The job was not witnessed. Joe Snider was on location for Artex Oil Co. Service rig swabbing well during inspection. No violations. Time of inspection: 2:15 PM. Weather: 56*F, Overcast
256885947 2015-9-9 0:00:0 DD No Violations
884646714 2020-5-27 0:00: PW No Violations 0.50

For data sources see[7]

References