If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-26169 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40,"lon":-82.42,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Licking Township | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: RIESBECK UNIT | |
License Status: Producing | |
License Date: 2015-09-11 | |
Spud Date: 2015-10-09 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2015-10-20 | |
Well Total Depth: 4603.00 ft | |
Configuration: Vertical | |
Latitude: 40.000000 | |
Longitude: -82.420000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-09-11 | Proposed Formations:KNOX, Issued Date:9/11/2015, Expired Date:9/10/2017 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-10-20 | |
Completion Report Received | 2016-02-08 | |
Construction Permit Expires | 2017-09-10 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-05-02 | 4416 | 4477 | 75 |
4416 | 4477 | 75 | |
4416 | 4477 | 75 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-10-26 | ACID | 15 | 4500 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ARTEX OIL COMPANY | 0.00 | 0.00 | 365 |
2016 | ARTEX OIL COMPANY | 20667.00 | 2479.00 | 365 |
2017 | ARTEX OIL COMPANY | 6281.00 | 2254.00 | 365 |
2018 | ARTEX OIL COMPANY | 5102.00 | 2175.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ARTEX OIL COMPANY | Brine | 365 | |
2016 | ARTEX OIL COMPANY | Brine | 6 | 365 |
2017 | ARTEX OIL COMPANY | Brine | 4 | 365 |
2018 | ARTEX OIL COMPANY | Brine | 11 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1312973410 | 2015-10-9 0:00: | DD | No Violations | |
-1901990981 | 2016-1-7 0:00:0 | PL | No Violations | |
-450685547 | 2015-10-19 0:00 | CS | No Violations | |
0450685547 | 2015-10-19 | Casing String Witnessed | No Violations | I witnessed the cementing of the 4.5 production casing on Kilbarger rig #5 for Artex Oil Company. Heath Halstead on location for Artex. Formation Cementing was contracted to cement casing. The cement ticket was received. Time of inspection: 4:00 PM. |
0642175882 | 2015-10-14 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger rig #5 drilling on air @ 2,320 feet. No violations. Cement ticket for the 8 casing was received. Time of inspection: 10:20 AM. Weather: 49*F, Overcast |
1312973410 | 2015-10-09 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. Kilbarger rig #5 drilling on fluid @ 105. No violations. Time of inspection: 8:30 AM. Weather: 65*F, Overcast |
1446817990 | 2015-10-19 | Drill / Deepen / Reopen | No Violations | I inspected drilling operations today. Kilbarger rig #5 has drilled in. Baker Hughes was on location preparing to log well. Heath Halstead and Joe Snider was on location for Artex. No violations. Time of inspection: 7:30 AM. Weather: 29*F, Sunny |
179823011 | 2020-8-3 0:00:0 | PW | No Violations | 0.50 |
1802545351 | 2015-10-10 | Casing String Witnessed | No Violations | I witnessed the cementing of the 11.75 casing on Kilbarger rig #5 for Artex Oil Company. Heath Halstead was on location for Artex. Formation Cementing was contracted to cement casing. Formation broke circulation and good cement returns were observed. A cement basket was not used. Cement did not drop. Refer to casing report for details. The cement ticket was received. Time of inspection: 8:15 AM. Weather: 47*F, Sunny |
1901990981 | 2016-01-07 | Preliminary Restoration | No Violations | This inspection was conducted as a status check. The well was equipped with a rabbit wellhead. The area around the well has been restored and pits were closed. The well is located in an agricultural field. Crops will be planted around the well and therefore vegetation will not need to be established. The tank battery consists of (4) 210 barrel tanks inside an earthen dike and (2) horizontal separators outside of the dike. This well produces into a shared tank battery with the Riesbeck #1 (API#6168). Identification will need to be posted at both wellheads and the tank battery. Inspection meets ORC 1509.072 requirements. Restoration is complete. Time of inspection: 9:05 AM. Weather: 16*F, Sunny |
536137011 | 2020-5-27 0:00: | PW | No Violations | 0.50 |
642175882 | 2015-10-14 0:00 | DD | No Violations |
For data sources see[9]