If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-26171 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.02,"lon":-82.38,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: McDONALD DALE E | |
Well Pad ID: | |
Farm/Lease Name: WEEKLEY | |
License Status: Producing | |
License Date: 2015-09-29 | |
Spud Date: 2015-11-18 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 40.020000 | |
Longitude: -82.380000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-09-29 | Proposed Formations:BEREA, Issued Date:9/29/2015, Expired Date:9/28/2017 12:00:00 PM, Drilling unit acres:76.65, Proposed Well Type:OG, Proposed Well Class: |
Construction Permit Expires | 2017-09-28 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | McDONALD DALE E | 0.00 | 30.00 | 365 |
2017 | McDONALD DALE E | 0.00 | 0.00 | 0 |
2018 | McDONALD DALE E | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | McDONALD DALE E | Brine | 0 | 365 |
2017 | McDONALD DALE E | Brine | 0 | 0 |
2018 | McDONALD DALE E | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1089589319 | 2020-4-22 0:00: | PL | No Violations | 0.50 |
-1151347039 | 2017-5-22 0:00: | PL | No Violations | 0.50 |
-1367244798 | 2016-6-17 0:00: | DD | No Violations | |
-1375573559 | 2016-2-5 0:00:0 | AM | No Violations | |
-1386157754 | 2017-5-8 0:00:0 | PL | No Violations | |
-1423450791 | 2015-12-17 0:00 | CS | No Violations | |
-1484427056 | 2016-5-11 0:00: | DD | No Violations | |
-1576412030 | 2016-7-12 0:00: | DD | No Violations | |
-192416292 | 2020-8-3 0:00:0 | PW | No Violations | 0.50 |
-1973294519 | 2020-8-31 0:00: | PL | No Violations | 0.50 |
-875867900 | 2016-4-11 0:00: | DD | No Violations | |
-921083097 | 2016-3-11 0:00: | DD | No Violations | |
0381990376 | 2016-02-05 | Drill / Deepen / Reopen | No Violations | Inspect location to check pit water again. A layer of ice was observed in the pit. The ice was broken in order to obtain water sample. Water was field tested with Quantab titrator. The field test result was approximately 235 PPM Chlorides. Time of inspection: 9:00 AM. Weather: 22*F, Sunny |
0495028342 | 2015-11-30 | Drill / Deepen / Reopen | No Violations | An inspection of drilling operations revealed no activity. The well has been spudded. The pit did not have a liner. The well owner will be advised to install a liner in the pit. Time of inspection: 2:00 PM. Weather: 42*F, Overcast |
0660783096 | 2016-02-24 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. No activity. Check pit due to large rainfall event this day. Fluid level ok. Time of inspection: 3:30 PM. Weather: 61*F, Overcast |
0875867900 | 2016-04-11 | Drill / Deepen / Reopen | No Violations | Inspect location as a status check. No activity during inspection. Pit level ok. Time of inspection: 10:00 AM. Weather: 52*F, Rain |
0914907230 | 2015-10-22 | Drill / Deepen / Reopen | No Violations | Inspect location. Jeremy McDonald has moved in his cable tool rig. The well has not been spudded. No activity during inspection. Time of inspection: 9:20 AM. Weather: 56*F, Sunny |
0921083097 | 2016-03-11 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. No activity. Check fluid level in pit. Pit ok. Time of inspection: 3:40 PM. Weather: 58*F, Sunny |
1151347039 | 2017-05-22 | Preliminary Restoration | No Violations | This inspection was conducted as a compliance notice follow-up. The inspection revealed that the pit has not been closed as of this date. I received a phone call this morning from Mike McDonald informing me that the pit has not been closed. Mr. McDonald was advised to work on having the pit closed the following week. Time of inspection: 11:15 AM. Weather: 63*F, Partly cloudy |
1367244798 | 2016-06-17 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. No activity during inspection. The well was shot with nitro gel on 6/1/2016. The stimulation was not witnessed. No violations during inspection. Time of inspection: 10:35 AM. Weather: 72*F, Partly cloudy |
1375573559 | 2016-02-05 | Administrative Inspection | No Violations | A phone call was placed to Dale E. McDonald (Jeremy McDonald) at 2:33 PM and was advised to monitor fluid level in pit. It was suggested that water be pumped out to keep fluid at a safe level. Jeremy stated that they would do that and would prevent pit from overflowing. Jeremy informed me that drilling operations are ongoing. The well has been drilled but they are waiting to shoot the well. Once the well is shot it will be cleaned out. |
1386157754 | 2017-05-08 | Preliminary Restoration | Violations Noted | This inspection was conducted as a status check. The drilling rig was set up on the well during the inspection. The well was not in production at the time of inspection. The well was shut-in with a swage and valve. The inspection revealed that the drilling pit has not been closed as of this inspection. The pit will need to be closed within 10 days. According to ORC 1509.072 (A) the drilling pit shall be closed within two months after the date upon which the drilling of a well is completed. Once the pit has been closed work will need to begin on finishing the rest of the preliminary restoration. Time of inspection: 11:05 AM. Weather: 52*F, Sunny |
1423450791 | 2015-12-17 | Casing String Witnessed | No Violations | I witnessed the cementing of the 5.5 surface casing for Dale E. McDonald on Jeremy McDonalds cable tool rig. Jeremy and Mike McDonald were on location. Cemenco was contracted to cement casing. Cemenco broke circulation and good cement returns were observed. Cement dropped approximately 3 feet. A basket was not used. The ticket was received. Time of inspection: 2:30 PM. |
1454935267 | 2016-02-04 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. No personnel on location during inspection. The rig was still on location. The 5.5 had a swage and valve on it. During the inspection oil was observed on the pit water and just outside of the pit. It appears that a recent large rainfall event has allowed oil/water to breach pit bank. The amount of oil outside of the dike would approximately be less than a gallon. The pit water was field tested with a Quantab titrator. The field test revealed a 5.0 reading which equals approximately 224 PPM Chlorides. This is below EPA Secondary Drinking Water standards of 250 PPM Chlorides. The pit was properly lined during inspection. Photos were taken of pit. The well owner will be notified and advised to prevent fluids from escaping pit. The inspection also revealed cement has dropped on the backside of the 5.5 further than the three feet mentioned in the previous inspection. Cement will need to be added and filled to surface. Time of inspection: 11:30 AM. Weather: 32*F, Overcast |
1456321612 | 2016-02-22 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. No activity during inspection. Drilling operations are ongoing. Pit level ok. Will continue to monitor. Time of inspection: 8:30 AM. Weather: 32*F, Partly cloudy |
1461081714 | 2016-04-18 | Administrative Inspection | No Violations | A voice mail message was left for Dale E. McDonald (Jeremy McDonald) at 10:30 AM regarding cement drop on the backside of the casing. Jeremy was advised to fill up backside of casing with concrete before the well is shot. |
1464193546 | 2016-05-18 | Drill / Deepen / Reopen | No Violations | Inspect drilling operations. No activity during inspection. Pit ok. A phone call was placed to Jeremy McDonald regarding filling up backside of casing. Jeremy stated that he has been adding clay instead of concrete to prevent bridging. Jeremy said it would be finished before well is shot. Time of inspection: 10:20 AM. Weather: 54*F, Sunny |
1484427056 | 2016-05-11 | Drill / Deepen / Reopen | No Violations | Inspect location. No activity during inspection. Pit ok. Time of inspection: 3:00 PM. Weather: 68*F, Partly cloudy |
1495719618 | 2017-05-25 | Preliminary Restoration | No Violations | This inspection was conducted as a compliance notice follow-up. The closure of the pit has begun but was not finished during inspection. Jeremy McDonald left a voicemail at 5:17 PM on 5/24/17 indicating that the pit would be completely closed in by the following week. Time of inspection: 9:30 AM. Weather: 61*F, Light rain |
1496321656 | 2017-06-01 | Preliminary Restoration | No Violations | Inspect location as a compliance notice follow-up. The pit has not been completely closed in. The company will be advised to continue working on closing it in. Time of inspection: 8:45 AM. |
1576412030 | 2016-07-12 | Drill / Deepen / Reopen | No Violations | Inspect location as a status check. The rig was still on the well. No activity during inspection. No violations observed. Time of inspection: 9:35 AM. Weather: 77*F, Sunny |
1586474084 | 2017-06-15 | Preliminary Restoration | No Violations | This inspection was conducted as a follow-up. The inspection revealed that the pit has been closed. The company will be advised to work on the remainder of the restoration. Time of inspection: 8:45 AM. |
1691125761 | 2016-10-14 | Drill / Deepen / Reopen | No Violations | Inspect location. No personnel during inspection on location. The drilling rig is still on well. The well had a 5 inch x 2 inch swage and valve on it. A gauge on the casing showed 5 pounds of gas pressure. The pit has not been closed yet. Jeremy McDonald will be advised to close the pit as soon as possible. Time of inspection: 11:00 AM. Weather: 47*F, Sunny |
381990376 | 2016-2-5 0:00:0 | DD | No Violations | |
495028342 | 2015-11-30 0:00 | DD | No Violations | |
660783096 | 2016-2-24 0:00: | DD | No Violations | |
914907230 | 2015-10-22 0:00 | DD | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1386157754 | US-OH-111461 | 2017-05-25 | NONE3 | Failure to close drilling pits within two months |
For data sources see[7]