Well ID: 34-089-26183 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.23,"lon":-82.21,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Fallsbury Township | |
Operator Name: DUGAN OIL AND GAS LLC | |
Well Pad ID: | |
Farm/Lease Name: MORNINGSTAR LESTER & JENNIFER | |
License Status: Final Restoration | |
License Date: 2016-09-09 | |
Spud Date: 2017-12-05 | |
Spud Drilling Contractor: | |
Final Drill Date: 2017-12-20 | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 40.230000 | |
Longitude: -82.210000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-09-09 | Proposed Formations:CLINTON SAND, Issued Date:9/9/2016, Expired Date:9/9/2018 12:00:00 PM, Drilling unit acres:80.19, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-12-20 | |
Plugged/Abandoned | 2018-04-23 | |
Construction Permit Expires | 2018-09-09 | |
Record Last Modified | 2018-11-08 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-03-19 | H2O | 0 | 32039 Gal | 30000 | Producers Service Corporation | I witnessed this frac job today on the Morningstar #3. Guy Dugan was on location for the job. Producers Service Corp. (PSC) was contracted to frac the well. PSC used approximately 800 barrels of water, 300 sacks of sand, and 450 gallons of acid during the job. |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1539332188 | 2019-10-15 0:00 | FR | No Violations | 0.20 |
-511651701 | 2018-3-20 0:00: | CT | No Violations | 2.50 |
-923708046 | 2018-3-21 0:00: | CS | No Violations | 1.00 |
0511651701 | 2018-03-20 | Completion Testing | No Violations | I witnessed the frac job on this well today. Dugan Oil and Gas contracted Producers Service Corp. to frac the well. Guy Dugan, Harold Donaker, and Max Donaker were present for the job. I received the job ticket after the job was finished. Refer to the report for details. Time of inspection: 9:00 AM. |
0880714100 | 2017-12-26 | Drill / Deepen / Reopen | No Violations | I spoke with Max Donaker during the inspection. Max was hauling a tank from the drilling location today. The well has been drilled and the 4.5 inch casing was cemented on 12/20/2017. I will receive the cement ticket next week. Time of inspection: 11:00 AM. Weather: 15*F, Partly cloudy |
0923708046 | 2018-03-21 | Casing String Witnessed | No Violations | During my inspection Max Donaker was swabbing the well. I received the cement ticket for the 4.5 inch cement job during the inspection. Time of inspection: 10:15 AM. Weather: 31 degrees F, Snow |
1146160343 | 2017-12-20 | Drill / Deepen / Reopen | No Violations | I inspected drilling operations today. H & D Drilling has reached total depth and was preparing to install the 4.5 inch production casing. The cement job was scheduled for 4:00 PM today. I told Harold Donaker that I would not be able to witness the cement job. I was provided with a copy of proof of casing pressure test. Time of inspection: 11:30 AM. |
1511973362 | 2017-11-29 | Drill / Deepen / Reopen | No Violations | During my inspection Max Donaker with H & D Drilling was preparing the access road so that the rig could be moved in. H & D Drilling has been contracted to drill this well. The well location was observed. Max Donaker informed me that the well stake had been pulled from the ground and he was unsure of where it was originally staked. I told Max that the surveyor would need to stake the well location again. I also made a phone call to Mr. Guy Dugan and advised him that the well location would need to be re-staked before the well could be spudded. The rig had not been brought to the well location as of this inspection. Time of inspection: 9:30 AM. |
1512485065 | 2017-12-01 | Drill / Deepen / Reopen | No Violations | I inspected this drilling location today. The well location was surveyed again and the well stake was reset. H & D Drilling was moving in their rig and preparing the location. The well should be spudded after the weekend. Time of inspection: 11:00 AM. Weather: 39*F, Sunny |
1512743141 | 2017-12-08 | Casing String Witnessed | No Violations | I inspected drilling operations today. H & D Drilling spudded the well on 12/5/2017. Max Donaker informed me that they installed approximately 62 feet of 10.75 inch drive pipe. The casing program on this permit calls for 11 inch drive pipe and 8.63 inch surface casing. Dugan Oil and Gas LLC. has decided to install 10 inch drive pipe and 7 inch surface casing. The amended casing program meets OAC 1501:9-1-08 (H) Wellbore diameters requirements. The rig was drilling during my inspection. The drilling pit was properly lined and the permit was on location. The 7 inch casing was observed. A total of 15 joints of 17 lb./ft. used 7 inch casing appeared to be in good condition. The paperwork showing that the casing was tested was provided to me during the inspection. No violations were observed. Time of inspection: 9:15 AM. Weather: 20*F, Sunny |
1513176805 | 2017-12-12 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 7 inch surface casing today. Cement did not return to surface. Refer to cement ticket report for details. Time of inspection: 1:00 PM. Weather: 25*F, Partly cloudy |
1513614326 | 2017-12-18 | Drill / Deepen / Reopen | No Violations | I inspected drilling operations today. H & D Drilling has switched over to power swivel. During the inspection they were drilling on air and just drilled through the Big Lime. Max Donaker said they should drill in tonight. Time of inspection: 10:30 AM. Weather: 39*F, Overcast |
1524590703 | 2018-04-23 | Plug / Plug Back | No Violations | I witnessed plugging operations today on the Morningstar #3 well for Dugan Oil and Gas LLC. H & D Drilling plugged the well with their drilling rig. Cemenco was contracted to pump cement. Refer to plug report for details. Time of inspection: 8:20 AM. |
1534422554 | 2018-08-16 | Final Restoration | No Violations | This well was plugged off of the drilling rig. My inspection revealed that the drilling pits was closed. The drilling rig and equipment has been removed. The well location was graded and adequate vegetation was observed. I did observe 5 frac tanks on the well location. The restoration will be passed when the tanks are removed. Time of inspection: 8:15 AM. Weather: 69 degrees F, Partly cloudy |
1543503857 | 2018-11-29 | Final Restoration | No Violations | My inspection revealed that the frac tanks have been removed. I did not observe any vegetation on the lease road. I contacted Guy Dugan regarding the inspection. Mr. Dugan told me the landowner was satisfied with the restoration. I informed Guy that if the landowner signed a waiver for the road I would pass the restoration. Time of inspection: 9:35 AM. Weather: 28 degrees F, Sunny |
880714100 | 2017-12-26 0:00 | DD | No Violations | 0.50 |
For data sources see[4]