If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-089-62641 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.12,"lon":-82.41,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: WHEELER MICHAEL D | |
| Well Pad ID: | |
| Farm/Lease Name: MCKINNEY E | |
| License Status: Producing | |
| License Date: 1996-02-20 | |
| Spud Date: 1900-01-01 | |
| Spud Drilling Contractor: | |
| Final Drill Date: | |
| Well Total Depth: | |
| Configuration: Vertical | |
| Latitude: 40.120000 | |
| Longitude: -82.410000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1801-01-02 | 79 OXFORD OIL CO |
| Oil and Gas | 1802-01-01 | |
| CO | 1996-02-20 | 79 OXFORD OIL CO GeoDate 2/20/96 |
| Unknown | 1996-02-20 | Issued Date 2/20/96 Expired Date 2/19/97 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
| CO | 1996-05-17 | 5476 WHEELER MICHAEL D GeoDate 2/20/96 |
| Construction Permit Expires | 1997-02-19 | DATE COMPLETED : UNKNOWN |
| Record Last Modified | 2013-10-03 | DATE COMPLETED : UNKNOWN |
For data sources see[2]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1995 | OXFORD OIL | 0.00 | 81.00 | 365 |
| 1996 | OXFORD OIL | 0.00 | 23.00 | 366 |
| 1997 | WHEELER MICHAEL D | 0.00 | 86.00 | 365 |
| 1998 | WHEELER MICHAEL D | 0.00 | 60.00 | 365 |
| 1999 | WHEELER MICHAEL D | 0.00 | 58.00 | 365 |
| 2000 | WHEELER MICHAEL D | 0.00 | 45.00 | 365 |
| 2001 | WHEELER MICHAEL D | 0.00 | 22.00 | 365 |
| 2002 | WHEELER MICHAEL D | 0.00 | 100.00 | 365 |
| 2003 | WHEELER MICHAEL D | 0.00 | 77.00 | 365 |
| 2004 | WHEELER MICHAEL D | 0.00 | 67.00 | 365 |
| 2005 | WHEELER MICHAEL D | 0.00 | 88.00 | 365 |
| 2007 | WHEELER MICHAEL D | 0.00 | 61.00 | 365 |
| 2008 | WHEELER MICHAEL D | 0.00 | 85.00 | 365 |
| 2009 | WHEELER MICHAEL D | 0.00 | 80.00 | 365 |
| 2010 | WHEELER MICHAEL D | 0.00 | 56.00 | 365 |
| 2012 | WHEELER MICHAEL D | 0.00 | 72.00 | 366 |
| 2013 | WHEELER MICHAEL D | 0.00 | 82.00 | 365 |
| 2014 | WHEELER MICHAEL D | 0.00 | 65.00 | 365 |
| 2015 | WHEELER MICHAEL D | 0.00 | 70.00 | 365 |
| 2016 | WHEELER MICHAEL D | 0.00 | 68.00 | 365 |
| 2017 | WHEELER MICHAEL D | 0.00 | 65.00 | 365 |
| 2018 | WHEELER MICHAEL D | 0.00 | 66.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1995 | OXFORD OIL | Brine | 15 | 365 |
| 1996 | OXFORD OIL | Brine | 9 | 366 |
| 1997 | WHEELER MICHAEL D | Brine | 10 | 365 |
| 1998 | WHEELER MICHAEL D | Brine | 8 | 365 |
| 1999 | WHEELER MICHAEL D | Brine | 9 | 365 |
| 2000 | WHEELER MICHAEL D | Brine | 5 | 365 |
| 2001 | WHEELER MICHAEL D | Brine | 0 | 365 |
| 2002 | WHEELER MICHAEL D | Brine | 10 | 365 |
| 2003 | WHEELER MICHAEL D | Brine | 5 | 365 |
| 2004 | WHEELER MICHAEL D | Brine | 10 | 365 |
| 2005 | WHEELER MICHAEL D | Brine | 10 | 365 |
| 2007 | WHEELER MICHAEL D | Brine | 25 | 365 |
| 2008 | WHEELER MICHAEL D | Brine | 52 | 365 |
| 2009 | WHEELER MICHAEL D | Brine | 35 | 365 |
| 2010 | WHEELER MICHAEL D | Brine | 22 | 365 |
| 2012 | WHEELER MICHAEL D | Brine | 28 | 366 |
| 2013 | WHEELER MICHAEL D | Brine | 32 | 365 |
| 2014 | WHEELER MICHAEL D | Brine | 30 | 365 |
| 2015 | WHEELER MICHAEL D | Brine | 47 | 365 |
| 2016 | WHEELER MICHAEL D | Brine | 35 | 365 |
| 2017 | WHEELER MICHAEL D | Brine | 14 | 365 |
| 2018 | WHEELER MICHAEL D | Brine | 12 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1560278794 | 2020-6-11 0:00: | PW | No Violations | 0.50 |
| -1860815651 | 2018-2-27 0:00: | PW | No Violations | 0.50 |
| 1860815651 | 2018-02-27 | Production Wells | No Violations | My inspection revealed that the well was equipped with a pumping unit and motor. This well produces into a shared tank battery. I observed identification at the well and tank battery. The tank battery consists of (3) 100 barrel tanks and a plastic brine tank. I took GPS readings at the well, tank battery, and lease road entry point. Time of inspection: 11:10 AM. Weather: 40 degrees F, Sunny |
For data sources see[7]