If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-21010 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.07,"lon":-80.79,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Austintown Township | |
Operator Name: J WELL SERVICE INC | |
Well Pad ID: | |
Farm/Lease Name: DUNN A | |
License Status: Producing | |
License Date: 1978-03-27 | |
Spud Date: 1978-04-27 | |
Spud Drilling Contractor: | |
Final Drill Date: 1978-05-04 | |
Well Total Depth: 5160.00 ft | |
Configuration: Vertical | |
Latitude: 41.070000 | |
Longitude: -80.790000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1978-03-27 | 1388 NORTH COAST ENERGY INC GeoDate 3/27/78 |
Oil and Gas | 1978-03-27 | Issued Date 3/27/78 Expired Date 3/27/79 Acres 0000000 Tool Type Proposed Formation Proposed Depth Proposed Drill Depth |
Original Spud | 1978-04-27 | R.I. 4-5-78 |
Completed | 1978-05-04 | R.I. 4-5-78 |
Reached Total Depth | 1978-05-04 | R.I. 4-5-78 |
Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
Record Last Modified | 2015-01-27 | R.I. 4-5-78 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5011 | 5051 | 21 |
5011 | 5051 | 21 | |
5011 | 5051 | 21 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | EXCO - NORTH COAST ENERGY INC | 2819.00 | 0.00 | 0 |
1985 | EXCO - NORTH COAST ENERGY INC | 2966.00 | 0.00 | 365 |
1986 | EXCO - NORTH COAST ENERGY INC | 2977.00 | 0.00 | 365 |
1987 | EXCO - NORTH COAST ENERGY INC | 2841.00 | 0.00 | 365 |
1988 | EXCO - NORTH COAST ENERGY INC | 2992.00 | 63.00 | 365 |
1989 | EXCO - NORTH COAST ENERGY INC | 2146.00 | 0.00 | 365 |
1990 | EXCO - NORTH COAST ENERGY INC | 863.00 | 0.00 | 365 |
1991 | EXCO - NORTH COAST ENERGY INC | 925.00 | 0.00 | 365 |
1992 | EXCO - NORTH COAST ENERGY INC | 0.00 | 0.00 | 365 |
1993 | EXCO - NORTH COAST ENERGY INC | 0.00 | 0.00 | 365 |
1998 | D & L ENERGY INC | 2351.00 | 0.00 | 365 |
1999 | D & L ENERGY INC | 2553.00 | 49.00 | 365 |
2000 | D & L ENERGY INC | 3755.00 | 0.00 | 365 |
2001 | D & L ENERGY INC | 2813.00 | 27.00 | 365 |
2002 | D & L ENERGY INC | 2486.00 | 0.00 | 365 |
2003 | D & L ENERGY INC | 2567.00 | 0.00 | 365 |
2004 | D & L ENERGY INC | 1381.00 | 40.00 | 365 |
2005 | D & L ENERGY INC | 1252.00 | 0.00 | 365 |
2006 | D & L ENERGY INC | 1880.00 | 0.00 | 365 |
2007 | D & L ENERGY INC | 1755.00 | 0.00 | 365 |
2008 | D & L ENERGY INC | 1993.00 | 36.00 | 366 |
2009 | D & L ENERGY INC | 1859.00 | 0.00 | 365 |
2010 | D & L ENERGY INC | 1913.00 | 0.00 | 365 |
2011 | D & L ENERGY INC | 1143.00 | 0.00 | 0 |
2012 | D & L ENERGY INC | 2041.00 | 12.00 | 365 |
2013 | D & L ENERGY INC | 1001.00 | 0.00 | 148 |
2014 | D & L ENERGY INC | 996.00 | 0.00 | 124 |
2015 | BOBCAT WELL & PIPELINE LLC | 187.00 | 0.00 | 32 |
2016 | BOBCAT WELL & PIPELINE LLC | 565.00 | 10.00 | 65 |
2017 | BOBCAT WELL & PIPELINE LLC | 2651.00 | 6.00 | 213 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1665132347 | 2014-6-3 0:00:0 | PW | No Violations | 3.00 |
-1895400299 | 2012-2-9 0:00:0 | PW | No Violations | 1.00 |
-19173415 | 2014-6-5 0:00:0 | PW | No Violations | 3.00 |
0019173415 | 2014-06-05 | Production Wells | No Violations | I was on location to perform a follow up inspection. KDA is on location with equipment performing the clean up . Water trucks are finishing vacuuming oil from the pond, booms are located at the spillway. Roll offs are on location, a backhoe is removing contaminated soil. The clean up is progressing slowly. |
0856949538 | 2009-09-18 | Production Wells | No Violations | I GPSd both the wellhead and the tank battery for the first time. I continued my walk around the tank battery and the wellhead and found that there were no violations at this time. |
1401722020 | 2014-05-27 | Production Wells | Violations Noted | On 5/27/2014, 1600 hrs. I received a phone call from Wendy Booth from our Uniontown Office. She stated that Dave Rice Field Supervisor for D&L Energy had an oil/brine release at this well. When I arrived on location I spoke to the Well Tender, he stated that there was about 450 gallons ( 10 ) barrels released. The tank battery has one 35 barrel plastic production tank and one vertical separator. There was no dike or containment around tank battery. The well is equipped with 2 tubing. Austintown Fire Department, Mahoning County Haz-Mat Team, Ohio EPA and the Ohio Division of Wildlife were also on location. We walked the release trail to a private pond. From the pond we walked west to a storm drain 690+/- we did not discover any release past the pond. D&L Energy Personnel were instructed to remove all contaminated soil and properly dispose of soil. Vacuum the oil from the pond and dispose of at a UIC approve injection well. All areas of disturbance will be reclaimed and seeded. Tank battery will be rebuilt with a dike that will contain the fluids based on the size of tanks installed. |
1409664166 | 2014-05-28 | Production Wells | No Violations | I was on location with Wade Balser from the Ohio EPA to follow up on the clean up operation from the brine and oil release that was reported on 5/27/2014. KDA is on location with equipment to start the clean up . Water trucks are vacuuming oil from the pond, booms are located at the spillway. Roll offs are on location, a backhoe is removing contaminated soil. Wade and I walked from the tank battery to the pond and found that the vegetation and soil along the ditch has to be removed. All fluids were contained inside the pond. |
1409667711 | 2014-05-29 | Production Wells | No Violations | I was on location with Wade Balser from the Ohio EPA to follow up on the clean up operation from the brine and oil release that was reported on 5/27/2014. KDA is on location with equipment to start the clean up . Water trucks are vacuuming oil from the pond, booms are located at the spillway. Roll offs are on location, a backhoe is removing contaminated soil. The clean up is progressing slowly. The backhoe is pulling the vegetation away from the edge of the pond that has oil residue on it and putting it into containers. After they remove this they will finish vacuuming the pond. Wade Balser from the Ohio EPA has finished his inspection. The tank battery consist of one 35 barrel tank and one vertical separator. The well is equipped with 1.5 tubing. Well is shut in at this time. |
1409747123 | 2014-06-13 | Production Wells | No Violations | I was on location to perform a follow up inspection. KDA is on location with equipment performing the clean up. The clean up is progressing slowly. The tank battery consist of one 35 barrel tank and one vertical separator. The well is equipped with 1.5 tubing. Well is shut in at this time. |
1426943527 | 2015-03-16 | Production Wells | No Violations | I performed a follow up inspection on this location. Compliance Notice dated 5/27/2014 #1401722020 can be closed. Vegetation has been established in all of the disturbed areas. Landscape has been replaced. Dike has been rebuild. The tank battery is equipped with one (1) 35 barrel poly tank and one (1) horizontal separator. The well is an 1.5 plunger lift. ID signs are posted. No noted violations at this time. This Compliance Notice is closed. |
1665132347 | 2014-06-03 | Production Wells | No Violations | I was on location to perform a follow up inspection. KDA is on location with equipment performing the clean up . Water trucks are finishing vacuuming oil from the pond, booms are located at the spillway. Roll offs are on location, a backhoe is removing contaminated soil. The clean up is progressing slowly. The tank battery consist of one 35 barrel tank and one vertical separator. The well is equipped with 1.5 tubing. Well is shut in at this time. |
1895400299 | 2012-02-09 | Production Wells | No Violations | On 02/06/2012, DNR Inspector Richard Skidmore completed a production well inspection status check for DNR Inspector Chris Grimm. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed. |
856949538 | 2009-9-18 0:00: | PW | No Violations | |
985937679 | 2020-2-13 0:00: | PW | No Violations | 1.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1401722020 | US-OH-111886 | 2015-07-02 | Dike or pit not able to prevent escape of brine or other wastes |
For data sources see[8]