X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-21712

Well Details

Well ID: 34-099-21712
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Jackson Township
Operator Name: KLEESE DEVELOPMENT ASSOCIATES
Well Pad ID:
Farm/Lease Name: FED
License Status: Producing
License Date: 1998-01-05
Spud Date: 1984-04-24
Spud Drilling Contractor: B & K DRLG
Final Drill Date: 1985-05-02
Well Total Depth: 5124.00 ft
Configuration: Vertical
Latitude: 41.100000
Longitude: -80.860000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1984-04-20 1510 B & K DRILLING CO GeoDate 4/20/84
Oil and Gas 1984-04-20 Issued Date 4/20/84 Expired Date 10/17/84 Acres 0044000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05124 Proposed Drill Depth 05124
Original Spud 1984-04-25
Completed 1985-05-02
Reached Total Depth 1985-05-02
Completion Report Received 1985-10-17
CO 1995-01-30 2655 KLEESE DEVELOPMENT ASSOCS GeoDate 4/20/84
APP 1998-01-05 Proposed Formations:CLINTON, Issued Date:1/5/98, Expired Date:1/5/99 6:00:00 AM, Drilling unit acres:44, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 1999-01-05
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4832 4922 0
4832 4922 0
2006-09-11 4844 4921 24
4844 4921 24
4832 4922 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 78000 Gal 50000 FRAC;H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1990 B & K DRILLING CO 17198.00 55.00 365
1991 B & K DRILLING CO 14339.00 0.00 365
1992 BOSSOW OIL MGMT INC 12450.00 61.00 365
1993 B & K DRILLING CO 10281.00 0.00 365
1994 B & K DRILLING CO 9948.00 0.00 365
1995 KLEESE DEVELOPMENT ASSOCIATES 7580.00 0.00 365
1996 KLEESE DEVELOPMENT ASSOCIATES 9354.00 0.00 365
1997 KLEESE DEVELOPMENT ASSOCIATES 7427.00 0.00 365
1998 KLEESE DEVELOPMENT ASSOCIATES 6710.00 0.00 365
2000 KLEESE DEVELOPMENT ASSOCIATES 7869.00 52.00 365
2001 KLEESE DEVELOPMENT ASSOCIATES 7261.00 0.00 365
2002 KLEESE DEVELOPMENT ASSOCIATES 8323.00 0.00 365
2003 KLEESE DEVELOPMENT ASSOCIATES 5833.00 0.00 365
2004 KLEESE DEVELOPMENT ASSOCIATES 7793.00 0.00 365
2005 KLEESE DEVELOPMENT ASSOCIATES 5094.00 0.00 365
2006 KLEESE DEVELOPMENT ASSOCIATES 7213.00 0.00 365
2007 KLEESE DEVELOPMENT ASSOCIATES 6443.00 0.00 365
2008 KLEESE DEVELOPMENT ASSOCIATES 6133.00 0.00 365
2009 KLEESE DEVELOPMENT ASSOCIATES 6946.00 0.00 365
2010 KLEESE DEVELOPMENT ASSOCIATES 5573.00 0.00 365
2012 KLEESE DEVELOPMENT ASSOCIATES 6002.00 0.00 366
2013 KLEESE DEVELOPMENT ASSOCIATES 5351.00 0.00 365
2014 KLEESE DEVELOPMENT ASSOCIATES 4931.00 0.00 365
2015 KLEESE DEVELOPMENT ASSOCIATES 4336.00 0.00 365
2016 KLEESE DEVELOPMENT ASSOCIATES 4047.00 0.00 365
2017 KLEESE DEVELOPMENT ASSOCIATES 3579.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1990 B & K DRILLING CO Brine 5 365
1991 B & K DRILLING CO Brine 0 365
1992 BOSSOW OIL MGMT INC Brine 8 365
1993 B & K DRILLING CO Brine 0 365
1994 B & K DRILLING CO Brine 0 365
1995 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
1996 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
1997 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
1998 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2000 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2001 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2002 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2003 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2004 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2005 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2006 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2007 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2008 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2009 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2010 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2012 KLEESE DEVELOPMENT ASSOCIATES Brine 83 366
2013 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2014 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2015 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2016 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365
2017 KLEESE DEVELOPMENT ASSOCIATES Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-139506924 2015-6-8 0:00:0 PW No Violations 0.70
-1805754084 2013-11-21 0:00 PW No Violations 1.00
-219050687 2015-5-6 0:00:0 PW No Violations 1.50
-984391039 2004-3-3 0:00:0 PW No Violations 0.50
000PL12974 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0139506924 2015-06-08 Production Wells No Violations I was on location for a follow-up inspection. During my inspection, I found Kleese has moved the tank battery to the new location closer to Rt. 18. I observed the distance between 100 barrel production tank and the mechanical separator did not meet the spacing requirements per 1501:9-9-05(A)(5). A new dike has been constructed around the tank battery. An identification sing is posted on the tank. I called and spoke with Matt Kleese. I instructed Mr. Kleese to correct the spacing between the 100 barrel tank and separator.
0219050687 2015-05-06 Production Wells No Violations I was on location to inspect the proposed new location for the tank battery. I met with Matt Kleese, manager of KDA, Lance Martinez, field supervisor for KDA, and Cole Kurtz, employee for Diamond Well Service. According to Mr. Kleese, the company Steel Products wants to build a new drive along the east side of their building to access an existing garage entrance and the current location of the tank battery blocks that project. Mr. Kleeses proposed new location will be south towards Mahoning Avenue and next to a sales meter on the adjacent property owned by Acme Trucking. Mr. Kleese stated he has obtained signed documentation permitting KDA to build the new tank battery. During my inspection, I found the new proposed site to be an open lot. The topography is fairly flat with no distinguished slope. I instructed Mr. Kleese that the new tank battery must meet all requirements under OAC 1501:9-9-05. Jackson township is non-urban. A new gps coordinate has been obtained. Mr. Kleese stated Mr. Martinez will manage the construction of the new tank battery. Follow-up inspections will continue until the new tank battery is complete.
0984391039 2004-03-03 Production Wells No Violations The tank battery consists of 1-100 bbl storage tank, 1-separator and a dike.
1749297797 2015-06-10 Production Wells No Violations I was on location for a follow-up inspection. During my inspection, I found Kleese has corrected the spacing between the 100 barrel production tank and separator per my request.
1805754084 2013-11-21 Production Wells No Violations I performed a status check on the above location. The tank battery is equipped with one 100 barrel tank and one horizontal separators. The well is equipped with 1.5 tubing. ID signs are posted no noted violations at this time.
1913290717 2007-08-02 Production Wells No Violations I performed a random well inspection. GPSd both the well and tank battery. ID sign posted. Tank battery in good shape. There were no violations at this time.
PL12974 PL No Violations

For data sources see[9]

References