If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-099-22416 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.04,"lon":-80.71,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Mahoning | |
| Municipality: Boardman Township | |
| Operator Name: EVERFLOW EASTERN PARTNERS LP | |
| Well Pad ID: | |
| Farm/Lease Name: MANGINELLI UNIT | |
| License Status: Producing | |
| License Date: 1990-06-20 | |
| Spud Date: 1990-07-10 | |
| Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
| Final Drill Date: 1990-07-15 | |
| Well Total Depth: 5554.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.040000 | |
| Longitude: -80.710000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1990-06-20 | 84 EVERFLOW EASTERN PTNS L P GeoDate 6/20/90 |
| Oil and Gas | 1990-06-20 | Issued Date 6/20/90 Expired Date 6/20/91 Acres 0086460 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05554 Proposed Drill Depth 05554 |
| Original Spud | 1990-07-10 | |
| Completed | 1990-07-15 | |
| Reached Total Depth | 1990-07-15 | |
| Completion Report Received | 1990-07-23 | |
| Construction Permit Expires | 1991-06-20 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 5298 | 5413 | 0 |
| 5298 | 5413 | 0 | |
| 2006-09-11 | 5388 | 5412 | 50 |
| 5388 | 5412 | 50 | |
| 5298 | 5413 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 120000 Gal | 80000 | FRAC:WATER/SAND |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -240662508 | 2009-9-10 0:00: | PW | No Violations | |
| 0000020039 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 5/6/92 INSPECTOR BRETT FARNSWORTH DATE 05/0619/92 DATA FROM OLD VAX INFO | |
| 000PL12447 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 0240662508 | 2009-09-10 | Production Wells | No Violations | I GPSd both the wellhead and the tank battery for the first time. I continued my walk around the tank battery and the wellhead and found that there were no violations at this time. |
| 20039 | PL | No Violations | ||
| PL12447 | PL | No Violations |
For data sources see[9]