If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22601 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.05,"lon":-80.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Boardman Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: LOCKWOOD METHODIST UNIT | |
License Status: Producing | |
License Date: 1993-10-04 | |
Spud Date: 1993-11-18 | |
Spud Drilling Contractor: J & J DIRECTIONAL SERVICE | |
Final Drill Date: 1993-12-05 | |
Well Total Depth: 6236.00 ft | |
Configuration: Directional | |
Latitude: 41.050000 | |
Longitude: -80.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1993-10-04 | 84 EVERFLOW EASTERN PTNS L P GeoDate 10/4/93 |
Oil and Gas | 1993-10-04 | Issued Date 10/4/93 Expired Date 10/4/94 Acres 0055550 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 06236 Proposed Drill Depth 06236 |
Original Spud | 1993-11-18 | CHG FTG/ACREAGE 9/17/94 |
Completed | 1993-12-05 | CHG FTG/ACREAGE 9/17/94 |
Reached Total Depth | 1993-12-05 | CHG FTG/ACREAGE 9/17/94 |
Completion Report Received | 1994-01-12 | CHG FTG/ACREAGE 9/17/94 |
Construction Permit Expires | 1994-10-04 | CHG FTG/ACREAGE 9/17/94 |
Record Last Modified | 2017-02-15 | CHG FTG/ACREAGE 9/17/94 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5950 | 6035 | 0 |
5950 | 6035 | 0 | |
2006-09-11 | 5951 | 6033 | 66 |
5951 | 6033 | 66 | |
5950 | 6035 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 122000 Gal | 80000 | FRAC W/122M GAL H20 & 80M# SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1888026093 | 2009-03-31 | Production Wells | No Violations | I performed a random field inspection. I GPSd both the wellhead and the tank battery for the first time. I continued my walk around both the tank battery and the wellhead and found both to be in good shape. Both ID signs were posted. There were no violations at this time. |
iDIAN00213 | 1999-07-27 | Preliminary Restoration | No Violations | |
iDIAN002136 | 1999-7-27 0:00: | PL | No Violations |
For data sources see[9]