If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22621 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02,"lon":-80.83,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Ellsworth Township | |
Operator Name: J WELL SERVICE INC | |
Well Pad ID: | |
Farm/Lease Name: MISIAK | |
License Status: Producing | |
License Date: 2003-09-19 | |
Spud Date: 1994-02-23 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1994-03-01 | |
Well Total Depth: 5231.00 ft | |
Configuration: Vertical | |
Latitude: 41.020000 | |
Longitude: -80.830000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1994-02-23 | 2651 D & L ENERGY INC GeoDate 2/23/94 |
Oil and Gas | 1994-02-23 | Issued Date 2/23/94 Expired Date 2/23/95 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05231 Proposed Drill Depth 05231 |
Original Spud | 1994-02-25 | |
Completed | 1994-03-01 | |
Reached Total Depth | 1994-03-01 | |
Completion Report Received | 1994-08-22 | |
APP | 2003-09-19 | Proposed Formations:ORISKANY, Issued Date:9/19/2003, Expired Date:9/18/2004 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EOUT |
Construction Permit Expires | 2004-09-18 | |
Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5001 | 5144 | 0 |
5001 | 5144 | 0 | |
2006-09-11 | 5028 | 5140 | 51 |
5028 | 5140 | 51 | |
5001 | 5144 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 180 Mscf | 0 | |||
H2O | 0 | 106000 Gal | 0 | INSTANT SHUT-IN 1036, SHUT-IN 895 | ||
ACID | 8 | 500 Gal | 65500 | FRAC W/106M GAL WATER,655 SX SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | D & L ENERGY INC | 12412.00 | 167.00 | 244 |
1995 | D & L ENERGY INC | 17642.00 | 115.00 | 365 |
1996 | D & L ENERGY INC | 12267.00 | 57.00 | 365 |
1997 | D & L ENERGY INC | 9486.00 | 47.00 | 365 |
1998 | D & L ENERGY INC | 7301.00 | 0.00 | 365 |
1999 | D & L ENERGY INC | 6775.00 | 56.00 | 365 |
2000 | D & L ENERGY INC | 6706.00 | 0.00 | 365 |
2001 | D & L ENERGY INC | 3036.00 | 0.00 | 365 |
2002 | D & L ENERGY INC | 3807.00 | 22.00 | 365 |
2003 | D & L ENERGY INC | 1028.00 | 0.00 | 365 |
2004 | D & L ENERGY INC | 1774.00 | 37.00 | 365 |
2005 | D & L ENERGY INC | 3504.00 | 0.00 | 365 |
2006 | D & L ENERGY INC | 2399.00 | 0.00 | 365 |
2007 | D & L ENERGY INC | 2721.00 | 43.00 | 365 |
2008 | D & L ENERGY INC | 2136.00 | 30.00 | 215 |
2009 | D & L ENERGY INC | 2933.00 | 0.00 | 365 |
2010 | D & L ENERGY INC | 1832.00 | 0.00 | 365 |
2011 | D & L ENERGY INC | 1074.00 | 0.00 | 0 |
2012 | D & L ENERGY INC | 1452.00 | 0.00 | 365 |
2013 | D & L ENERGY INC | 1215.00 | 0.00 | 289 |
2014 | D & L ENERGY INC | 1323.00 | 0.00 | 309 |
2015 | BOBCAT WELL & PIPELINE LLC | 132.00 | 0.00 | 119 |
2016 | BOBCAT WELL & PIPELINE LLC | 34.00 | 0.00 | 6 |
2017 | BOBCAT WELL & PIPELINE LLC | 0.00 | 13.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | D & L ENERGY INC | Brine | 383 | 244 |
1995 | D & L ENERGY INC | Brine | 104 | 365 |
1996 | D & L ENERGY INC | Brine | 227 | 365 |
1997 | D & L ENERGY INC | Brine | 174 | 365 |
1998 | D & L ENERGY INC | Brine | 169 | 365 |
1999 | D & L ENERGY INC | Brine | 134 | 365 |
2000 | D & L ENERGY INC | Brine | 179 | 365 |
2001 | D & L ENERGY INC | Brine | 37 | 365 |
2002 | D & L ENERGY INC | Brine | 226 | 365 |
2003 | D & L ENERGY INC | Brine | 126 | 365 |
2004 | D & L ENERGY INC | Brine | 490 | 365 |
2005 | D & L ENERGY INC | Brine | 233 | 365 |
2006 | D & L ENERGY INC | Brine | 223 | 365 |
2007 | D & L ENERGY INC | Brine | 308 | 365 |
2008 | D & L ENERGY INC | Brine | 201 | 215 |
2009 | D & L ENERGY INC | Brine | 223 | 365 |
2010 | D & L ENERGY INC | Brine | 240 | 365 |
2011 | D & L ENERGY INC | Brine | 193 | |
2012 | D & L ENERGY INC | Brine | 137 | 365 |
2013 | D & L ENERGY INC | Brine | 135 | 289 |
2014 | D & L ENERGY INC | Brine | 198 | 309 |
2015 | BOBCAT WELL & PIPELINE LLC | Brine | 119 | |
2016 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 6 |
2017 | BOBCAT WELL & PIPELINE LLC | Brine | 13 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0092577645 | 2002-09-13 | Preliminary Restoration | No Violations | Meets requirements. |
1241498372 | 2018-06-19 | Production Wells | No Violations | The purpose of my inspection was to conduct a status check on well #2-2621. RBDMS indicated reported production was current. Access to the location was drivable and stable. The 8.625 was below grade. The 4.5 production casing was equipped with a plunger lift assembly. Production valves were closed. No leaks were observed. A domestic connection was present. A stable earthen dike that was free of fluid was present around the production equipment. Equipment on location consisted of one (1) horizontal separator and two (2) 100 bbl production tanks. The separator remained in good repair and contained correct identification. The tanks remained in good repair. Valves were closed and plugged. No violations were observed during this inspection. |
92577645 | 2002-9-13 0:00: | PL | No Violations | 0.50 |
For data sources see[9]