If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22839 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02,"lon":-80.72,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Canfield Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: CONWAY # 1 | |
License Status: Producing | |
License Date: 1999-10-08 | |
Spud Date: 1900-01-01 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 41.020000 | |
Longitude: -80.720000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1999-10-08 | Proposed Formations:CLINTON, Issued Date:10/8/99, Expired Date:10/7/00 6:00:00 AM, Drilling unit acres:42.0336, Proposed Well Type:OG, Proposed Well Class:POOL |
Construction Permit Expires | 2000-10-07 | |
Correction to Well | 2010-01-08 | UNIT REDUCED TO 41.5736 ACRES FROM 42.03 ACRES. |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-01-19 | 5348 | 5404 | 45 |
5348 | 5404 | 45 | |
5348 | 5404 | 45 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 2861 Bbl | 80000 | 500 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | EVERFLOW EASTERN PARTNERS LP | Brine | 117 | 244 |
2001 | EVERFLOW EASTERN PARTNERS LP | Brine | 104 | 365 |
2002 | EVERFLOW EASTERN PARTNERS LP | Brine | 17 | 365 |
2003 | EVERFLOW EASTERN PARTNERS LP | Brine | 32 | 365 |
2004 | EVERFLOW EASTERN PARTNERS LP | Brine | 13 | 365 |
2005 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | Brine | 38 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | Brine | 219 | 197 |
2012 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 126 |
2013 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | Brine | 7 | 260 |
2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 1 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2133845283 | 2007-11-27 0:00 | PW | No Violations | |
-248071551 | 2018-4-25 0:00: | PW | No Violations | 0.30 |
0248071551 | 2018-04-25 | Production Wells | No Violations | The purpose of my inspection was to conduct a status check inspection on well #2-2839. Inspector John Fleming was present during the inspection. RBDMS indicated reported production was current. Access to the well and tank battery remained stable and drivable. The well head was enclosed by a board on board fence that contained correct identification. The 8.625 well head was plumbed above grade and was open to atmosphere. The 4.5 production casing was equipped with a plunger lift assembly. Production valves were in the open position. No leaks were observed. Staining consistent with a legacy operation was present. A domestic supply connection was present. The tank battery was shared with #3122. A stable earthen dike that was free of fluid was present around the production equipment. A dike drain with riser pipe was installed in the Southeast corner. A locked board on board fence that contained correct identification for both wells was present on the fence. Equipment within the dike consisted of one (1) horizontal separator and one (1) 140 bbl production tank. The separator remained in good repair and contained a current production chart. The production tank remained in good repair. Valves were closed and plugged. No violations were observed during this inspection. |
2133845283 | 2007-11-27 | Production Wells | No Violations | I preformed a random field inspection. GPSd both the wellhead and the tank battery. ID signs were posted on both locations. The tank battery was in very good shape. There were no violations at this time. |
iDIAN00457 | 2000-06-23 | Preliminary Restoration | No Violations | |
iDIAN004579 | 2000-6-23 0:00: | PL | No Violations |
For data sources see[9]