If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22938 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.03,"lon":-80.71,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Boardman Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: MAHAR UNIT | |
License Status: Producing | |
License Date: 2004-07-21 | |
Spud Date: 2004-09-29 | |
Spud Drilling Contractor: ROSE RUN DRILLING | |
Final Drill Date: 2004-10-07 | |
Well Total Depth: 6090.00 ft | |
Configuration: Directional | |
Latitude: 41.030000 | |
Longitude: -80.710000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2003-02-26 | Proposed Formations:CLINTON, Issued Date:2/26/2003, Expired Date:2/26/2004 6:00:00 AM, Drilling unit acres:53.87, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2004-07-21 | Proposed Formations:CLINTON, Issued Date:7/21/2004, Expired Date:7/21/2005 6:00:00 AM, Drilling unit acres:53.87, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2004-09-29 | RBDMS Rec |
Completed | 2004-10-07 | RBDMS Rec |
Reached Total Depth | 2004-10-07 | RBDMS Rec |
Completion Report Received | 2004-11-04 | RBDMS Rec |
Correction to Well | 2004-11-26 | CHANGE IN TARGET LOCATION: 1376'SL & 1247'WL OF GREAT LOT 5, DIVISION 4 NW; X= 2,494,565; Y= 506,446. UNIT SIZE REDUCED TO 51.89 ACRES. |
Construction Permit Expires | 2005-07-21 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2004-12-15 | 5786 | 5865 | 0 |
5786 | 5865 | 0 | |
5786 | 5865 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 8 | 2855 Bbl | 100000 | 1000 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | EVERFLOW EASTERN PARTNERS LP | 0.00 | 0.00 | 0 |
2005 | EVERFLOW EASTERN PARTNERS LP | 27553.00 | 41.00 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | 16063.00 | 0.00 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | 15089.00 | 0.00 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | 13484.00 | 54.00 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | 13934.00 | 0.00 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | 12347.00 | 0.00 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | 10732.00 | 0.00 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | 6043.00 | 0.00 | 186 |
2013 | EVERFLOW EASTERN PARTNERS LP | 6324.00 | 0.00 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | 3695.00 | 0.00 | 260 |
2015 | EVERFLOW EASTERN PARTNERS LP | 346.00 | 0.00 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | 328.00 | 0.00 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | 5598.00 | 19.00 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | 9592.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | EVERFLOW EASTERN PARTNERS LP | Brine | ||
2005 | EVERFLOW EASTERN PARTNERS LP | Brine | 184 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | Brine | 30 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | Brine | 13 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 186 |
2013 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 260 |
2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1771291578 | 2010-10-13 0:00 | PW | No Violations | |
-714745704 | 2005-9-29 0:00: | PL | No Violations | 0.50 |
0238465586 | 2004-10-15 | Preliminary Restoration | No Violations | The pits are closed. Partial copmpliance with the preliminary restoration requirements. |
0714745704 | 2005-09-29 | Preliminary Restoration | No Violations | Meets requirements for preliminary restoration. |
0830448313 | 2004-10-01 | Drill / Deepen / Reopen | No Violations | Surface job. |
1771291578 | 2010-10-13 | Production Wells | No Violations | I performed a random field inspection. I GPSd both the tank battery and the wellhead. I continued to walk around both the wellhead and the tank battery. This inspection satisfies 1501:9-9-05. There were no violations at this time. |
238465586 | 2004-10-15 0:00 | PL | No Violations | 0.50 |
830448313 | 2004-10-1 0:00: | DD | No Violations | 5.00 |
For data sources see[9]