If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22956 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9,"lon":-81.06,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Columbiana | |
Municipality: Knox Township | |
Operator Name: C & T ENERGY OF EAST CANTON IN | |
Well Pad ID: | |
Farm/Lease Name: OYSTER UNIT | |
License Status: Producing | |
License Date: 2003-09-22 | |
Spud Date: 2003-09-30 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2003-10-06 | |
Well Total Depth: 5290.00 ft | |
Configuration: Vertical | |
Latitude: 40.900000 | |
Longitude: -81.060000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2003-09-22 | 4969 C & T ENTERPRISES Proposed Formation CLINTON Issued Date 9/22/2003 Expired Date 9/21/2004 6:00:00 AM |
Inspector Comments Cement Job | 2003-09-30 | Surface hole drilled on air. Cement did not circulate to the surface. The rig crew is to fill the annulus from the top with dry cement.Cement Ticket Notes Inspector Reporting PATRICK JONNIE |
Original Spud | 2003-09-30 | RBDMS Rec |
Completed | 2003-10-06 | RBDMS Rec |
Reached Total Depth | 2003-10-06 | RBDMS Rec |
Completion Report Received | 2003-12-08 | RBDMS Rec |
Construction Permit Expires | 2004-09-21 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2004-01-28 | 5068 | 5177 | 71 |
5068 | 5177 | 71 | |
5068 | 5177 | 71 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 120000 Gal | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | C & T ENERGY OF EAST CANTON IN | 1000.00 | 240.00 | 34 |
2004 | C & T ENERGY OF EAST CANTON IN | 8908.00 | 402.00 | 365 |
2005 | C & T ENERGY OF EAST CANTON IN | 7073.00 | 134.00 | 365 |
2006 | C & T ENERGY OF EAST CANTON IN | 5868.00 | 94.00 | 365 |
2007 | C & T ENERGY OF EAST CANTON IN | 4316.00 | 115.00 | 365 |
2008 | C & T ENERGY OF EAST CANTON IN | 3792.00 | 52.00 | 365 |
2009 | C & T ENERGY OF EAST CANTON IN | 4377.00 | 68.00 | 365 |
2010 | C & T ENERGY OF EAST CANTON IN | 4775.00 | 61.00 | 365 |
2011 | C & T ENERGY OF EAST CANTON IN | 3699.00 | 31.00 | 0 |
2012 | C & T ENERGY OF EAST CANTON IN | 3338.00 | 27.00 | 366 |
2013 | C & T ENERGY OF EAST CANTON IN | 3003.00 | 31.00 | 365 |
2014 | C & T ENERGY OF EAST CANTON IN | 2440.00 | 0.00 | 365 |
2015 | C & T ENERGY OF EAST CANTON IN | 2386.00 | 0.00 | 365 |
2016 | C & T ENERGY OF EAST CANTON IN | 2862.00 | 56.00 | 365 |
2017 | C & T ENERGY OF EAST CANTON IN | 2933.00 | 50.00 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | 2694.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | C & T ENERGY OF EAST CANTON IN | Brine | 595 | 34 |
2004 | C & T ENERGY OF EAST CANTON IN | Brine | 228 | 365 |
2005 | C & T ENERGY OF EAST CANTON IN | Brine | 52 | 365 |
2006 | C & T ENERGY OF EAST CANTON IN | Brine | 67 | 365 |
2007 | C & T ENERGY OF EAST CANTON IN | Brine | 98 | 365 |
2008 | C & T ENERGY OF EAST CANTON IN | Brine | 35 | 365 |
2009 | C & T ENERGY OF EAST CANTON IN | Brine | 25 | 365 |
2010 | C & T ENERGY OF EAST CANTON IN | Brine | 35 | 365 |
2011 | C & T ENERGY OF EAST CANTON IN | Brine | 18 | |
2012 | C & T ENERGY OF EAST CANTON IN | Brine | 30 | 366 |
2013 | C & T ENERGY OF EAST CANTON IN | Brine | 18 | 365 |
2014 | C & T ENERGY OF EAST CANTON IN | Brine | 0 | 365 |
2015 | C & T ENERGY OF EAST CANTON IN | Brine | 21 | 365 |
2016 | C & T ENERGY OF EAST CANTON IN | Brine | 8 | 365 |
2017 | C & T ENERGY OF EAST CANTON IN | Brine | 38 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-569127477 | 2003-12-13 0:00 | DD | No Violations | 4.00 |
-574749619 | 2006-5-4 0:00:0 | PL | No Violations | 0.50 |
0569127477 | 2003-12-13 | Drill / Deepen / Reopen | No Violations | On site for the surface casing cement job. Universal on site thawing out frozen valves. Due to problems with the conductor hole ran one joint of hose down the outside of the conductor and cemented with 80 sacks of cement. Then ran fresh water ahead of gell to establish circulation (20 bbls). No circulation. Mixed gell and cement and displaced. Well circulated during displacement. Cement returned to the surface. |
0574749619 | 2006-05-04 | Preliminary Restoration | No Violations | The tank battery is shared with permit 2473 and consists of 2-210 bbl storage tanks, 1-100 bbl storage tank, 1-1500 gallon plastic salt water tank, 2-separators and a dike. Meets requirements for preliminary restoration. |
1243604111 | 2009-05-28 | Production Wells | No Violations | I walked around the tank battery and the wellhead and found no violations at this time. |
For data sources see[9]