If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22986 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02,"lon":-80.67,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Boardman Township | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: WBA UNIT | |
License Status: Producing | |
License Date: 2005-07-15 | |
Spud Date: 2005-08-11 | |
Spud Drilling Contractor: LANDOGS DRILLING | |
Final Drill Date: 2005-08-19 | |
Well Total Depth: 6098.00 ft | |
Configuration: Directional | |
Latitude: 41.020000 | |
Longitude: -80.670000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-07-15 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:7/15/2005, Expired Date:7/15/2006 6:00:00 AM, Drilling unit acres:49.45, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2005-07-15 | TARGET INFORMATION: 280'SL & 240'WL OF LOT 1-3-5, DIVISION 2 (S); X= 2,504,425; Y= 500,715; ELEV= 1055'. |
Original Spud | 2005-08-11 | RBDMS Rec |
Completed | 2005-08-19 | RBDMS Rec |
Reached Total Depth | 2005-08-19 | RBDMS Rec |
Completion Report Received | 2005-10-06 | RBDMS Rec |
Correction to Well | 2005-10-21 | UNIT SIZE INCREASED TO 50.03 ACRES. CORRECTION TO TARGET LOCATION: 695'SL & 220'WL OF LOTS 1-3-5, 2ND DIVISION; X= 2,504,470; Y= 500,695. |
Construction Permit Expires | 2006-07-15 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2005-12-06 | 5848 | 5963 | 0 |
5848 | 5963 | 0 | |
5848 | 5963 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 2766 Bbl | 80000 | 1000 GALLONS IC ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | OHIO VALLEY ENERGY SYSTEMS COR | 22281.00 | 454.00 | 345 |
2007 | OHIO VALLEY ENERGY SYSTEMS COR | 20788.00 | 208.00 | 364 |
2008 | OHIO VALLEY ENERGY SYSTEMS COR | 24700.00 | 135.00 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | 20144.00 | 50.00 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | 18775.00 | 0.00 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 15839.00 | 69.00 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 10960.00 | 0.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 8417.00 | 0.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 8397.00 | 0.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 8454.00 | 0.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 7838.00 | 0.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 6971.00 | 0.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 6531.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 345 |
2007 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 230 | 364 |
2008 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 20 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 73 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 68 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 42 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 17 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 21 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-228820011 | 2005-8-13 0:00: | DD | No Violations | 3.00 |
-946922532 | 2007-4-10 0:00: | PL | No Violations | |
-947167378 | 2005-8-25 0:00: | PL | No Violations | 0.50 |
0228820011 | 2005-08-13 | Drill / Deepen / Reopen | No Violations | Arrived for a B.O.P. Test. Tested at 550psi. After 15 minutes 390 psi. Tested at 700 psi. After fifteen minutes 690 psi. |
0247429643 | 2005-08-12 | Drill / Deepen / Reopen | No Violations | Drilling at 295. Expect surface this evening. |
0946922532 | 2007-04-10 | Preliminary Restoration | No Violations | GPSd the wellhead and tank battery. The drilling pits were filled in. Vegetation was growing on the location. No erosion was visible. No drilling equipment on location. This well and tank battery has passed the preliminary restoration. |
0947167378 | 2005-08-25 | Preliminary Restoration | No Violations | Met with Tom Tugend to check the progress of pit closures. Emptying the pits at this time. |
1124107172 | 2005-08-12 | Drill / Deepen / Reopen | No Violations | Arrived on site for the surface job. Ran pipe and cemented in. Cement stayed up. |
1128346839 | 2005-09-29 | Preliminary Restoration | No Violations | The pits are closed. Building the tank battery. Partial compliance. |
1524844523 | 2018-04-25 | Production Wells | No Violations | The purpose of my inspection was to conduct a status check inspection on well #2-2986. Inspector John Fleming was present during the inspection. RBDMS indicated reported production was current. Access to the well and tank battery remained stable and drivable. The well head was enclosed by a locked chain-link fence enclosure with green plastic privacy shielding. Correct identification was present on the fence. The 8.625 well head was at grade. The production annulus was plumbed into the sales line. The 4.5 production casing was equipped with a plunger lift assembly. Production valves were in the open position. No leaks were observed. The tank battery was shared with #2374, 2823 and 2979. A stable earthen dike that was free of fluid was present around the production equipment. A locked chain-link fence enclosure with green plastic privacy shielding that contained correct identification for all wells produced into the battery was present on the fence. Equipment within the dike consisted of four (4) horizontal separators, one (1) 140 bbl production tank, one (1) 50 bbl brine tank and one (1) 50 bbl production tank. The separator for 2986 remained in good repair and contained a current production chart. Production was shut in at the time of inspection. The production tank exhibited signs of corrosion and production fluid was staining the body of the tank. The fluid was not live or mobile. The tank was vented into a charcoal filter. The hatch lid was secured. A lightening arrestor was in place. Valves were closed and plugged. The brine tank remained in good repair. I will contact the operator to discuss the status of the production tank. |
247429643 | 2005-8-12 0:00: | DD | No Violations | 1.50 |
For data sources see[9]