If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-099-22990 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.03,"lon":-80.68,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Mahoning | |
| Municipality: Boardman Township | |
| Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
| Well Pad ID: | |
| Farm/Lease Name: JACOBS-NEIHEISEL UNIT | |
| License Status: Producing | |
| License Date: 2005-08-08 | |
| Spud Date: 2005-09-01 | |
| Spud Drilling Contractor: LANDOGS DRILLING | |
| Final Drill Date: 2005-09-13 | |
| Well Total Depth: 5953.00 ft | |
| Configuration: Directional | |
| Latitude: 41.030000 | |
| Longitude: -80.680000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2005-08-08 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:8/8/2005, Expired Date:8/8/2006 6:00:00 AM, Drilling unit acres:94.68, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2005-09-01 | RBDMS Rec |
| Completed | 2005-09-13 | RBDMS Rec |
| Reached Total Depth | 2005-09-13 | RBDMS Rec |
| Completion Report Received | 2005-12-06 | RBDMS Rec |
| Construction Permit Expires | 2006-08-08 | RBDMS Rec |
| Correction to Well | 2007-07-27 | CHANGE IN TARGET INFORMATION: FOOTAGE= 660'SL & 1890'WL OF LOT 8, DIV. 4 (NW); X= 2,500,550; Y= 503,185; UNIT SIZE INCREASED TO 95.90 ACRES. |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-01-30 | 5680 | 5740 | 0 |
| 5680 | 5740 | 0 | |
| 5680 | 5740 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 8 | 2762 Bbl | 80000 | 1000 GALLONS IC ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2005 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 0.00 | 0 |
| 2006 | OHIO VALLEY ENERGY SYSTEMS COR | 17920.00 | 0.00 | 336 |
| 2007 | OHIO VALLEY ENERGY SYSTEMS COR | 30519.00 | 0.00 | 364 |
| 2008 | OHIO VALLEY ENERGY SYSTEMS COR | 40009.00 | 0.00 | 365 |
| 2009 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 0.00 | 0 |
| 2010 | OHIO VALLEY ENERGY SYSTEMS COR | 25003.00 | 0.00 | 365 |
| 2011 | OHIO VALLEY ENERGY SYSTEMS COR | 22022.00 | 0.00 | 365 |
| 2012 | OHIO VALLEY ENERGY SYSTEMS COR | 19826.00 | 0.00 | 366 |
| 2013 | OHIO VALLEY ENERGY SYSTEMS COR | 19063.00 | 0.00 | 365 |
| 2014 | OHIO VALLEY ENERGY SYSTEMS COR | 16108.00 | 0.00 | 365 |
| 2015 | OHIO VALLEY ENERGY SYSTEMS COR | 12776.00 | 0.00 | 365 |
| 2016 | OHIO VALLEY ENERGY SYSTEMS COR | 13879.00 | 0.00 | 365 |
| 2017 | OHIO VALLEY ENERGY SYSTEMS COR | 12288.00 | 25.00 | 365 |
| 2018 | OHIO VALLEY ENERGY SYSTEMS COR | 10314.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2005 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 0 |
| 2006 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 336 |
| 2007 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 364 |
| 2008 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 97 | 365 |
| 2009 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 30 | 0 |
| 2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 18 | 365 |
| 2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 55 | 365 |
| 2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 45 | 366 |
| 2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 35 | 365 |
| 2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 65 | 365 |
| 2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
| 2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
| 2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 39 | 365 |
| 2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1355172755 | 2005-9-7 0:00:0 | DD | No Violations | 2.00 |
| -1658557073 | 2005-8-31 0:00: | DD | No Violations | 1.50 |
| -169519766 | 2007-4-11 0:00: | PL | No Violations | |
| 0084881114 | 2000-09-29 | Preliminary Restoration | No Violations | There remains one pit to close. |
| 0169519766 | 2007-04-11 | Preliminary Restoration | No Violations | GPSd the wellhead and tank battery. The drilling pits were filled. No drilling equipment on location. Pine trees around the tank battery. ID signs posted. No erosion was visible. This well and tank battery has passed the preliminary restoration. |
| 0398893351 | 2018-04-17 | Production Wells | No Violations | The purpose of my inspection was to conduct a status check on well #2-2990. RBDMS indicated reported production was current. Access to the well and tank battery was stable through a residential yard. No defined lease road was present. The well head was enclosed by a locked chain link fence that contained correct identification. The 8.625 well head was below grade. The 4.5 production casing was equipped with a plunger lift assembly. Production valves were in the open position. No leaks were observed. The tank battery was shared with 2-2991. The production equipment was positioned inside of a stable earthen dike that was free of fluid. A locked chain link fence that contained correct identification for all wells produced into the battery was posted on the fence. Mature evergreen trees were growing around the battery to provide screening. Equipment on location consisted of one (1) horizontal separator, one (1) 140 bbl steel production tank and one (1) 50 bbl poly brine tank. I did not have a key to access the interior of the battery. The separator remained in good repair. The steel production tank remained in good repair. Valves were closed and plugged. The hatch lid was closed. A charcoal filter was present. The poly tank remained in good repair and contained a de minimis volume of fluid. Valves were closed and plugged. No violations were observed during this inspection. |
| 0420664732 | 2005-09-06 | Drill / Deepen / Reopen | No Violations | Arrived for the surface job. Ran pipe. |
| 1355172755 | 2005-09-07 | Drill / Deepen / Reopen | No Violations | Finnish the surface job from Midnight to 2:00 am. |
| 1602135338 | 2005-09-07 | Drill / Deepen / Reopen | No Violations | Arrived for the B.O.P. test. Two tries but passed. Tested at 480 psi. |
| 1658557073 | 2005-08-31 | Drill / Deepen / Reopen | No Violations | The rig is preparing to move onto the well at this time. The drilling pits are shared with pemit 2991. |
| 398893351 | 2018-4-17 0:00: | PW | No Violations | 0.40 |
| 420664732 | 2005-9-6 0:00:0 | DD | No Violations | 3.50 |
| 84881114 | 2000-9-29 0:00: | PL | No Violations | 0.50 |
For data sources see[9]