If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22999 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9,"lon":-81.06,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Columbiana | |
Municipality: Knox Township | |
Operator Name: C & T ENERGY OF EAST CANTON IN | |
Well Pad ID: | |
Farm/Lease Name: WEYER WORLD LTD | |
License Status: Producing | |
License Date: 2005-09-26 | |
Spud Date: 2005-09-28 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2005-10-04 | |
Well Total Depth: 5304.00 ft | |
Configuration: Vertical | |
Latitude: 40.900000 | |
Longitude: -81.060000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-09-26 | Proposed Formations:CLINTON, Issued Date:9/26/2005, Expired Date:9/26/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2005-09-28 | RBDMS Rec |
Completed | 2005-10-04 | RBDMS Rec |
Reached Total Depth | 2005-10-04 | RBDMS Rec |
Completion Report Received | 2005-12-02 | RBDMS Rec |
Construction Permit Expires | 2006-09-26 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-01-30 | 5069 | 5177 | 81 |
5069 | 5177 | 81 | |
5069 | 5177 | 81 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 120000 Gal | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | C & T ENERGY OF EAST CANTON IN | 0.00 | 297.00 | 45 |
2007 | C & T ENERGY OF EAST CANTON IN | 10636.00 | 275.00 | 365 |
2008 | C & T ENERGY OF EAST CANTON IN | 10117.00 | 107.00 | 365 |
2009 | C & T ENERGY OF EAST CANTON IN | 8473.00 | 112.00 | 365 |
2010 | C & T ENERGY OF EAST CANTON IN | 8712.00 | 93.00 | 365 |
2011 | C & T ENERGY OF EAST CANTON IN | 8882.00 | 55.00 | 0 |
2012 | C & T ENERGY OF EAST CANTON IN | 8453.00 | 41.00 | 366 |
2013 | C & T ENERGY OF EAST CANTON IN | 6594.00 | 46.00 | 365 |
2014 | C & T ENERGY OF EAST CANTON IN | 7687.00 | 34.00 | 365 |
2015 | C & T ENERGY OF EAST CANTON IN | 7275.00 | 0.00 | 365 |
2016 | C & T ENERGY OF EAST CANTON IN | 5304.00 | 15.00 | 365 |
2017 | C & T ENERGY OF EAST CANTON IN | 5783.00 | 63.00 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | 5755.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | C & T ENERGY OF EAST CANTON IN | Brine | 2559 | 45 |
2007 | C & T ENERGY OF EAST CANTON IN | Brine | 120 | 365 |
2008 | C & T ENERGY OF EAST CANTON IN | Brine | 70 | 365 |
2009 | C & T ENERGY OF EAST CANTON IN | Brine | 110 | 365 |
2010 | C & T ENERGY OF EAST CANTON IN | Brine | 70 | 365 |
2011 | C & T ENERGY OF EAST CANTON IN | Brine | 35 | |
2012 | C & T ENERGY OF EAST CANTON IN | Brine | 60 | 366 |
2013 | C & T ENERGY OF EAST CANTON IN | Brine | 35 | 365 |
2014 | C & T ENERGY OF EAST CANTON IN | Brine | 40 | 365 |
2015 | C & T ENERGY OF EAST CANTON IN | Brine | 0 | 365 |
2016 | C & T ENERGY OF EAST CANTON IN | Brine | 50 | 365 |
2017 | C & T ENERGY OF EAST CANTON IN | Brine | 35 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1127993383 | 2005-09-28 | Drill / Deepen / Reopen | No Violations | Advent Drilling moving in this date. |
1175710421 | 2007-04-04 | Preliminary Restoration | No Violations | GPS wellhead and tank battery. The drilling pits were filled in. Vegetation was growing on the location. No erosion was visible. No drilling equipment on location. This well and tank battery has passed the preliminary restoration. |
2089421711 | 2005-09-30 | Drill / Deepen / Reopen | No Violations | Arrived on site for the surface job. Surface hole drilled on fresh water due to artesian water flow below the conductor. The cement job sealed the flow. |
For data sources see[9]