X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23002

Well Details

Well ID: 34-099-23002
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Butler Township
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: CHUMNEY
License Status: Producing
License Date: 2006-06-16
Spud Date: 2006-12-17
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2006-12-21
Well Total Depth: 5921.00 ft
Configuration: Vertical
Latitude: 40.900000
Longitude: -80.920000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-06-16 Proposed Formations:CLINTON, Issued Date:6/16/2006, Expired Date:6/16/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2006-12-21 RBDMS Rec
Reached Total Depth 2006-12-21 RBDMS Rec
Completion Report Received 2007-05-02 RBDMS Rec
Construction Permit Expires 2007-06-16 RBDMS Rec
Change of Owner 2019-02-26 Operator changed from 2816, P & S ENERGY INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2019-02-26 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2007-08-26 5622 5711 57
5622 5711 57
5622 5711 57

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 7 3246 Bbl 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 P & S ENERGY INC 0.00 342.00 31
2008 P & S ENERGY INC 2655.00 1734.00 365
2009 P & S ENERGY INC 2274.00 1349.00 365
2010 P & S ENERGY INC 1768.00 1003.00 365
2011 P & S ENERGY INC 1401.00 698.00 365
2012 P & S ENERGY INC 1148.00 694.00 366
2013 P & S ENERGY INC 1028.00 529.00 365
2014 P & S ENERGY INC 1233.00 621.00 365
2015 P & S ENERGY INC 1284.00 488.00 365
2016 P & S ENERGY INC 1177.00 619.00 365
2017 P & S ENERGY INC 1296.00 485.00 365
2018 P & S ENERGY INC 875.00 347.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 P & S ENERGY INC Brine 0 31
2008 P & S ENERGY INC Brine 568 365
2009 P & S ENERGY INC Brine 212 365
2010 P & S ENERGY INC Brine 152 365
2011 P & S ENERGY INC Brine 71 365
2012 P & S ENERGY INC Brine 70 366
2013 P & S ENERGY INC Brine 100 365
2014 P & S ENERGY INC Brine 75 365
2015 P & S ENERGY INC Brine 75 365
2016 P & S ENERGY INC Brine 70 365
2017 P & S ENERGY INC Brine 70 365
2018 P & S ENERGY INC Brine 41 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-727836078 2006-12-20 0:00 DD No Violations
0727836078 2006-12-20 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead and should TD sometime Friday. The pits are lined and in good condition. I asked the evening tour driller to dam off the ditch between the wellhead and the shale pit in order to prevent this pit from draining back onto the location.
1241547117 2009-05-04 Preliminary Restoration No Violations I performed a preliminary restoration status check. I GPSd both the tank battery and the wellhead for the first time. The drilling rig and the debris are gone. The pits are closed. Good vegetation is growing. The ID sign is posted. This well PASSES PRELIMINARY RESTORATION.

For data sources see[9]

References