X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23087

Well Details

Well ID: 34-099-23087
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: DORFMAN PRODUCTION COMPANY
Well Pad ID:
Farm/Lease Name: COPELAND OAKS
License Status: Producing
License Date: 2008-07-03
Spud Date: 2008-08-04
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 2008-08-10
Well Total Depth: 5350.00 ft
Configuration: Vertical
Latitude: 40.910000
Longitude: -81.020000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-07-03 Proposed Formations:CLINTON, Issued Date:7/3/2008, Expired Date:7/3/2009 6:00:00 AM, Drilling unit acres:76.31, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-08-10
Completion Report Received 2008-09-16
Construction Permit Expires 2009-07-03
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-10-28 5180 5283 74
5180 5283 74
5180 5283 74

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 222000 Gal 150000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 DORFMAN PRODUCTION COMPANY 7988.00 791.00 109
2009 DORFMAN PRODUCTION COMPANY 11526.00 761.00 365
2010 DORFMAN PRODUCTION COMPANY 7991.00 540.00 365
2011 DORFMAN PRODUCTION COMPANY 6740.00 448.00 365
2012 DORFMAN PRODUCTION COMPANY 5696.00 391.00 366
2013 DORFMAN PRODUCTION COMPANY 5870.00 356.00 365
2014 DORFMAN PRODUCTION COMPANY 5588.00 326.00 365
2015 DORFMAN PRODUCTION COMPANY 5156.00 290.00 365
2016 DORFMAN PRODUCTION COMPANY 2770.00 283.00 365
2017 DORFMAN PRODUCTION COMPANY 2781.00 228.00 365
2018 DORFMAN PRODUCTION COMPANY 2945.00 236.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 DORFMAN PRODUCTION COMPANY Brine 2760 109
2009 DORFMAN PRODUCTION COMPANY Brine 200 365
2010 DORFMAN PRODUCTION COMPANY Brine 53 365
2011 DORFMAN PRODUCTION COMPANY Brine 43 365
2012 DORFMAN PRODUCTION COMPANY Brine 35 366
2013 DORFMAN PRODUCTION COMPANY Brine 35 365
2014 DORFMAN PRODUCTION COMPANY Brine 35 365
2015 DORFMAN PRODUCTION COMPANY Brine 25 365
2016 DORFMAN PRODUCTION COMPANY Brine 48 365
2017 DORFMAN PRODUCTION COMPANY Brine 53 365
2018 DORFMAN PRODUCTION COMPANY Brine 48 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1128052926 2008-8-11 0:00: PL No Violations
-1187160346 2019-1-8 0:00:0 PW No Violations 1.00
0587664517 2008-10-16 Preliminary Restoration No Violations I performed a preliminary restoration status check. The drilling rig and the debris are gone. The drilling pits are closed. Vegetation is growing. This well has passed PRELIMINARY RESTORATION.
1128052926 2008-08-11 Preliminary Restoration No Violations I performed a preliminary restoration status check. The fluid level in the pits were down 3 foot. The pit liners were in good shape. The drilling equipment was gone. There was a fence around the pits. This well has not passed preliminary restoration.
1187160346 2019-01-08 Production Wells No Violations performed an inspection on the above location The tank battery is equipped with one 100 barrel tank and one horizonal separator. There is a pumping unit with an electric motor. Valves are closed and plugged. ID signs are posted. No violations at this time.
1217963621 2008-08-05 Drill / Deepen / Reopen No Violations I performed a rig inspection. I GPSd the well. The pit liners were in good shape. The ID sign was posted. The drilling depth for the surface hole was 537. There were no violations at this time.
1220987885 2008-09-09 Preliminary Restoration No Violations I preformed a preliminary restoration status check. I GPSd both the well and the tank battery. The drilling rig and the debris are gone. The pits are closed. The top soil piles are still on the location. This well has not passed preliminary restoration.
1273936248 2008-08-05 Drill / Deepen / Reopen No Violations Cemented surface casing. 716 set at 746 (KB); Petroset cemented with 250 sacks of Class A with 3% CaCl2; 12 bbls of cement returns to surface; Plug down 1430 hrs. Pits and liners are intact.
1450458435 2008-08-06 Drill / Deepen / Reopen No Violations I performed a rig inspection. The pit liners were in good shape. The fence was around the pits. The drilling depth was 1661. There were no violations at this time.
587664517 2008-10-16 0:00 PL No Violations

For data sources see[9]

References