X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23113

Well Details

Well ID: 34-099-23113
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Boardman Township
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR
Well Pad ID:
Farm/Lease Name: ESARCO-SIMON UNIT
License Status: Producing
License Date: 2009-06-11
Spud Date: 2010-01-05
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2010-01-13
Well Total Depth: 6171.00 ft
Configuration: Directional
Latitude: 41.010000
Longitude: -80.650000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-06-11 Proposed Formations:BEREA THRU MEDINA, Issued Date:6/11/2009, Expired Date:6/11/2010 6:00:00 AM, Drilling unit acres:45, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-01-13
Correction to Well 2010-04-09 CORRECTION TO TARGET INFORMATION: FOOTAGE= 825'SL & 650'WL OF LOT 8,10, 12 (2ND DIVISION); X= 2,507,540; Y= 498,190 (AS DRILLED SURVEY).
Completion Report Received 2010-04-19
Construction Permit Expires 2010-06-11
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-07-14 5834 5907 97
5834 5907 97
5834 5907 97

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 7 2667 Bbl 80000 1000 GALLONS IC ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 OHIO VALLEY ENERGY SYSTEMS COR 10358.00 0.00 154
2011 OHIO VALLEY ENERGY SYSTEMS COR 19420.00 0.00 365
2012 OHIO VALLEY ENERGY SYSTEMS COR 17841.00 0.00 366
2013 OHIO VALLEY ENERGY SYSTEMS COR 11052.00 0.00 365
2014 OHIO VALLEY ENERGY SYSTEMS COR 8365.00 0.00 365
2015 OHIO VALLEY ENERGY SYSTEMS COR 7440.00 0.00 365
2016 OHIO VALLEY ENERGY SYSTEMS COR 6712.00 0.00 365
2017 OHIO VALLEY ENERGY SYSTEMS COR 6088.00 0.00 365
2018 OHIO VALLEY ENERGY SYSTEMS COR 5315.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 OHIO VALLEY ENERGY SYSTEMS COR Brine 3140 154
2011 OHIO VALLEY ENERGY SYSTEMS COR Brine 230 365
2012 OHIO VALLEY ENERGY SYSTEMS COR Brine 75 366
2013 OHIO VALLEY ENERGY SYSTEMS COR Brine 70 365
2014 OHIO VALLEY ENERGY SYSTEMS COR Brine 63 365
2015 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 365
2016 OHIO VALLEY ENERGY SYSTEMS COR Brine 81 365
2017 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 365
2018 OHIO VALLEY ENERGY SYSTEMS COR Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-100403736 2010-4-7 0:00:0 PL No Violations
-1006270538 2010-4-23 0:00: PL No Violations
-120232363 2010-1-13 0:00: DD No Violations
-1302278152 2010-1-6 0:00:0 DD No Violations
-1580374983 2010-1-12 0:00: DD No Violations
-506545115 2010-5-11 0:00: PL No Violations
-573297927 2012-2-1 0:00:0 UP No Violations
0100403736 2010-04-07 Preliminary Restoration No Violations The top soil is spread and is rough graded in. The board on board fence around the tank battery and the wellhead are installed. This well has not passed preliminary restoration.
0120232363 2010-01-13 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig#1. The fences were up and the ID sign posted with the pre-site. The rig was in the process of running the 4 1/2 casing. The Total depth was 6171. There were no violations at this time.
0429072063 2010-01-20 Preliminary Restoration No Violations The drilling pits were solidified and closed. The cat was installing the top 3 feet with top soil. There were no violations at this time.
0506545115 2010-05-11 Preliminary Restoration No Violations There was vegetation growth on the drilling location. The ID signs were posted. The board on board fence was installed. Pine trees were placed around the tank battery. This well PASSES PRELIMINARY RESTORATION.
0573297927 2012-02-01 UrbanProduction Wells No Violations I conducted a status check on this site and found that the well head was fenced with board on board and it is equipped with a plunger lift system. The tank battery consists of one 140 barrel stock tank that is equipped with a flash arrestor and a charcoal filter, one 50 barrel brine storage tank and one separator. The thief hatch was closed and there was a bull plug installed in the draw valve. The tank battery was fenced with board on board and landscaped with shrubs. The dike was free of vegetation and debris. Proper identification was posted and I found no leaks or spills at the well head or the tank battery. I took new GPS coordinates of the well head and tank battery. No violations at this time.
0594234801 2010-01-19 Preliminary Restoration No Violations I performed a preliminary restoration status check. The drilling rig and the debris are gone. The north drilling pit was empty and the south pit was 1 foot from being empty. The dust was on the location for the pit solidification. They would start this afternoon and finish tomorrow.
1006270538 2010-04-23 Preliminary Restoration No Violations Most of the top soil was spread on the location. This well has not passed preliminary restoration.
1262807347 2010-01-05 Drill / Deepen / Reopen No Violations I performed a rig inspection. The drilling pits and the liners were in good condition. Wildcat rig #1 drilling depth was 34 and drilling on fluid. There were no violations at this time.
1262893625 2010-01-07 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The pits and pit liner were in good condition. The orange fence was around the entire location. The ID sign and a copy of the pre-site were posted. The drilling depth was 2190. They were making there first mud motor run. There were no violations at this time.
1263324253 2010-01-11 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The drilling depth was 5061. The rig was making a trip for the mud motor. The drilling pits and pit liners were in good condition. The ID sign was posted with the pre-site. The rig had a large 50 X 50 tarp over the blow line and blow pit to keep the dust down. There were no violations at this time.
1302278152 2010-01-06 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 5/8 casing. The drilling rig was Wildcat rig #1. There were no violations at this time.
1580374983 2010-01-12 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The drilling pits and pit liners were in good condition. The rig had a large tarp over the blow line and blow pit to keep the dust down. The ID sign and pre-site were posted. The drilling depth was 5535 and drilling directional hole. There were no violations at this time.
2078105241 2010-01-06 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The drilling pits and pit liners were in good condition. The orange fence was around the location. The ID sign with pre-site were posted on California Ave. The drilling depth was 772. Setting surface. There were no violations at this time.
429072063 2010-1-20 0:00: PL No Violations
594234801 2010-1-19 0:00: PL No Violations

For data sources see[9]

References