34-099-23172

Well Details

Well ID: 34-099-23172
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Ellsworth Township
Operator Name: CNX GAS COMPANY LLC
Well Pad ID: US-OH-000501
Farm/Lease Name: HENDRICKS
License Status: Plugged Back
License Date: 2011-11-14
Spud Date: 2012-05-24
Spud Drilling Contractor: NABORS DRILLING
Final Drill Date: 2012-06-30
Well Total Depth:
Configuration: Vertical
Latitude: 40.990000
Longitude: -80.820000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-11-14 Proposed Formations:POINT PLEASANT, Issued Date:11/14/2011, Expired Date:11/13/2013 12:00:00 PM, Drilling unit acres:40.79, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2012-06-30
Completion Report Received 2012-09-28
Construction Permit Expires 2013-11-13
Change of Owner 2017-11-02 Operator changed from 8441, CNX GAS COMPANY LLC to 1634, NORTHWOOD ENERGY CORP
Change of Owner 2017-11-28 Operator changed from 1634, NORTHWOOD ENERGY CORP to 8441, CNX GAS COMPANY LLC - WELL INCORECTELY LISTED ON TRANSFER PROCESSED ON 11/2/2017 THE CORRECT WELL THAT SHOULD HAVE BEEN TRANSFERRED WAS 34-099-2-3172-0100 CORRECTING TRANSFER 11/28/2017 CM.
Record Last Modified 2017-11-28

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-01-31 7919 8172 28
2013-01-31 8221 8472 28
9721 9890 32
9421 9672 30
9121 9372 30
8821 9072 30
8521 8772 30
8221 8472 28
7919 8172 28
7530 7872 44
7320 7495 28
7320 7495 28
2013-01-31 7320 7495 28
2013-01-31 7530 7872 44
2013-01-31 8521 8772 30
2013-01-31 9421 9672 30
2013-01-31 9721 9890 32
2013-01-31 8821 9072 30
2013-01-31 9121 9372 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/07/2013 01/07/2013 7,198 2,531,488

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid CWS Acid Hydrochloric Acid 7647-01-0 15.00 2.37015
DWP-111 CWS Viscosity Additive Polysaccharide Suspension NA NA 0.07466
Sand Proppant Sand NA 100.00 6.23648
DAP-903 CWS Scale Inhibitor Scale Inhibitor Trade Secret 100.00 0.01268
DWP-944 CWS Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00436
Polyethylene Glycol Mixture 25322-68-3 60.00 0.01308
DWP-690 CWS Friction Reducer Breaker Hydrogen Peroxide 7722-84-1 7.00 0.00068
DWP-NE1 CWS Non-emulsifier Diallyldimethylammonium chloride 7398-69-8 5.00 0.00113
Dimethylcocoamine, bis(chloroethyl)

ether, diquaternary ammonium salt

68607-28-3 40.00 0.00904
Methanol 67-56-1 15.00 0.00339
Isopropanol 67-63-0 40.00 0.00904
DWP-603 CWS Friction Reducer Polyethylene glycol nonylphenyl ether 9016-45-9 5.00 0.00622
Polyquaternium-33 69418-26-4 40.00 0.04974
Petroleum distillates, hydrotreated light 64742-47-8 30.00 0.03731
Ammonium Chloride 12125-02-9 1.00 0.00124
Water Carrier Water NA 100.00 91.09965
DWP-901 CWS Gel Breaker Ammonium Persulfate 7727-54-0 95.00 0.00032
DWP-204 CWS Buffer Formic Acid 64-18-6 13.00 0.00173

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CNX GAS COMPANY LLC Brine 0 92
2014 CNX GAS COMPANY LLC Brine 300 162
2015 CNX GAS COMPANY LLC Brine 0 104
2016 CNX GAS COMPANY LLC Brine 95 76
2017 NORTHWOOD ENERGY CORP Brine 823 163
2018 NORTHWOOD ENERGY CORP Brine 825 354
2019 NORTHWOOD ENERGY CORP Brine 225 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1556599608 2012-6-6 0:00:0 DD No Violations 2.00
-166204766 2015-6-17 0:00: PW No Violations 1.00
-207726443 2013-3-14 0:00: SC No Violations
-2125850884 2017-6-19 0:00: PW No Violations 1.00
-341932116 2013-2-20 0:00: DD No Violations 1.00
-355797905 2012-6-30 0:00: DD No Violations
-40714238 2019-10-28 0:00 PW No Violations 1.00
-570084470 2012-5-22 0:00: DD No Violations 3.00
-966888049 2017-1-13 0:00: PW No Violations 1.00
0076368322 2012-07-24 Drill / Deepen / Reopen No Violations Attended a pre-spud and safety meeting with CNX and Nabors Drilling Rig M62 personnel before proceeding to drill.
0166204766 2015-06-17 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one GPU and six 400 barrels tanks. Preliminary Restoration is passed.
0207726443 2013-03-14 Surface Facility Construction No Violations I was on location with inspector John Fleming. We were checked by security before we entered the site. The lease road was stable and drainage controls were in place. Operator had recently repaired the drainage along the west side of the lease road, north end with mesh and seeded the area. The well is currently shut in and being prepped for flow testing. Operator was working on the construction of the tank battery and the separator units. The two impoundments on location were fenced. Operator is planning on reclaiming the north impoundment at the time of inspection it was being pumped down. No violations on location.
0264015838 2012-06-10 Drill / Deepen / Reopen No Violations On 6/10/2012, I arrived on location at 3:45 pm. They were trying to install the float shoe on the bottom of the 20 casing, on the rig floor but kept getting cross threaded. They lowered the casing down to the pipe floor and installed it there. They started running the 20 casing and could only get 4 joint 160 in the 26 bore hole. They hooked Cal-Frac up to the casing pipe and tried to circulate down but only dropped 7 They decided to pull it back out and go in with a Tri-Cone bit and rimer and drill to 388.
0307061568 2012-06-10 Drill / Deepen / Reopen No Violations On 06/12/2012, I arrived on location at 3:45 pm. The rig crew was trying to install the float shoe on the bottom of the 20 casing, after several attempts they successfully installed the shoe and started running the 20 casing. They were able to get 4 joints ( 160 ) in the well before it stopped. They hooked up Cal Frac to circulated down the 20 casing but only dropped 7. They decided to pull casing back out and go in with a Tri-Cone bit and open up the well bore to 388.
0341932116 2013-02-20 Drill / Deepen / Reopen No Violations On 2/20/2013, I inspected the above location. At present CNX personal are setting tanks and hooking up their well head equipment. They will be doing a production test. They will call before starting.
0348757874 2013-01-03 Drill / Deepen / Reopen No Violations I was on location to inspect the containment area where Calfrac would be setting there frac equipment. All containment is in place.
0355797905 2012-06-30 Drill / Deepen / Reopen No Violations Northeast Energy Rig #10 finished drilling to a depth of 5900. Cal Frac was on location to load the 12.25 well bore with 947 barrels of fresh water mud. The well will be shut in until Nabors M-62 Drilling Rig moves on location.
0464389719 2012-06-17 Drill / Deepen / Reopen No Violations On 6/17/2012, they ran 776 of 13 3/8, 54.5 lb casing. Cal Frac circulated with fresh water, pumped 602 sacks of Class A cement with 15 barrels of returns. Plug down at 10:52 pm.
0570084470 2012-05-22 Drill / Deepen / Reopen No Violations On 5/22/2013, Express Energy moved on location to start drilling 72 cellar ring and to start drilling 30 conductor pipe.
0966888049 2017-01-13 Production Wells No Violations I performed a status check on the above location. The well is in production and is equipped with 2-7/8 tubing. There is six 300 barrel tanks that are in contaminate and one GPU on location. ID signs are posted. No noted violations at this time.
1011177634 2014-06-03 Production Wells No Violations Alex Paris is on location installing a 2 sales line that is gone to connect to Energy Resource pipeline. I performed an inspection of the location. No violations were noted at this time.
1057122039 2016-02-02 Production Wells No Violations I performed a status check on the above location. The tank battery is equipped with six 400 barrel tanks there is one GPU unit. This is a constant flow well. ID signs are posted. No noted violations at this time.
1321595457 2012-06-14 Drill / Deepen / Reopen No Violations On 6/14/2012, Cal Frac was on location, made connection to casing head, circulated 65 barrels of fresh water to surface and cemented 375 of 20 casing with 672 sacks of Class A cement with 30 barrels of returns.
1325688107 2011-12-28 Surface Facility Construction No Violations This drill site is not yet under construction. The lease road is staked out but no ground has been broken at this time.
1339763119 2012-06-14 Drill / Deepen / Reopen No Violations On 6/14/2012, Cal Frac was on location, made connection to casing head and circulated 65 barrels of fresh water to surface and cemented 375 of 20 casing good cement return to surface, plug down at 8:05 pm. See casing report.
1340022445 2012-06-17 Drill / Deepen / Reopen No Violations On 6/17/2012, the ran 776 of 13 3/8 54.5 lb casing pipe cemented to surface, good returns.
1340907511 2012-06-18 Drill / Deepen / Reopen No Violations On 6/18/2012, I meet with Adam Pauley (Assistant Drilling Engineer), and received the charts for the Blow-Out Preventor test. This test was performed on 6/17/2012.
1344450819 2012-07-28 Drill / Deepen / Reopen No Violations Halliburton on location to cement 5900 of 40# grade P-
1348241923 2012-09-20 Drill / Deepen / Reopen No Violations On 9/20/2012, I did a satus ckeck on the above location, they are in the process of filling the reserve in-ground pit with the water from the Trumble County CNX location, the frac pit has about 5 of free board, there is still some contaiment on location for the frac team when they move in. At this time there is no violation.
1358957781 2012-12-31 Drill / Deepen / Reopen No Violations I received a call from Jeramiah Alton Completions Engineer for C N X Energy, that Calfrac would be moving frac equipment on location. I inspected the location for containment, there was equipment on location removing ice and snow before the equipment could be set up. At this time there is no violations.
1359141442 2013-01-08 Drill / Deepen / Reopen No Violations On 1/8/2013, I was on location to wittiness the fracing of the 3rd stage. After the safety meeting we went to Calfracs Command Center. When everybody was in their operating areas they began to start the frac operation. The average pressure was 7796, the average barrels pumped per minute were 77 with a total of 7122 barrels were used. Job was completed.
1359647699 2013-01-24 Completion Testing No Violations On 1/23/2013, I received a phone call from Ken Cerny, Environmental Enforcement for C N X Energy informing me that they had a 120 barrel releases of flow back water into a contained area. There were vacuumed trucks on location at that time they responded with-in minutes. On 1/24/2013, I met with Ken Cerny and Andrew Sarver who were on location when this occrued. There was a plug on the manifold line that broke . The Primary containment size is 20 deep by 50 long and 40 wide. This was also setting on a larger containment pad. No release was on soil. All flow back is properly disposed of. I inspected the area and there is no violation.
1359656417 2013-01-18 Completion Testing No Violations I was on location and met with Cody Croker and Andrew Sarver That they are gone to start testing the above well, there will be a flair I instructed them to contact the Ellsworth Fire Department and myself when they start the testing.
1399903864 2014-05-06 Production Wells No Violations I performed a status check on the above location. Location is clear of drilling equipment. In-ground impoundment has been filled in. Top soil has been grader across location. At this time vegetation has not been established. ID signs are posted. Preliminary Restoration can not be passed at this time.
1419437090 2014-12-02 Production Wells No Violations I performed a status check on the above location. At present CNX has a contructor on location install a road to the master meter location. I walked the location, all containment is in place. Location is clear of debris. No noted violations at this time.
1478529040 2016-10-31 Production Wells No Violations I performed a status check on the above location. The well is in production and is equipped with 2-7/8 tubing. There is six 300 barrel tanks that are in contaminate and one GPU on location. ID signs are posted. No noted violations at this time.
1497011150 2017-06-08 Production Wells No Violations I was on location to perform a status. CNX is in the process of preparing the well to pull tubing and installing new equipment down hole. Greg Friar Consultant for CNX said they will be moving Basic Well Service rig on location Monday 6/12/2017. They will use brine to kill the well and install a blow out preventer on well head. Inspector Ken Fry will cover the job I will be on vacation that week. At this time there is no violations.
1497460824 2017-06-12 Work Over Reconditioning No Violations The purpose of my inspection was to document the status of workover operations on well #2-3172-01. At the time of my inspection the operator had shut the well in and disconnected the flow line from the well head. Correct and legible identification was present. Containment was placed around the well head. A weir tank and 500 bbl frac tank were also on location and spotted on containment. No workover rig or personnel were present. No evidence of spills or leaks were observed. No violations were observed during this inspection.
1497633299 2017-06-16 Work Over Reconditioning No Violations The purpose of my inspection was to witness workover/ well service operations on well #2-3172-01-00. A Basic Energy Snubbing Unit was on location pulling tubing from the well to install a cross over nipple to convert the well from open flow to a plunger lift assembly. Newfield consultant Greg Friar and Consol Energy Representative Ron Kinsey were on location supervising operations. Force Incorporated delivered 9.4 pound per gallon brine from Consol production wells in Noble County per Mr. Friar. An operating blow out preventer stack containing pipe rams and a blind shear was nippled up to the well head. I did not observe any spills or leaks off of containment. No violations were observed during this inspection.
1518782673 2018-02-12 Production Wells No Violations I performed a status check on the above location. The well is in production and is equipped with 2-7/8 tubing. There is six 300 barrel tanks that are in contaminate and one GPU on location. ID signs are posted. No noted violations at this time. I spoke with Chris Schofield ( 330-437-9961 ) Field Forman with Northwood Energy they have taken over the operations of this well.
1551534617 2014-06-13 Production Wells No Violations Alex Paris has move all of the equipment from location. Pettigrew Pumping will produce the well for CNX. No violations were noted at this time.
1556599608 2012-06-06 Drill / Deepen / Reopen No Violations On 6/6/2012, Northeast East Energy Rig # 10 still rigging up and setting up equipment.
1667489435 2012-05-29 Drill / Deepen / Reopen No Violations On 5/292012, Express Energy drilled 20 hole to a depth of 75 and set 74 of 16 casing. Sidley Concrete was on location with Class A grout to grout the mouse hole and top off 30. A total of 14 yards of Class A grout was used.
1673005891 2012-05-29 Drill / Deepen / Reopen No Violations On 5/29/2012, Express Energy drilled the 20 diameter mouse hole to a total depth 75 and set 74 of 16 diameter casing. Sidley Concrete was on location to grout the mouse hole and also to top off the 30 diameter conductor hole. A total of 14 yards of Class A grout was used for this job.
1931185961 2012-06-10 Drill / Deepen / Reopen No Violations On 6/10/2012, I arrived on location at 3:45pm they were trying to install the float shoe on the bottom of the 20 on the drill rig floor but it kept getting cross threated, they layed the 20 back on the pipe handler and lowered it to the ground and got the float shoe started, they started back to running the 20 and kept getting it cross threated, they were able to get 4 joints (160) connected but the 20pipe stoped gone down the 26 wellbore due to a blockage, they brought in Cal Frac and hooked up to the casing pipe and tried to circulate down the wellbore but only dropped 7, they decided to pull all pipe back out and go in with a Tri-Cone bit and open the well bore to 388.
209108310 2019-7-12 0:00: PW No Violations 1.00
2125850884 2017-06-19 Production Wells No Violations I performed an inspection on the above well. Basic Well Service has rigged down and the rig is setting on contimanint there is also one 500 barrel tank and one 500 barrel flow back tank on location. I spoke with Cody Cracker from CNX and he stated that they would be moving in a swab rig next week. At this time there is know noted violations.
264015838 2012-6-10 0:00: DD No Violations 5.00
307061568 2012-6-10 0:00: DD No Violations 6.00
348757874 2013-1-3 0:00:0 DD No Violations 1.00
464389719 2012-6-17 0:00: DD No Violations 4.00
76368322 2012-7-24 0:00: DD No Violations 1.00

For data sources see[7]

References