34-099-23174

Well Details

Well ID: 34-099-23174
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Green Township
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID: US-OH-000475
Farm/Lease Name: MAHAR 7-16-3
License Status: Not Drilled
License Date: 2011-12-21
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 40.960000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-12-21 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:12/21/2011, Expired Date:12/20/2013 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2012-01-06 CORRECTION TO X COORDINATE.
Construction Permit Expires 2013-12-20
Record Last Modified 2018-11-01

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0795657750 2014-03-27 Drill / Deepen / Reopen No Violations I performed a status check on the above location. At this time there has been no drilling activity on the location. The location is secured by a chain link fence and a locked entrance gate. Location is clear of debris. Lease road is in good condition. Erosions control is in good condition. No violation at this time. I spoke with a Chesapeake Representative, Lucas Shipper and he did not know when any drilling active would take place. The drilling permit expired on 11/13/2013.
1481734181 2016-12-13 Not Drilled No Violations I performed an inspection on this drill pad. This well was not drilled, permit has expired there is no production equipment or pipelines installed. There is an 8 chain link fence with 3 strands of barbed wire around the top. There is a 20 entrance gate and one man gate. Landowners have signed the ( Form 5) Landowner waiver accepting the responsible of the drill pad and lease road.
1991432269 2012-05-22 Drill / Deepen / Reopen No Violations On 5/22/2012, I talked to the site foreman who stated that they started building the lease road and drilling location.
795657750 2014-3-27 0:00: DD No Violations 2.00

For data sources see[3]