If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-23192 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-80.53,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Poland Township | |
Operator Name: HILCORP ENERGY COMPANY | |
Well Pad ID: US-OH-000748 | |
Farm/Lease Name: POLAND-CLL2 | |
License Status: Producing | |
License Date: 2013-06-17 | |
Spud Date: 2013-09-29 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2013-11-15 | |
Well Total Depth: 17263.00 ft | |
Configuration: Horizontal | |
Latitude: 41.010000 | |
Longitude: -80.530000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-06-17 | Proposed Formations:POINT PLEASANT, Issued Date:6/17/2013, Expired Date:6/17/2015 12:00:00 PM, Drilling unit acres:2474.17, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-11-15 | |
Construction Permit Expires | 2014-06-17 | |
Correction to Well | 2015-02-13 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-06-15 | |
Record Last Modified | 2018-10-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-06-25 | 8590 | 17151 | 864 |
8590 | 17151 | 864 | |
8590 | 17151 | 864 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-02-15 | H2O | 15 | 9146 Bbl | 449500 | Universal Well Services Inc. | STAGE 8
48 SHOTS |
2014-02-22 | H2O | 15 | 8622 Bbl | 444500 | Universal Well Services Inc. | STAGE 24
48 SHOTS |
2014-02-14 | H2O | 15 | 9089 Bbl | 452900 | Universal Well Services Inc. | STAGE 6
48 SHOTS |
2014-02-22 | H2O | 15 | 9263 Bbl | 455900 | Universal Well Services Inc. | STAGE 21
48 SHOTS |
2014-02-20 | H2O | 15 | 8786 Bbl | 450000 | Universal Well Services Inc. | STAGE 16
48 SHOTS |
2014-02-16 | H2O | 15 | 9015 Bbl | 455800 | Universal Well Services Inc. | STAGE 11
48 SHOTS |
2014-02-14 | H2O | 15 | 9190 Bbl | 4542 | Universal Well Services Inc. | STAGE 5
48 SHOTS |
2014-02-21 | H2O | 15 | 8848 Bbl | 4546 | Universal Well Services Inc. | STAGE 18
48 SHOTS |
2014-02-22 | H2O | 15 | 9289 Bbl | 449800 | Universal Well Services Inc. | STAGE 20
48 SHOTS |
2014-02-15 | H2O | 15 | 9015 Bbl | 450300 | Universal Well Services Inc. | STAGE 10
48 SHOTS |
2014-02-22 | H2O | 15 | 9664 Bbl | 448300 | Universal Well Services Inc. | STAGE 22
48 SHOTS |
2014-02-20 | H2O | 15 | 9118 Bbl | 451300 | Universal Well Services Inc. | STAGE 15
48 SHOTS |
2014-02-20 | H2O | 15 | 8751 Bbl | 450500 | Universal Well Services Inc. | STAGE 17
48 SHOTS |
2014-02-23 | H2O | 15 | 9145 Bbl | 447700 | Universal Well Services Inc. | STAGE 25
48 SHOTS |
2014-02-14 | H2O | 15 | 9092 Bbl | 456100 | Universal Well Services Inc. | STAGE 7
48 SHOTS |
2014-02-22 | H2O | 15 | 9113 Bbl | 448100 | Universal Well Services Inc. | STAGE 23
48 SHOTS |
2014-02-23 | H2O | 15 | 8642 Bbl | 452700 | Universal Well Services Inc. | STAGE 27
48 SHOTS |
2014-02-17 | H2O | 15 | 9669 Bbl | 448400 | Universal Well Services Inc. | STAGE 14
48 SHOTS |
15 | 0 | 0 | ||||
2014-02-23 | H2O | 15 | 8817 Bbl | 455300 | Universal Well Services Inc. | STAGE 26
48 SHOTS |
2014-02-15 | H2O | 15 | 9399 Bbl | 434300 | Universal Well Services Inc. | STAGE 9
48 SHOTS |
2014-02-16 | H2O | 15 | 9069 Bbl | 447100 | Universal Well Services Inc. | STAGE 13
48 SHOTS |
2014-02-16 | H2O | 15 | 8923 Bbl | 454400 | Universal Well Services Inc. | STAGE 12
48 SHOTS |
2014-02-13 | H2O | 15 | 9165 Bbl | 451100 | Universal Well Services Inc. | STAGE 3
48 SHOTS |
2014-02-21 | H2O | 15 | 8530 Bbl | 359700 | Universal Well Services Inc. | STAGE 19
48 SHOTS |
2014-02-12 | H2O | 15 | 10418 Bbl | 405400 | Universal Well Services Inc. | STAGE 2
32 SHOTS |
2014-02-13 | H2O | 15 | 9489 Bbl | 449900 | Universal Well Services Inc. | STAGE 4
48 SHOTS |
2014-02-11 | H2O | 15 | 10151 Bbl | 448500 | Universal Well Services Inc. | STAGE 1
32 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | 765591 | 0 | 206 |
2015 | HILCORP ENERGY COMPANY | 953716 | 0 | 329 |
2016 | HILCORP ENERGY COMPANY | 632784 | 0 | 362 |
2017 | HILCORP ENERGY COMPANY | 457084 | 0 | 363 |
2018 | HILCORP ENERGY COMPANY | 300948 | 0 | 363 |
2019 | HILCORP ENERGY COMPANY | 56298 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | Brine | 20183 | 206 |
2015 | HILCORP ENERGY COMPANY | Brine | 7439 | 329 |
2016 | HILCORP ENERGY COMPANY | Brine | 8261 | 362 |
2017 | HILCORP ENERGY COMPANY | Brine | 3717 | 363 |
2018 | HILCORP ENERGY COMPANY | Brine | 2444 | 363 |
2019 | HILCORP ENERGY COMPANY | Brine | 1111 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1139385873 | 2013-9-30 0:00: | DD | No Violations | 4.00 |
-1295984685 | 2013-11-8 0:00: | DD | No Violations | 1.00 |
-1315203098 | 2014-5-6 0:00:0 | PW | No Violations | 1.00 |
-1368717678 | 2014-12-26 0:00 | PW | No Violations | 1.00 |
-1425244879 | 2014-3-5 0:00:0 | DD | No Violations | 1.00 |
-1688490216 | 2013-7-18 0:00: | DD | No Violations | 3.00 |
-1770235240 | 2017-1-13 0:00: | PW | No Violations | 1.00 |
-1963749520 | 2018-6-27 0:00: | PW | No Violations | 1.00 |
-379154464 | 2019-12-3 0:00: | PW | No Violations | 1.00 |
-429171742 | 2016-9-9 0:00:0 | PW | No Violations | 1.00 |
-460492733 | 2017-6-8 0:00:0 | PW | No Violations | 1.00 |
-575140420 | 2017-7-13 0:00: | PW | No Violations | 2.00 |
-765108635 | 2013-9-1 0:00:0 | DD | No Violations | 3.00 |
-775790714 | 2013-1-31 0:00: | DD | No Violations | |
0005114044 | 2013-09-04 | Drill / Deepen / Reopen | No Violations | On 9/4/2013 Falcone Drilling Rig 18 drilled a 12.5 well bore to a total depth of 2500 and ran 2500 and ran 2500 of 9.625- 36# - J-55 intermediate casing. Baker Hughes pumped 233 barrels of water followed by 35 barrels of gel+fed+celflake followed by 10 barrels of spacer. They pumped 872 sacks of PNE-1.05%SF=1%CaCl+.5%BA-10A. Dropped plug and displaced with 190 barrels of water. Bumped plug pressured to 1431 psi and held for 5 minutes and then released. Pumped pressure to 300 and shut well in. Good circulation throughout job. 35 barrels of cement returned to surface. |
0029984835 | 2014-04-16 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. At this time there is no drilling or stimulations active. There is various clean up operations on gone, removing containment, flowback equipment and tanks. Well is shut-in. |
0182928420 | 2013-06-18 | Drill / Deepen / Reopen | No Violations | I was on the above location to perform a status check. Trumbull Excavating is constructing the drilling pad and Weaver is installing the silt socks around the location. Permit signs are posted. No violations were noted at this time. |
0242697133 | 2014-03-29 | Production Wells | No Violations | I was on location to follow up to complaint #4648. Complainant called Tom Hill on Friday evening (3/28/14) and stated that a friend of hers told her that he has a friend who is a driver in the oil & gas industry and that he heard that there was a massive frac fluid spill that cannot be controlled happening at the Poland CCL. During my inspection I checked the roads and locations surrounding both pad locations and did not find any signs of spills or attempted cleanup of spills. There were multiple oil tankers on location pulling from the frac tanks on location. On the location 1 of 2 flares were currently being used. A Greenes Energy supervisor was on location and did not know of any spills or leaks on or around the location. At this time there is no uncontrolled spill of frac fluid and no other violations. |
0281970488 | 2015-11-02 | Production Wells | No Violations | I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time. |
0429171742 | 2016-09-09 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
0460492733 | 2017-06-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
0575140420 | 2017-07-13 | Production Wells | No Violations | I performed a compliant #5652 follow up inspection on the above location. Gary Deperro at 6749 Styme Rd. Lowellville Ohio. He stated that he could hear the compressor noise at his residence. I stopped at his address and could hear a low noise The compressor is approximately 5,500 feet from his residence. I will be in contact with Tom Havanek Operations Manager for Hilcorp. |
0765108635 | 2013-09-01 | Drill / Deepen / Reopen | No Violations | I meet with Inspector Rick Anderson at the above location. We walked around the Falcone Rig 18 so he could see how they sat the rig up to drill multi wells on this pad. We also went to the Central Production Pad for these wells. At this location there is 6- 400 barrel tanks a compressor and various production equipment at this location. |
0775790714 | 2013-01-31 | Drill / Deepen / Reopen | No Violations | Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time. |
0843612211 | 2018-11-06 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
1005199566 | 2015-09-28 | Production Wells | No Violations | I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time. |
103235554 | 2019-7-12 0:00: | PW | No Violations | 1.00 |
1139385873 | 2013-09-30 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig 18 drilled a 17.5 well bore to a total depth of 900 and ran 900 of 13-3/8 61# J-55 casing. Baker Hughes pumped 170 barrels of water ahead followed by 35 barrels of Gel with Fed Seal and Cello flake follow by 10 barrels of fresh water spacer. They pumped 766 sacks of A+.05S+2CACL+.5BA10 cement. Displaced with 132 barrels of fresh water. Bumped plug floats held. There was 50 barrels of cement returned to surface. Good circulation throughout job. |
1222241078 | 2015-06-17 | Preliminary Restoration | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Preliminary Restoration is passed |
1295984685 | 2013-11-08 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. H&P 225 is at a depth of 12950 of a 17000 well bore. At present the drilling rig is down due to the mud needing repairs. Haas Environmental is on location vacuuming fresh water from the drill pad containment. No violations were noted at this time. |
1315203098 | 2014-05-06 | Production Wells | No Violations | I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration can not be passed at this time. |
1368717678 | 2014-12-26 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
1376934842 | 2013-07-15 | Drill / Deepen / Reopen | No Violations | Experss Energy Service is on location drilling a 30 conductor hole to a depth of 90 They will be cementing the 20 conductor on 8/18/2013. |
1384283862 | 2013-11-01 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above well location. H&P Rig 225 drilled to a depth of 6858. Weatherford is hooking up their directional tools to start there kick off. No violation were noted at this time. |
1395324947 | 2014-02-12 | Drill / Deepen / Reopen | No Violations | Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time. |
1399300285 | 2014-04-21 | Drill / Deepen / Reopen | No Violations | C.L Forbes Service Rig is on location running 2 7/8 tubing. Rig is setting on containment fire extinguishers are at various location and safety lanes are marked. Wellheads are protected with steel cages over them. No violations were noted at this time. |
1409675403 | 2014-06-09 | Production Wells | No Violations | On 6/9/2014. After receiving the approval to produce dated 6/6/2014. Hilcop Energy started turning the above well into production. I was on location to observe this operation. There were various Hilcorp personal on location. Turn on was completed with out incident. Equipment is set up with various safety shut downs. |
1425244879 | 2014-03-05 | Drill / Deepen / Reopen | No Violations | Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time. |
1643884868 | 2014-06-11 | Administrative Inspection | No Violations | I was on location with Geologist Mike McCormac and Geologist Teresa McQuade from the ODNR Columbus Office and also Adam Mullet a production personal from Hilcorp. Adam was explaining how the Gas Production Units ( GPU ) measured the gas and fluids before it went to the central production facility. The production facility is where the gas enters the sales point and the water and oil/condensate is collected. |
1644118266 | 2016-01-20 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
1688490216 | 2013-07-18 | Drill / Deepen / Reopen | No Violations | Express Energy Service is on location drilling a 30 conductor hole to a depth of 90 and ran 90 of 20 94# conductor casing. They cemented with 172 sacks of class A cement. They had 13 barrels of cement returned to surface. . Permits are posted. There has been safety meeting. No violations at this time. Teresa McQuade and Ken Brown from the permitting department was on location to observe the operation. |
1770235240 | 2017-01-13 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
182928420 | 2013-6-18 0:00: | DD | No Violations | 2.00 |
1963749520 | 2018-06-27 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
242697133 | 2014-3-29 0:00: | PW | No Violations | 3.00 |
281970488 | 2015-11-2 0:00: | PW | No Violations | 1.00 |
29984835 | 2014-4-16 0:00: | DD | No Violations | 1.00 |
5114044 | 2013-9-4 0:00:0 | DD | No Violations | 5.00 |
843612211 | 2018-11-6 0:00: | PW | No Violations | 1.00 |
For data sources see[9]