Well ID: 34-099-23198 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-80.53,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Poland Township | |
Operator Name: HILCORP ENERGY COMPANY | |
Well Pad ID: US-OH-000748 | |
Farm/Lease Name: POLAND-CLL2 | |
License Status: Producing | |
License Date: 2013-07-17 | |
Spud Date: 2013-09-10 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2013-12-13 | |
Well Total Depth: 16178.00 ft | |
Configuration: Horizontal | |
Latitude: 41.010000 | |
Longitude: -80.530000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-17 | Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:2417.17, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-12-13 | |
Construction Permit Expires | 2014-07-17 | |
Correction to Well | 2015-02-20 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-06-15 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-06-27 | 15910 | 16070 | 30 |
15910 | 16070 | 30 | |
15910 | 16070 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-02-25 | H2O | 8 | 10387 Bbl | 503300 | Universal Well Services Inc. | STAGE 1
30 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | 33308 | 0 | 196 |
2015 | HILCORP ENERGY COMPANY | 28956 | 0 | 309 |
2016 | HILCORP ENERGY COMPANY | 13857 | 0 | 205 |
2017 | HILCORP ENERGY COMPANY | 23798 | 0 | 363 |
2018 | HILCORP ENERGY COMPANY | 15453 | 0 | 361 |
2019 | HILCORP ENERGY COMPANY | 3045 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | Brine | 958 | 196 |
2015 | HILCORP ENERGY COMPANY | Brine | 988 | 309 |
2016 | HILCORP ENERGY COMPANY | Brine | 334 | 205 |
2017 | HILCORP ENERGY COMPANY | Brine | 873 | 363 |
2018 | HILCORP ENERGY COMPANY | Brine | 550 | 361 |
2019 | HILCORP ENERGY COMPANY | Brine | 146 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1493015430 | 2015-11-2 0:00: | PW | No Violations | 2.00 |
-1768094943 | 2016-9-8 0:00:0 | PW | No Violations | 1.00 |
-1801797468 | 2013-7-19 0:00: | DD | No Violations | 3.00 |
-1922572344 | 2015-6-17 0:00: | PL | No Violations | 1.00 |
-1995185760 | 2015-9-28 0:00: | PW | No Violations | 1.00 |
-2020372584 | 2014-1-31 0:00: | DD | No Violations | 1.00 |
-215465325 | 2019-12-3 0:00: | PW | No Violations | 1.00 |
-265658150 | 2017-1-13 0:00: | PW | No Violations | 1.00 |
-476409892 | 2016-1-20 0:00: | PW | No Violations | 1.00 |
-551193683 | 2015-8-21 0:00: | PW | No Violations | 1.00 |
-697046005 | 2014-3-5 0:00:0 | DD | No Violations | 1.00 |
0265658150 | 2017-01-13 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
0476409892 | 2016-01-20 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
0551193683 | 2015-08-21 | Production Wells | No Violations | I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
0697046005 | 2014-03-05 | Drill / Deepen / Reopen | No Violations | Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time. |
0710754237 | 2018-11-06 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
1089814599 | 2018-06-27 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
1379520201 | 2013-09-18 | Drill / Deepen / Reopen | No Violations | On 9/15/2013, I was notified by Norman Wood, drilling consultant for Hilcorp Energy that they did not get cement returns to surface on the 9-5/8 intermediate casing job. The well was drilled to a depth of 2500. He stated that on 9/16/2013 that Baker Hughes would be on location to run a Differential Temperature Log survey to locate the cement top. Upon running the log they could only get to 1148 inside the 9-5/8 casing. Not knowing if there is a split or separated casing, Falcone Drilling tripped drill pipe back in the hole with a Tri-Cone drill bit and drilled out the cement. They drilled to a depth of 2443 that is 57 above the shoe. Northeast Region Supervisor Tom Hill and myself meet in the Uniontown Office and recalculated the complete cement job, all calculation were correct with Baker Hughes job report. On 9/17/2013 I was on location to witness the 9-5/8 casing integrity test. The hole was loaded with fresh water. STT Testing pressured the 9-5/8 casing to 2400 psi. and held this psi for 30 minutes without a pressure drop. This was recorded on a 60 minute rotation chart. After the pressure test was completed, Baker Hughes was on location to perform a Segmented Bond Log Survey. Baker Hughes logged the top of the cement to be at 1275 from KB (Drilling floor). From the shoe there is 1171 of cement. This satisfies the stated requirement of 500 above the shoe. |
1380805649 | 2013-09-15 | Drill / Deepen / Reopen | No Violations | I witnessed Baker Hughes cement the intermediate casing for Hilcorp Energy for ODNR Inspector John Fleming. Falcon Drilling drilled a 12.25 Hole #3 to 2,500 and set 9.625 casing at 2,500. Baker Hughes established circulation with fresh water. The operator pumped 50 bbls of gel followed by 872 sacks of cement. Baker Hughes dropped the plug and displaced the cement with 190 bbls of fresh water. I witnessed a trace of gel returned to surface and no cement. Circulation was never lost during the cementing operations. I immediately contacted ODNR Inspector John Fleming. John told Hilcorp to run a bond log to locate the approximate depth of the cement. |
1394013517 | 2017-06-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
1409657080 | 2014-05-06 | Production Wells | No Violations | I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration can not be passed at this time. |
1419879541 | 2014-12-26 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
1493015430 | 2015-11-02 | Production Wells | No Violations | I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time. |
1768094943 | 2016-09-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
1801797468 | 2013-07-19 | Drill / Deepen / Reopen | No Violations | Express Energy Service is on location drilling a 30 conductor hole to a depth of 90 and ran 90 of 20 94# conductor casing. They cemented with 172 sacks of class A cement. They had 13 barrels of cement returned to surface. . Permits are posted. There has been safety meeting. No violations at this time. |
1885031757 | 2014-04-16 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. At this time there is no drilling or stimulations active at this location. There is various clean up operations on gone, removing containment, flowback equipment and tanks. Well is shut-in. |
1922572344 | 2015-06-17 | Preliminary Restoration | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Preliminary Restoration is passed |
1995185760 | 2015-09-28 | Production Wells | No Violations | I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time. |
2020372584 | 2014-01-31 | Drill / Deepen / Reopen | No Violations | Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time. |
2129488319 | 2013-09-10 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig #18 drilled a 17.5 well bore to a total depth of 900 and ran 899 of 13-3/8 61# CSG J-55 casing. Baker Hughes pumped 172 barrels of water follow by 35 barrels of Gel with Fed Seal and cello flake and 10 barrels of fresh water spacer. They pumped 766 sacks of PNE-1+.05S-F-2CACL2+.5BA10A cement. Displaced with 130 barrels of water. Good circulation throughout job. There was 50 barrels of returns. Bumped and held plug. Shut cement head in. |
710754237 | 2018-11-6 0:00: | PW | No Violations | 1.00 |