X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23200

Well Details

Well ID: 34-099-23200
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Poland Township
Operator Name: HILCORP ENERGY COMPANY
Well Pad ID: US-OH-000748
Farm/Lease Name: POLAND-CLL2
License Status: Producing
License Date: 2013-07-17
Spud Date: 2013-07-18
Spud Drilling Contractor: FALCON DRLG
Final Drill Date: 2013-12-22
Well Total Depth: 15056.00 ft
Configuration: Horizontal
Latitude: 41.010000
Longitude: -80.530000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-17 Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:2417.17, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-12-22
Construction Permit Expires 2014-07-17
Correction to Well 2015-02-13 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2016-06-15
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-06-25 8300 14942 840
8300 14942 840
8300 14942 840

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-03-04 H2O 8 8342 Bbl 439200 Universal Well Services Inc. STAGE 22

48 SHOTS

2014-03-04 H2O 8 8826 Bbl 448300 Universal Well Services Inc. STAGE 23

48 SHOTS

2014-03-05 H2O 8 8835 Bbl 454100 Universal Well Services Inc. STAGE 26

48 SHOTS

2014-03-03 H2O 8 9254 Bbl 382700 Universal Well Services Inc. STAGE 19

48 SHOTS

2014-03-04 H2O 8 8759 Bbl 453300 Universal Well Services Inc. STAGE 25

48 SHOTS

2014-03-02 H2O 8 8848 Bbl 451300 Universal Well Services Inc. STAGE 13

48 SHOTS

2014-02-28 H2O 8 8756 Bbl 449000 Universal Well Services Inc. STAGE 6

48 SHOTS

2014-02-28 H2O 8 9449 Bbl 451200 Universal Well Services Inc. STAGE 3

48 SHOTS

2014-03-02 H2O 8 8968 Bbl 453000 Universal Well Services Inc. STAGE 12

48 SHOTS

2014-03-01 H2O 8 8984 Bbl 450800 Universal Well Services Inc. STAGE 10

48 SHOTS

2014-03-02 H2O 8 9424 Bbl 454000 Universal Well Services Inc. STAGE 16

48 SHOTS

2014-03-01 H2O 8 8744 Bbl 445900 Universal Well Services Inc. STAGE 7

48 SHOTS

2014-03-02 H2O 8 9354 Bbl 449300 Universal Well Services Inc. STAGE 15

48 SHOTS

2014-03-05 H2O 8 8828 Bbl 45800 Universal Well Services Inc. STAGE 27

48 SHOTS

2014-02-28 H2O 8 9645 Bbl 450600 Universal Well Services Inc. STAGE 4

48 SHOTS

2014-02-28 H2O 8 9701 Bbl 449100 Universal Well Services Inc. STAGE 2

48 SHOTS

2014-03-03 H2O 8 9616 Bbl 332200 Universal Well Services Inc. STAGE 17

48 SHOTS

2014-02-25 H2O 8 8471 Bbl 448500 Universal Well Services Inc. STAGE 1

48 SHOTS

2014-03-03 H2O 8 9032 Bbl 451600 Universal Well Services Inc. STAGE 20

48 SHOTS

2014-03-04 H2O 8 8867 Bbl 449000 Universal Well Services Inc. STAGE 24

48 SHOTS

2014-03-03 H2O 8 8706 Bbl 452400 Universal Well Services Inc. STAGE 21

48 SHOTS

2014-02-28 H2O 8 8819 Bbl 448900 Universal Well Services Inc. STAGE 5

48 SHOTS

2014-03-03 H2O 8 9700 Bbl 448600 Universal Well Services Inc. STAGE 18

48 SHOTS

2014-03-05 H2O 8 9815 Bbl 450300 Universal Well Services Inc. STAGE 28

48 SHOTS

2014-03-01 H2O 8 8785 Bbl 452000 Universal Well Services Inc. STAGE 9

48 SHOTS

2014-03-02 H2O 8 8910 Bbl 450800 Universal Well Services Inc. STAGE 11

48 SHOTS

2014-03-01 H2O 8 8766 Bbl 446400 Universal Well Services Inc. STAGE 8

48 SHOTS

2014-03-02 H2O 8 8832 Bbl 450800 Universal Well Services Inc. STAGE 14

48 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 HILCORP ENERGY COMPANY 711977 0 206
2015 HILCORP ENERGY COMPANY 782486 0 303
2016 HILCORP ENERGY COMPANY 465649 0 316
2017 HILCORP ENERGY COMPANY 337612 0 336
2018 HILCORP ENERGY COMPANY 283829 0 355
2019 HILCORP ENERGY COMPANY 67833 0 81

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 HILCORP ENERGY COMPANY Brine 48160 206
2015 HILCORP ENERGY COMPANY Brine 43674 303
2016 HILCORP ENERGY COMPANY Brine 37243 316
2017 HILCORP ENERGY COMPANY Brine 47511 336
2018 HILCORP ENERGY COMPANY Brine 42835 355
2019 HILCORP ENERGY COMPANY Brine 10419 81

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-118483535 2014-6-9 0:00:0 PW No Violations 2.00
-1235973870 2014-6-11 0:00: AM No Violations 1.00
-1482466355 2018-6-27 0:00: PW No Violations 1.00
-1639393069 2013-7-18 0:00: DD No Violations 3.00
-1644230990 2016-9-9 0:00:0 PW No Violations 1.00
-1745500621 2014-5-6 0:00:0 PW No Violations 1.00
-1912155395 2015-11-2 0:00: PW No Violations 1.00
-2038254981 2015-9-28 0:00: PW No Violations 1.00
-860709774 2014-3-5 0:00:0 DD No Violations 1.00
-870340656 2013-8-30 0:00: DD No Violations
0018030775 2014-12-26 Production Wells No Violations I performed a status check on the above location. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time.
0061958723 2015-06-17 Preliminary Restoration No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Preliminary Restoration is passed
0118483535 2014-06-09 Production Wells No Violations On 6/9/2014. After receiving the approval to produce dated 6/6/2014. Hilcop Energy started turning the above well into production. I was on location to observe this operation. There were various Hilcorp personal on location. Turn on was completed with out incident. Equipment is set up with various safety shut downs.
0742668118 2016-09-30 Production Wells No Violations I performed a follow up inspection to check the pressure between the annuls 13-3/8 and the 9-5/8 casing there was 100 psi. I called Tom Havanek and instructed him to install a relieve valve or to plumb the annuals into the flowline (50 psi). He instructed that he would have his contractor to perform the job.
0852090077 2017-01-13 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time.
0860709774 2014-03-05 Drill / Deepen / Reopen No Violations Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time.
0868905004 2018-11-06 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time.
0870340656 2013-08-30 Drill / Deepen / Reopen No Violations Falcone Drilling Rig #18 drilled a 17.5 well bore to a total depth of 900 and ran 896 of 13-3/8 61# CSG J-55 casing. Baker Hughes pumped 170 barrels of water follow by 35 barrels of Gel with Fed Seal and cello flake and 10 barrels of fresh water spacer. They pumped 760 sacks of PNE-1+.05S-F-2CACL2+.5BA10A cement. Displaced with 130 barrels of water. Good circulation through out job. There was 50 barrels of returns. Bumped and held plug. Shut cement head in. This job was covered by Inspector Rick Skidmore.
1235973870 2014-06-11 Administrative Inspection No Violations I was on location with Geologist Mike McCormac and Geologist Teresa McQuade from the ODNR Columbus Office and also Adam Mullet a production personal from Hilcorp. Adam was explaining how the Gas Production Units ( GPU ) measured the gas and fluids before it went to the central production facility. The production facility is where the gas enters the sales point and the water and oil/condensate is collected.
1247349587 2014-01-31 Production Wells No Violations Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time.
1378281651 2013-08-30 Drill / Deepen / Reopen No Violations I witnessed Baker Hughes cement the surface casing for Hillcorp. Falcon Drilling drilled a 17.5 Hole #2 to 900 RKB and set 13.375 casing at 899 RKB with 7 centralizers. The casing had a weight of 61 lbs/ft and a P-55 grading. Baker Hughes established circulation and pumped 35 bbls of gel. The operator pumped 766 sacks of Class A cement and displaced the cement to 852 RKB with 129.7 bbls of fresh water. I witnessed approximately 40 bbls of good cement returned to surface. Cement was inspected 20 minutes after completion and was static at surface.
1380726134 2013-09-03 Drill / Deepen / Reopen No Violations Falcone Drilling Rig 18 drilled a 12.25 well bore to a total depth of 2543 and ran 2543 of 9.625 36# J-55 CSG casing. Baker Hughes pumped ahead 230 barrels of water followed by 35 barrels of Gel/Fed Seal/Cello Flake and 10 barrels. They pumped 887 sacks of PNE-1.05% STATSTATFREE=1%CACL2=.75GAL/SK FP-6. They displaced with 190 barrels of fresh water. There was 37 barrels of cement returned to surface. Good circulation throughout the job.
1388674801 2013-12-18 Drill / Deepen / Reopen No Violations I performed a walk around inspection on the above location water trucks were vacuuming fresh water from the continament pad around H&P Rig 225. Location is clear of debris and fire extinguishers are located at various places around the drilling location. Permits are posted in Hilcorps Office. No violations were noted at this time.
1392663004 2015-08-21 Production Wells No Violations I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time.
1393107872 2016-09-08 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. I noticed that the annuals had 600 psi between the 13-3/8 and the 9-5/8. I called Tom Havanek Operations Manager and told him about the pressure. He set up a meeting for 9/9/2016 at 1:00 PM with his production personnel. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There are also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system.
1454522604 2016-01-20 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. This is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. CES Energy Services on location swabbing the wells.
1482466355 2018-06-27 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system.
1536157441 2016-10-14 Production Wells No Violations I performed a follow up inspection. Hilcorp has installed the gage and also installed 3/8 tubing on the 13-3/8 annuals into the flowline at present there is 0 psi. ID signs are posted no noted violation at this time.
1576249882 2019-12-3 0:00: PW No Violations 1.00
1612725756 2014-04-16 Drill / Deepen / Reopen No Violations I performed a status check on the above location. At this time there is no drilling or stimulations active at this location. There is various clean up operations on gone, removing containment, flowback equipment and tanks. Well is shut-in.
1639393069 2013-07-18 Drill / Deepen / Reopen No Violations Express Energy Service is on location drilling a 30 conductor hole to a depth of 90 and ran 90 of 20 94# conductor casing. They cemented with 172 sacks of class A cement. They had 13 barrels of cement returned to surface. . Permits are posted. There has been safety meeting. No violations at this time. Teresa McQuade and Ken Brown from the permitting department was on location to observe the operation.
1644230990 2016-09-09 Production Wells No Violations Northeast Region Supervisor Tom Hill and myself meet with Hilcorps Production personnel to discussed the annuals pressure 600 psi on this well. They removed the gage and bleed the pressure off. There was no noticeable pressure coming out of the needle valve They installed a new gage and will monitor the pressures.
1745500621 2014-05-06 Production Wells No Violations I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration can not be passed at this time.
18030775 2014-12-26 0:00 PW No Violations 1.00
1811961023 2019-7-12 0:00: PW No Violations 1.00
1887143420 2017-06-08 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time.
1912155395 2015-11-02 Production Wells No Violations I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time.
2038254981 2015-09-28 Production Wells No Violations I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time.
61958723 2015-6-17 0:00: PL No Violations 1.00
742668118 2016-9-30 0:00: PW No Violations 1.00
852090077 2017-1-13 0:00: PW No Violations 1.00
868905004 2018-11-6 0:00: PW No Violations 1.00

For data sources see[9]

References