If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-23200 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-80.53,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Poland Township | |
Operator Name: HILCORP ENERGY COMPANY | |
Well Pad ID: US-OH-000748 | |
Farm/Lease Name: POLAND-CLL2 | |
License Status: Producing | |
License Date: 2013-07-17 | |
Spud Date: 2013-07-18 | |
Spud Drilling Contractor: FALCON DRLG | |
Final Drill Date: 2013-12-22 | |
Well Total Depth: 15056.00 ft | |
Configuration: Horizontal | |
Latitude: 41.010000 | |
Longitude: -80.530000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-17 | Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:2417.17, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-12-22 | |
Construction Permit Expires | 2014-07-17 | |
Correction to Well | 2015-02-13 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-06-15 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-06-25 | 8300 | 14942 | 840 |
8300 | 14942 | 840 | |
8300 | 14942 | 840 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-03-04 | H2O | 8 | 8342 Bbl | 439200 | Universal Well Services Inc. | STAGE 22
48 SHOTS |
2014-03-04 | H2O | 8 | 8826 Bbl | 448300 | Universal Well Services Inc. | STAGE 23
48 SHOTS |
2014-03-05 | H2O | 8 | 8835 Bbl | 454100 | Universal Well Services Inc. | STAGE 26
48 SHOTS |
2014-03-03 | H2O | 8 | 9254 Bbl | 382700 | Universal Well Services Inc. | STAGE 19
48 SHOTS |
2014-03-04 | H2O | 8 | 8759 Bbl | 453300 | Universal Well Services Inc. | STAGE 25
48 SHOTS |
2014-03-02 | H2O | 8 | 8848 Bbl | 451300 | Universal Well Services Inc. | STAGE 13
48 SHOTS |
2014-02-28 | H2O | 8 | 8756 Bbl | 449000 | Universal Well Services Inc. | STAGE 6
48 SHOTS |
2014-02-28 | H2O | 8 | 9449 Bbl | 451200 | Universal Well Services Inc. | STAGE 3
48 SHOTS |
2014-03-02 | H2O | 8 | 8968 Bbl | 453000 | Universal Well Services Inc. | STAGE 12
48 SHOTS |
2014-03-01 | H2O | 8 | 8984 Bbl | 450800 | Universal Well Services Inc. | STAGE 10
48 SHOTS |
2014-03-02 | H2O | 8 | 9424 Bbl | 454000 | Universal Well Services Inc. | STAGE 16
48 SHOTS |
2014-03-01 | H2O | 8 | 8744 Bbl | 445900 | Universal Well Services Inc. | STAGE 7
48 SHOTS |
2014-03-02 | H2O | 8 | 9354 Bbl | 449300 | Universal Well Services Inc. | STAGE 15
48 SHOTS |
2014-03-05 | H2O | 8 | 8828 Bbl | 45800 | Universal Well Services Inc. | STAGE 27
48 SHOTS |
2014-02-28 | H2O | 8 | 9645 Bbl | 450600 | Universal Well Services Inc. | STAGE 4
48 SHOTS |
2014-02-28 | H2O | 8 | 9701 Bbl | 449100 | Universal Well Services Inc. | STAGE 2
48 SHOTS |
2014-03-03 | H2O | 8 | 9616 Bbl | 332200 | Universal Well Services Inc. | STAGE 17
48 SHOTS |
2014-02-25 | H2O | 8 | 8471 Bbl | 448500 | Universal Well Services Inc. | STAGE 1
48 SHOTS |
2014-03-03 | H2O | 8 | 9032 Bbl | 451600 | Universal Well Services Inc. | STAGE 20
48 SHOTS |
2014-03-04 | H2O | 8 | 8867 Bbl | 449000 | Universal Well Services Inc. | STAGE 24
48 SHOTS |
2014-03-03 | H2O | 8 | 8706 Bbl | 452400 | Universal Well Services Inc. | STAGE 21
48 SHOTS |
2014-02-28 | H2O | 8 | 8819 Bbl | 448900 | Universal Well Services Inc. | STAGE 5
48 SHOTS |
2014-03-03 | H2O | 8 | 9700 Bbl | 448600 | Universal Well Services Inc. | STAGE 18
48 SHOTS |
2014-03-05 | H2O | 8 | 9815 Bbl | 450300 | Universal Well Services Inc. | STAGE 28
48 SHOTS |
2014-03-01 | H2O | 8 | 8785 Bbl | 452000 | Universal Well Services Inc. | STAGE 9
48 SHOTS |
2014-03-02 | H2O | 8 | 8910 Bbl | 450800 | Universal Well Services Inc. | STAGE 11
48 SHOTS |
2014-03-01 | H2O | 8 | 8766 Bbl | 446400 | Universal Well Services Inc. | STAGE 8
48 SHOTS |
2014-03-02 | H2O | 8 | 8832 Bbl | 450800 | Universal Well Services Inc. | STAGE 14
48 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | 711977 | 0 | 206 |
2015 | HILCORP ENERGY COMPANY | 782486 | 0 | 303 |
2016 | HILCORP ENERGY COMPANY | 465649 | 0 | 316 |
2017 | HILCORP ENERGY COMPANY | 337612 | 0 | 336 |
2018 | HILCORP ENERGY COMPANY | 283829 | 0 | 355 |
2019 | HILCORP ENERGY COMPANY | 67833 | 0 | 81 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | Brine | 48160 | 206 |
2015 | HILCORP ENERGY COMPANY | Brine | 43674 | 303 |
2016 | HILCORP ENERGY COMPANY | Brine | 37243 | 316 |
2017 | HILCORP ENERGY COMPANY | Brine | 47511 | 336 |
2018 | HILCORP ENERGY COMPANY | Brine | 42835 | 355 |
2019 | HILCORP ENERGY COMPANY | Brine | 10419 | 81 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-118483535 | 2014-6-9 0:00:0 | PW | No Violations | 2.00 |
-1235973870 | 2014-6-11 0:00: | AM | No Violations | 1.00 |
-1482466355 | 2018-6-27 0:00: | PW | No Violations | 1.00 |
-1639393069 | 2013-7-18 0:00: | DD | No Violations | 3.00 |
-1644230990 | 2016-9-9 0:00:0 | PW | No Violations | 1.00 |
-1745500621 | 2014-5-6 0:00:0 | PW | No Violations | 1.00 |
-1912155395 | 2015-11-2 0:00: | PW | No Violations | 1.00 |
-2038254981 | 2015-9-28 0:00: | PW | No Violations | 1.00 |
-860709774 | 2014-3-5 0:00:0 | DD | No Violations | 1.00 |
-870340656 | 2013-8-30 0:00: | DD | No Violations | |
0018030775 | 2014-12-26 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
0061958723 | 2015-06-17 | Preliminary Restoration | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Preliminary Restoration is passed |
0118483535 | 2014-06-09 | Production Wells | No Violations | On 6/9/2014. After receiving the approval to produce dated 6/6/2014. Hilcop Energy started turning the above well into production. I was on location to observe this operation. There were various Hilcorp personal on location. Turn on was completed with out incident. Equipment is set up with various safety shut downs. |
0742668118 | 2016-09-30 | Production Wells | No Violations | I performed a follow up inspection to check the pressure between the annuls 13-3/8 and the 9-5/8 casing there was 100 psi. I called Tom Havanek and instructed him to install a relieve valve or to plumb the annuals into the flowline (50 psi). He instructed that he would have his contractor to perform the job. |
0852090077 | 2017-01-13 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
0860709774 | 2014-03-05 | Drill / Deepen / Reopen | No Violations | Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time. |
0868905004 | 2018-11-06 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
0870340656 | 2013-08-30 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig #18 drilled a 17.5 well bore to a total depth of 900 and ran 896 of 13-3/8 61# CSG J-55 casing. Baker Hughes pumped 170 barrels of water follow by 35 barrels of Gel with Fed Seal and cello flake and 10 barrels of fresh water spacer. They pumped 760 sacks of PNE-1+.05S-F-2CACL2+.5BA10A cement. Displaced with 130 barrels of water. Good circulation through out job. There was 50 barrels of returns. Bumped and held plug. Shut cement head in. This job was covered by Inspector Rick Skidmore. |
1235973870 | 2014-06-11 | Administrative Inspection | No Violations | I was on location with Geologist Mike McCormac and Geologist Teresa McQuade from the ODNR Columbus Office and also Adam Mullet a production personal from Hilcorp. Adam was explaining how the Gas Production Units ( GPU ) measured the gas and fluids before it went to the central production facility. The production facility is where the gas enters the sales point and the water and oil/condensate is collected. |
1247349587 | 2014-01-31 | Production Wells | No Violations | Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time. |
1378281651 | 2013-08-30 | Drill / Deepen / Reopen | No Violations | I witnessed Baker Hughes cement the surface casing for Hillcorp. Falcon Drilling drilled a 17.5 Hole #2 to 900 RKB and set 13.375 casing at 899 RKB with 7 centralizers. The casing had a weight of 61 lbs/ft and a P-55 grading. Baker Hughes established circulation and pumped 35 bbls of gel. The operator pumped 766 sacks of Class A cement and displaced the cement to 852 RKB with 129.7 bbls of fresh water. I witnessed approximately 40 bbls of good cement returned to surface. Cement was inspected 20 minutes after completion and was static at surface. |
1380726134 | 2013-09-03 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig 18 drilled a 12.25 well bore to a total depth of 2543 and ran 2543 of 9.625 36# J-55 CSG casing. Baker Hughes pumped ahead 230 barrels of water followed by 35 barrels of Gel/Fed Seal/Cello Flake and 10 barrels. They pumped 887 sacks of PNE-1.05% STATSTATFREE=1%CACL2=.75GAL/SK FP-6. They displaced with 190 barrels of fresh water. There was 37 barrels of cement returned to surface. Good circulation throughout the job. |
1388674801 | 2013-12-18 | Drill / Deepen / Reopen | No Violations | I performed a walk around inspection on the above location water trucks were vacuuming fresh water from the continament pad around H&P Rig 225. Location is clear of debris and fire extinguishers are located at various places around the drilling location. Permits are posted in Hilcorps Office. No violations were noted at this time. |
1392663004 | 2015-08-21 | Production Wells | No Violations | I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
1393107872 | 2016-09-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. I noticed that the annuals had 600 psi between the 13-3/8 and the 9-5/8. I called Tom Havanek Operations Manager and told him about the pressure. He set up a meeting for 9/9/2016 at 1:00 PM with his production personnel. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There are also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
1454522604 | 2016-01-20 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. This is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. CES Energy Services on location swabbing the wells. |
1482466355 | 2018-06-27 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
1536157441 | 2016-10-14 | Production Wells | No Violations | I performed a follow up inspection. Hilcorp has installed the gage and also installed 3/8 tubing on the 13-3/8 annuals into the flowline at present there is 0 psi. ID signs are posted no noted violation at this time. |
1576249882 | 2019-12-3 0:00: | PW | No Violations | 1.00 |
1612725756 | 2014-04-16 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. At this time there is no drilling or stimulations active at this location. There is various clean up operations on gone, removing containment, flowback equipment and tanks. Well is shut-in. |
1639393069 | 2013-07-18 | Drill / Deepen / Reopen | No Violations | Express Energy Service is on location drilling a 30 conductor hole to a depth of 90 and ran 90 of 20 94# conductor casing. They cemented with 172 sacks of class A cement. They had 13 barrels of cement returned to surface. . Permits are posted. There has been safety meeting. No violations at this time. Teresa McQuade and Ken Brown from the permitting department was on location to observe the operation. |
1644230990 | 2016-09-09 | Production Wells | No Violations | Northeast Region Supervisor Tom Hill and myself meet with Hilcorps Production personnel to discussed the annuals pressure 600 psi on this well. They removed the gage and bleed the pressure off. There was no noticeable pressure coming out of the needle valve They installed a new gage and will monitor the pressures. |
1745500621 | 2014-05-06 | Production Wells | No Violations | I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration can not be passed at this time. |
18030775 | 2014-12-26 0:00 | PW | No Violations | 1.00 |
1811961023 | 2019-7-12 0:00: | PW | No Violations | 1.00 |
1887143420 | 2017-06-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
1912155395 | 2015-11-02 | Production Wells | No Violations | I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time. |
2038254981 | 2015-09-28 | Production Wells | No Violations | I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time. |
61958723 | 2015-6-17 0:00: | PL | No Violations | 1.00 |
742668118 | 2016-9-30 0:00: | PW | No Violations | 1.00 |
852090077 | 2017-1-13 0:00: | PW | No Violations | 1.00 |
868905004 | 2018-11-6 0:00: | PW | No Violations | 1.00 |
For data sources see[9]