X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23202

Well Details

Well ID: 34-099-23202
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Jackson Township
Operator Name: HALCON OPERATING COMPANY INC
Well Pad ID: US-OH-000809
Farm/Lease Name: GRENAMYER
License Status: Not Drilled
License Date: 2013-10-24
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Horizontal
Latitude: 41.090000
Longitude: -80.830000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-10-24 Proposed Formations:POINT PLEASANT, Issued Date:10/24/2013, Expired Date:10/24/2015 12:00:00 PM, Drilling unit acres:359.07, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2014-03-27 UNIT SIZE CHANGED TO 359.28 ACRES.
Construction Permit Expires 2015-10-24 EXPIRED PERMIT, CONFIRMED WITH JOHN FLEMING, CONDUCTOR SET, WELL NEVER DRILLED, STATUS CHANGED 5/10/2016-ALE
Record Last Modified 2018-11-01 EXPIRED PERMIT, CONFIRMED WITH JOHN FLEMING, CONDUCTOR SET, WELL NEVER DRILLED, STATUS CHANGED 5/10/2016-ALE

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1468706113 2013-10-29 0:00 DD No Violations 3.00
-1666245542 2013-11-8 0:00: DD No Violations 1.00
1434378369 2015-04-27 Production Wells No Violations I meet with the Federal EPA at this location. They performed an Air Quality Inspection of the well and tank battery. I performed a status check of the tank battery and well head. ID signs are posted. No violations were noted at this time.
1468706113 2013-10-29 Drill / Deepen / Reopen No Violations Lighting Energy is on location drilling the 36 conductor hole for the 30casing. They are at a depth of 38. Cementing is set for 8:00 am tomorrow 10/30/2013. Permits are posted. J L Paris Construction is installing a 4 PVC pipe along the inside berm of the location to maintain control of any releases that may accrue while drilling or fracing of these wells. There are two catch basins one at the northeast corner and the other is at the southeast corner. All have valves that can be shut.
1666245542 2013-11-08 Drill / Deepen / Reopen No Violations I performed a status check on the above location. ID signs are posted at the entrance for the location off of New Road. The entire perimeter of the location has been fenced, 4 man gates were installed at various locations. The main entrance gates are locked. No active at this time.
1821538016 2013-10-30 Drill / Deepen / Reopen No Violations On 10/30/2013, Lighting Energy drilled a well 36 well bore to a total depth 60 and ran 60 of 99.2# CSL 30 conductor casing. Universal Well Service pumped 25 barrels of fresh water follow by 15 barrels of gel follow by 160 sacks of Type 1 3% Cacl2 1/4 unicele cement. Displaced with 37 barrels of fresh water. Good circulation throughout job. There was 20 barrels of cement returned to surface.

For data sources see[3]

References