If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-21953 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02,"lon":-81.79,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Guilford Township | |
Operator Name: NORTHEASTERN ENERGY | |
Well Pad ID: | |
Farm/Lease Name: COLE PJ& M | |
License Status: Final Restoration | |
License Date: 1986-04-30 | |
Spud Date: 1977-07-13 | |
Spud Drilling Contractor: | |
Final Drill Date: 1977-08-22 | |
Well Total Depth: 3686.00 ft | |
Configuration: Vertical | |
Latitude: 41.020000 | |
Longitude: -81.790000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1977-04-12 | 78 NORTHEASTERN ENERGY GeoDate 4/12/77 |
Original Spud | 1977-07-13 | |
Completed | 1977-08-22 | |
Reached Total Depth | 1977-08-22 | |
CO | 1986-04-30 | 78 NORTHEASTERN ENERGY GeoDate 4/30/86 |
COMBINATION WELL | 1986-04-30 | Issued Date 4/30/86 Expired Date 4/30/87 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date 6/25/86 |
Plugged/Abandoned | 1986-06-25 | |
Construction Permit Expires | 1987-04-30 | |
Record Last Modified | 2013-03-14 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3572 | 3629 | 12 |
3572 | 3629 | 12 | |
3572 | 3629 | 12 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2250 Bbl | 57000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | NORTHEASTERN ENERGY | 0.00 | 193.00 | 365 |
1985 | NORTHEASTERN ENERGY | 0.00 | 0.00 | 365 |
1986 | NORTHEASTERN ENERGY | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | NORTHEASTERN ENERGY | Brine | 0 | 365 |
1985 | NORTHEASTERN ENERGY | Brine | 0 | 365 |
1986 | NORTHEASTERN ENERGY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000DP5060 | Final Restoration | No Violations | Final Restoration done information from Data Point | |
DP5060 | FR | No Violations |
For data sources see[9]