If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-22319 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13,"lon":-81.68,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Copley Township | |
Operator Name: G & O RESOURCES LTD | |
Well Pad ID: | |
Farm/Lease Name: SLABAUGH UNIT | |
License Status: Plugged and Abandoned | |
License Date: 2014-08-26 | |
Spud Date: 1980-08-02 | |
Spud Drilling Contractor: | |
Final Drill Date: 1980-08-07 | |
Well Total Depth: 3752.00 ft | |
Configuration: Vertical | |
Latitude: 41.130000 | |
Longitude: -81.680000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1980-07-30 | 5 PENINSULA GROUP INC GeoDate 7/30/80 |
Original Spud | 1980-08-02 | |
Completed | 1980-08-07 | |
Reached Total Depth | 1980-08-07 | |
CO | 1991-11-13 | 201 GREEN GAS CO GeoDate 7/30/80 |
CO | 1992-09-01 | 4280 JRD ENERGY GeoDate 7/30/80 |
Change of Owner | 1997-08-04 | Operator changed from 4280, JRD ENERGY to 5894, G & O RESOURCES LTD |
APP | 2014-08-26 | Proposed Formations:CLINTON, Issued Date:8/26/2014, Expired Date:8/25/2016 12:00:00 PM, Drilling unit acres:20.8, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2014-10-29 | |
Construction Permit Expires | 2016-08-25 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3590 | 3610 | 15 |
3590 | 3610 | 15 | |
3590 | 3610 | 15 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 76580 Gal | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | PENINSULA GROUP INC | 9552.00 | 1092.00 | 365 |
1985 | PENINSULA GROUP INC | 8735.00 | 991.00 | 0 |
1986 | PENINSULA GROUP INC | 8587.00 | 854.00 | 365 |
1987 | PENINSULA GROUP INC | 7048.00 | 630.00 | 365 |
1988 | PENINSULA GROUP INC | 6209.00 | 552.00 | 102 |
1989 | PENINSULA GROUP INC | 4755.00 | 528.00 | 365 |
1990 | PENINSULA GROUP INC | 4529.00 | 477.00 | 365 |
1991 | PENINSULA GROUP INC | 3921.00 | 388.00 | 365 |
1992 | JRD ENERGY | 3522.00 | 411.00 | 365 |
1993 | JRD ENERGY | 4111.00 | 253.00 | 365 |
1994 | JRD ENERGY | 3838.00 | 292.00 | 365 |
1995 | JRD ENERGY | 3492.00 | 229.00 | 365 |
1996 | JRD ENERGY | 3439.00 | 205.00 | 365 |
1997 | JRD ENERGY | 1659.00 | 172.00 | 197 |
1998 | G & O RESOURCES LTD | 4130.00 | 169.00 | 365 |
1999 | G & O RESOURCES LTD | 3042.00 | 0.00 | 360 |
2000 | G & O RESOURCES LTD | 3250.00 | 146.00 | 360 |
2001 | G & O RESOURCES LTD | 2548.00 | 127.00 | 365 |
2002 | G & O RESOURCES LTD | 1639.00 | 0.00 | 365 |
2003 | G & O RESOURCES LTD | 1549.00 | 0.00 | 365 |
2004 | G & O RESOURCES LTD | 1566.00 | 0.00 | 365 |
2005 | G & O RESOURCES LTD | 1864.00 | 0.00 | 365 |
2006 | G & O RESOURCES LTD | 2016.00 | 0.00 | 365 |
2007 | G & O RESOURCES LTD | 1770.00 | 0.00 | 365 |
2008 | G & O RESOURCES LTD | 1309.00 | 0.00 | 366 |
2009 | G & O RESOURCES LTD | 1082.00 | 0.00 | 365 |
2010 | G & O RESOURCES LTD | 64.00 | 0.00 | 365 |
2011 | G & O RESOURCES LTD | 133.00 | 81.00 | 365 |
2012 | G & O RESOURCES LTD | 230.00 | 0.00 | 366 |
2013 | G & O RESOURCES LTD | 258.00 | 0.00 | 365 |
2014 | G & O RESOURCES LTD | 601.00 | 0.00 | 365 |
2015 | G & O RESOURCES LTD | 172.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | PENINSULA GROUP INC | Brine | 0 | 365 |
1985 | PENINSULA GROUP INC | Brine | 65 | 0 |
1986 | PENINSULA GROUP INC | Brine | 30 | 365 |
1987 | PENINSULA GROUP INC | Brine | 30 | 365 |
1988 | PENINSULA GROUP INC | Brine | 0 | 102 |
1989 | PENINSULA GROUP INC | Brine | 57 | 365 |
1990 | PENINSULA GROUP INC | Brine | 57 | 365 |
1991 | PENINSULA GROUP INC | Brine | 43 | 365 |
1992 | JRD ENERGY | Brine | 25 | 365 |
1993 | JRD ENERGY | Brine | 25 | 365 |
1994 | JRD ENERGY | Brine | 0 | 365 |
1995 | JRD ENERGY | Brine | 28 | 365 |
1996 | JRD ENERGY | Brine | 0 | 365 |
1997 | JRD ENERGY | Brine | 30 | 197 |
1998 | G & O RESOURCES LTD | Brine | 184 | 365 |
1999 | G & O RESOURCES LTD | Brine | 0 | 360 |
2000 | G & O RESOURCES LTD | Brine | 0 | 360 |
2001 | G & O RESOURCES LTD | Brine | 0 | 365 |
2002 | G & O RESOURCES LTD | Brine | 0 | 365 |
2003 | G & O RESOURCES LTD | Brine | 0 | 365 |
2004 | G & O RESOURCES LTD | Brine | 0 | 365 |
2005 | G & O RESOURCES LTD | Brine | 0 | 365 |
2006 | G & O RESOURCES LTD | Brine | 0 | 365 |
2007 | G & O RESOURCES LTD | Brine | 0 | 365 |
2008 | G & O RESOURCES LTD | Brine | 0 | 366 |
2009 | G & O RESOURCES LTD | Brine | 210 | 365 |
2010 | G & O RESOURCES LTD | Brine | 0 | 365 |
2011 | G & O RESOURCES LTD | Brine | 0 | 365 |
2012 | G & O RESOURCES LTD | Brine | 30 | 366 |
2013 | G & O RESOURCES LTD | Brine | 0 | 365 |
2014 | G & O RESOURCES LTD | Brine | 0 | 365 |
2015 | G & O RESOURCES LTD | Brine | 13 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-361280940 | 2014-6-9 0:00:0 | PW | No Violations | |
000PL12274 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0202865690 | 2014-10-29 | Plug / Plug Back | No Violations | Arrived on location on 10/29/2014 to witness plugging operations at the Slabaugh #1 well. Established circulation prior to setting the top 300 plug. Plug was set with no problems. Good cement was brought to surface. Cement fell down approximately 3 below ground level. Well will be cut-off, covered with a steel plate, and buried. |
0361280940 | 2014-06-09 | Production Wells | No Violations | Inspected production well on 06/09/2014. The tank battery consists of 1-210 bbl steel tank, 1-25 bbl steel steel tank, and a production unit within an earthen dike. The diked area is located within an unlocked metal fence. Small leaks were noted at the connections on the tanks that will need to be cleaned up. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with an electric motor. Ralph Gregory with G & O Resources was notified of these issues and will address them as soon as possible. No other problems were noted at the time of the inspection. |
1251323165 | 2014-10-28 | Plug / Plug Back | No Violations | Arrivied on location on 10/28/2014 to witness plugging operations at the Slabaugh #1 well. Nicks Well Plugging arrived on 10/27/2014, rigged up, and pulled rods and tubing. Bullheaded in the bottom plug with cottonseed hulls. Ripped 4 1/2 casing at 2,541. Established circulation prior to setting Big Lime/Oriskany plug and surface casing plug, which were set with no problems. Tripped out all production casing. Rigged up Appalachian Wireline. Set bridge plug at 310. Set down on bridge plug after it was set to confirm. Shut down for the day. Will return in the morning to finish plugging out well. |
1360865793 | 2013-02-14 | Production Wells | No Violations | I inspected this well and found one pump jack with electric motor on the wellhead. The pressure on the tubing was 50 psi. but there was no gauge installed on the casing so I could not determine the pressure. The pump jack unit was installed approx. three feet off of the ground and sat atop a support unit constructed of heavy pipe. No leaks were detected on the well or on the piping around the well and the area around the pump jack was well maintained. The tank battery contained one 210 bbl. steel oil storage tank, one 30 bbl. steel brine storage tank and one horizontal oil and gas separator unit with a working gas sales chart recorder. The proper identification sign was posted on the steel tank and no visible leaks were seen on the tanks or piping within the tank battery. The dike was in good shape and the area within and around the tank battery was well maintained. The entire tank battery was enclosed with a steel chain link fence with an access gate. |
202865690 | 2014-10-29 0:00 | PB | No Violations | |
PL12274 | PL | No Violations |
For data sources see[9]