{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.12,"lon":-82.06,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Chatham Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: GARVER GLENN & JESSIE | |
License Status: Producing | |
License Date: 1981-04-22 | |
Spud Date: 1981-04-23 | |
Spud Drilling Contractor: | |
Final Drill Date: 1981-05-23 | |
Well Total Depth: 360.00 ft | |
Configuration: Vertical | |
Latitude: 41.120000 | |
Longitude: -82.060000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-04-22 | 337 HARLEY DRILLING & PRODUCI GeoDate 4/22/81 |
Original Spud | 1981-04-23 | |
Completed | 1981-05-23 | |
Reached Total Depth | 1981-05-23 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | OPEN HOLE |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-644008702 | 2014-6-30 0:00: | PW | No Violations | |
000PL12129 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0012279419 | 2002-06-26 | Production Wells | No Violations | CASE 02-033 Uniontown office received a complaint from Mr. Clyde Johnson regarding crude oil spilled into a creek which crosses his property. While inspecting the site, a fresh oil spill was found in and adjacent to the storage tanks. Called Steve Harley while on site and requested an immediate meeting. In the meeting, Harley indicated that a flowline leak occurred in May which resulted in crude oil entering a drain tile which discharged into the creek. The OEPA responded to this spill and booms and sorbent pads were placed along 500 feet of the creek down stream from the drain tile discharge. A second release in June (NOT REPORTED) was caused by vandals opening a valve. This spill breached the northwest corner of the retention dike and impacted an area approximately 94 x 26. The impacted soil was covered. The latest spill (approximately 8 barrels) was attributed to a leaking stock tank. The impact area was inside the dike area. Steve Harley was ordered to empty the leaking tank and remediate the spill as soon as possible. Also requested that he remove the old sorbent pads and most of the old booms in the creek. He said the stock tank would be emptied today and that he would have a backhoe on site in the morning to excavate and remove the impacted soil from both June releases. |
002155i126 | 2002-06-27 | Production Wells | No Violations | Follow up inspection to check on spill remediation progress. The tank battery has been dismantled and the impacted soil is being removed. |
0644008702 | 2014-06-30 | Production Wells | No Violations | Inspected production well on 06/30/2014. The tank battery consists of 3-100 bbl steel tanks and an underground brine vault located within an earthen dike. A small accumulation of oil and paraffin was noted on the top of the brine vault that will need cleaned up. The tank battery is used by multiple wells; identification is posted for several of the wells producing into it (including this one), but not all of them. The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at the wellhead. Jason Klauss with Harley Drilling was notified of the need for clean-up around the tank battery and will address it as soon as possible. No other problems were noted at the time of the inspection. |
0712560244 | 2009-09-11 | Production Wells | No Violations | Well in production, equipped with pump jack, rods and tubing. Sun, 70 degrees. |
1108474392 | 2005-02-14 | Production Wells | Violations Noted | Called by Bart Ray of OEPA. Oil spill in wetland at N 41.12952-W 82.05842. Oil production line leading from well to tank battery split and oil drained in wetland. 25 x 20 area contaminated. Harley Drilling is in process of cleaning up spill under supervision of OEPA.Company has to build a road to get to site. No other violations at well site or tank battery. Rain, 45 degrees. Call made to Jay Cheslock by Bart Ray of OEPA. |
1109876399 | 2005-03-03 | Production Wells | Violations Noted | Majority of oil cleaned up in wetland. OEPA in charge of clean up. Line repaired. |
12279419 | 2002-6-26 0:00: | PW | No Violations | |
2155i126 | 2002-6-27 0:00: | PW | No Violations | |
712560244 | 2009-9-11 0:00: | PW | No Violations | 1.00 |
PL12129 | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1108474392 | US-OH-102680 | 2005-02-15 | Well insufficiently equipped to prevent escape of oil and gas | |
1109876399 | US-OH-102721 | 2005-02-15 | Well insufficiently equipped to prevent escape of oil and gas |