If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-23443 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02,"lon":-81.87,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: CSAPO LIMITED | |
Well Pad ID: | |
Farm/Lease Name: CONLEY DENVER & BONNIE | |
License Status: Final Restoration | |
License Date: 2005-04-19 | |
Spud Date: 1983-08-06 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 1983-08-10 | |
Well Total Depth: 3389.00 ft | |
Configuration: Vertical | |
Latitude: 41.020000 | |
Longitude: -81.870000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1983-07-28 | 265 CSAPO FRANK A JR GeoDate 7/28/83 |
Oil and Gas | 1983-07-28 | Issued Date 7/28/83 Expired Date 1/24/84 Acres 0040060 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03389 Proposed Drill Depth 03389 |
Original Spud | 1983-08-06 | CHG ACRE. 12-30-84 |
Completed | 1983-08-10 | CHG ACRE. 12-30-84 |
Reached Total Depth | 1983-08-10 | CHG ACRE. 12-30-84 |
Completion Report Received | 1985-01-11 | CHG ACRE. 12-30-84 |
APP | 2005-04-19 | Proposed Formations:CLINTON, Issued Date:4/19/2005, Expired Date:4/19/2006 6:00:00 AM, Drilling unit acres:40.31, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2006-02-21 | CHG ACRE. 12-30-84 |
Construction Permit Expires | 2006-04-19 | CHG ACRE. 12-30-84 |
Record Last Modified | 2015-09-24 | CHG ACRE. 12-30-84 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 0 | 0 | |
0 | 0 | ||
2006-09-11 | 3206 | 3264 | 26 |
3206 | 3264 | 26 | |
0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1800 Bbl | 30000 | FRAC:WATER/SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | CSAPO LIMITED | 30555.00 | 0.00 | 0 |
1985 | CSAPO LIMITED | 56873.00 | 89.00 | 365 |
1986 | CSAPO LIMITED | 24141.00 | 0.00 | 365 |
1988 | CSAPO LIMITED | 2001.00 | 0.00 | 365 |
1989 | CSAPO LIMITED | 3062.00 | 73.00 | 365 |
1990 | CSAPO LIMITED | 2212.00 | 42.00 | 365 |
1991 | CSAPO LIMITED | 1706.00 | 0.00 | 365 |
1992 | CSAPO LIMITED | 1808.00 | 0.00 | 365 |
1993 | CSAPO LIMITED | 1494.00 | 0.00 | 365 |
1994 | CSAPO LIMITED | 971.00 | 0.00 | 365 |
1995 | CSAPO LIMITED | 372.00 | 0.00 | 365 |
1996 | CSAPO LIMITED | 296.00 | 0.00 | 365 |
1997 | CSAPO LIMITED | 257.00 | 0.00 | 365 |
1998 | CSAPO LIMITED | 235.00 | 0.00 | 365 |
2000 | CSAPO LIMITED | 264.00 | 0.00 | 365 |
2001 | CSAPO LIMITED | 212.00 | 0.00 | 365 |
2002 | CSAPO LIMITED | 355.00 | 0.00 | 365 |
2003 | CSAPO LIMITED | 337.00 | 0.00 | 365 |
2004 | CSAPO LIMITED | 114.00 | 0.00 | 365 |
2005 | CSAPO LIMITED | 46.00 | 0.00 | 365 |
2007 | CSAPO LIMITED | 0.00 | 23.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | CSAPO LIMITED | Brine | 0 | 0 |
1985 | CSAPO LIMITED | Brine | 65 | 365 |
1986 | CSAPO LIMITED | Brine | 100 | 365 |
1988 | CSAPO LIMITED | Brine | 18 | 365 |
1989 | CSAPO LIMITED | Brine | 3 | 365 |
1990 | CSAPO LIMITED | Brine | 25 | 365 |
1991 | CSAPO LIMITED | Brine | 0 | 365 |
1992 | CSAPO LIMITED | Brine | 0 | 365 |
1993 | CSAPO LIMITED | Brine | 0 | 365 |
1994 | CSAPO LIMITED | Brine | 0 | 365 |
1995 | CSAPO LIMITED | Brine | 13 | 365 |
1996 | CSAPO LIMITED | Brine | 18 | 365 |
1997 | CSAPO LIMITED | Brine | 0 | 365 |
1998 | CSAPO LIMITED | Brine | 13 | 365 |
2000 | CSAPO LIMITED | Brine | 0 | 365 |
2001 | CSAPO LIMITED | Brine | 0 | 365 |
2002 | CSAPO LIMITED | Brine | 0 | 365 |
2003 | CSAPO LIMITED | Brine | 0 | 365 |
2004 | CSAPO LIMITED | Brine | 0 | 365 |
2005 | CSAPO LIMITED | Brine | 30 | 365 |
2007 | CSAPO LIMITED | Brine | 60 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-32251412 | 2005-9-8 0:00:0 | FR | No Violations | 0.50 |
000PL11767 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0032251412 | 2005-09-08 | Final Restoration | No Violations | Plug date 5-26-2005. Pit closed, needs production line removed and limestone removed. Cloudy, 70 degrees. |
1140543030 | 2006-02-21 | Final Restoration | No Violations | Final restoration approved. Stone removed. Cloudy, 30 degrees. |
PL11767 | PL | No Violations |
For data sources see[9]